Vous êtes sur la page 1sur 3

DESIGN ANALYSIS AND COMPUTATION OF SEWAGE

FOR URBAN STORM DRAINAGE DESIGN

1 AVERAGE SEWAGE FLOW (ASF)


(80%) (ADD) 0.530

2 5 / P0.2
PEAK SEWAGE FLOW (PSF)
Peak Factor ( P.F )
Let = P the population in Thousand
*if smaller than 5 used 5 6.793, 5

Peak Sewage Flow ASF * F


2.650

3 STORM WATER FLOW


Area ( A ): Should be measured: Let A = 3155 sq.m. convert to 0.003155sq.km
Run-off Coefficient: 40%-100% - 0.4
Rainfall Intensity ( i ) : 150 mm/hr (50-250mm/hr)
Concentration Time : 30 mins (30MIN-1HR)
Returnd Period; 20 years

Q = 0.278 CiA (DRAINAGE) 0.0526 CU.M/S


52.600 LPS

4 DESIGN FLOW = PEAK FLOW + STORM WATER FLOW =55.250

5 MAXIMUM SIZE OF COMBINE DRAINAGE AND SEWAGE PIPE

Q=A*V
WHERE: V = 1 /n R2/3S1/2 R = d/4
Q=item no.3 S = 0.030
n =0.013
Q = 4.153 d8/3
D= 0.198 or 200mm
Then d can be determine as your initial diameter of your sewage design
COMPUTATION OF COMBINED DRAINagE AND SEWER SYSTEM
20

27
4

Computation: D. From Continuity Eqn


A. Name of Street : Q = A*V
or 30

No. of Lots: Q = QT
Increment (Population): where:
Total Increment Population: S = Upper Elev - Lower Elev. / Total Length (MH to MH)
Length: R = d/4
Manhole ___ to "D" can be solved
Manhole___ Area
Increment: Total Area: E. Checking of Q

Maximum Storm Water Flow:


B. QD should not be greater than the QT
Q = 0.278CiA
Q1 = ____________ cu.m/s
____________ L/sec

C. Maximum Rate of Domestic Sewagw Flow:


Q2 = Total Inc. Pop. * Water Consumption * ____% * Peak Factor
Q total = Q1 + Q2
*See Table of Computation For More Details

Vous aimerez peut-être aussi