Vous êtes sur la page 1sur 1

QATAR INTEGRATED RAIL PROJECT

Doha Metro: Green Line Underground Project

FM 200 PIPE FITTINGS-SHIELD

M008-PSH-FRS-MAR-00055

PREPARATION BY CONTRACTOR:

Action Name Signature Role Company Date

Originator Mubashar Ahmed RGL JV


MEP Engr.

Checker Zaldy Alino Sr. QA/QC Manager RGL JV

Reviewer Timothy Murley QC Manager PSH JV

Approval Richard Bridgeford Project Director PSH JV

APPROVAL:

Action Name Signature Role Date

Recommendation for Jassim Mohammed Al


Ansari
Engineer’s Assistant
Approval

Approval Daniel Leckel Engineer

Document Number: M008-PSH-FRS-MAR-00055 Rev 3 Page 1 of 1 16-01-2018


Uncontrolled if printed, refer to EDMS for current version