Boilersinfo.

com

BY MD. AKHTAR
Boilersinfo.com

BOILER LINE UP
WATER SIDE
BOILER AUXILIARIES LINE UP(FD/ID/PA/RAPH/CC
PUMP/DAMPERS/SAF)
OIL SIDE LINE UP
STEAM SIDE LINE UP
AIR SIDE LINE UP(IAC/PAC/ECW)
BOTTOM ASH HOPPER LINE UP
ESP LINE UP
DOSING SYSTEM/CBD/EBD LINE UP
Boilersinfo.com

PURGE PERMISSIVE
 All HFO Nozzle Valves Closed
 ALL LONV Valves Closed
 HFO Trip Valve closed
 All Pulverizers Off.
 All Feeders Off
 Air Flow Between >30% AND <40%.
 All Flame Scanners Sense No Flame
 All Auxiliary Air Dampers Modulating
 Both PA fans Off
 All HAGS Closed
 No Boiler Trip From MFT.
Boilersinfo.com

BOILER PROTECTION
Both ID fan trips
Both FD fan trips
Drum level high
Drum level very low
Furnace pressure very high
Furnace pressure very low
Water wall circulation not correct
Less than fireball &loss of AC supply in any elevation
Loss of 220 V DC for more than 2 sec
Unit flame failure
Loss of all fuel trips
All Boiler feed pump tripped
BOILER
Boilersinfo.com

PROTECTION
Reheater protection
Boiler emergency trip
All secondary air heater OFF
Air flow less than 30%
Boilersinfo.com
HFO SUPPLY SCHEME
FROM AUXILIARY
FROM HFO STEAM HEADER
DAY TANK

HFO PUMP-1

HFO
s HTR-1 s

HFO PUMP-2
TO BOILER
HFO FRONT
s HTR-2 s

HFO PUMP-3

HFO
s
s
HTR-3

TO HFO
DAY TANK
Boilersinfo.com

HFO SCHEME AT BOILER FRONT


HOFCV
HOTV

FT

AB ELEVATION

CD ELEVATION

M EF ELEVATION

GH ELEVATION

SHORT FT
RECIRCULATION

HORV

HFO HFO
SUPPLY RETURN
LINE LINE
Boilersinfo.com
ATOMISING STEAM SCHEME AT BOILER FRONT

AB ELEVATION

CD ELEVATION

EF ELEVATION

GH ELEVATION

OIL GUN CONNECTION

HFO NOZZLE
VALVE SCAVENGE OIL GUN
VALVE

ATOMISING
STEAM VALVE
Boilersinfo.com
Fire from a tilted nozzle
Boilersinfo.com
Boilersinfo.com
Tangential firing system fire ball
Boilersinfo.com

COAL COMPARTMENT ASSEMBLY


Boilersinfo.com

WARMING UP AND PARAMATERS


RAISING

Regulate firing to restrict the boiler water temp. rise at


110oC/hr. and maintain furnace exit gas temp. below
540oC till HP-LP bypass is charged.
During the warming up period, ensure the
economiser recirculation v/v (E-20) is open.
Carry out hourly APH Soot blowing during period of
oil firing
Charge ESP when flue gas temp. at outlet of APH’s
reaches above100oC.
Ensure CC pump Emergency tank is full.
Boilersinfo.com