Vous êtes sur la page 1sur 5

Mohammed Hamid Khan

Electrical Engineer
Address : - 8C/20, Sector – 10, Kopar Khairane, Navi Mumbai - 400709,
Maharashtra, India.
Mobile No. : - +91880233701
Email id : - mhk84@outlook.com, mhk1984@yahoo.com
Skype id : - mhk84@outlook.com

OBJECTIVE
I am seeking a position that will provide me the opportunity to broaden my
professional experience with new prospects and challenges i.e. to obtain a career
growth oriented position by setting standards of excellence and to help the
company achieve its objectives and boost its corporate image

E DUCAT I O N
University of Mumbai
Aug. 2009
B. E. in Electrical Engineering

M a h a r a s h t r a S t a t e B o a r d o f Te c h n i c a l E d u c a t i o n ( M S B T E )
Jan. 2006
Diploma in Industrial Electronics

TECHNICAL COURSES
CADD Centre
Sept. 2009
Auto-CAD

CADD Centre
Sept. 2009
Primavera P6.2

PA S S P O R T D E TA I L S
Passport Number - K6987567
Place of Issue - Thane, Maharashtra, India
Date of Issue - 08th Nov. 2012
Date of Expiry - 07th Nov. 2022
Passport Category - ECNR
Mohammed Hamid Khan
P E R S O N A L D E TA I L S
Father’s Name - Mohammad Qamruddin Khan
Mother’s Name - Hajra Khan
Marital Status - Married
Wife’s Name - Naheed Perween
Nationality - Indian
Religion - Islam
Date of Birth - 02nd Nov. 1984
Place of Birth - Mumbai, Maharashtra, India
Languages Known - English, Hindi, Urdu, Marathi, Arabic (Basic)

SKILLS & ABILITIES


 132/ 33/ 11 KV Overhead and Underground Electrical Systems
 Low Current or Extra Low Voltage (ELV) Systems
 HVAC, Drainage and Plumbing System
 Oil and Gas, Airport, Hotel, Residential and Commercial Building Projects
 Civil, Electrical, Mechanical Work Contract Management, and Site
Management
 Knowledge of Auto-CAD, MS-Project, Primavera, MS-Office
 Review engineering design power substations layout
 EPC and MEP project, Procurement , QA/QC Policy
 Knowledgeable in construction safety (EHS)
 Strong sales marketing strategy and contract proposal
 Knowledgeable BS, CSA, IEEE, IEC, FIDIC and NFPA

EXPERIENCE
M E P E n g i n e e r | O a s i s Te c h C o n t r a c t i n g L L C , D u b a i , UA E
03rd Dec. 2015 – 14th Feb. 2017
 Manage in engineering & contract management, project management site
supervision carrying out work solutions for civil and electrical for the
projects involved.
 Prepared Electrical procedures and Supervising Installation, Testing and
Commissioning of Electrical and ELV System.
 Reviewed contract and tender documents to ensure it is comply prior with
issuing to bidders. Participate in the pre-qualification of the construction
work.
 Created the bill of quantity on Excel files, create estimating data sheet for
the cost of materials, labor, contact venders to get quotation for materials
required based on engineering design drawings and SOW scope of work.
 Prepared QA/QC and EHS report for civil, electrical submittals submitted
by contractors in a timely approach. Report all technical components/
during stages (current and previous comments) to the Managing Director.
 Coordinated in Preparation of documents for clearance from the
Government Authorities at different level of Project.
 Coordinated with design team to prepare Shop Drawings and As-built as
per the local and International standard.
 Coordinated and Supervised in Installation, Testing and Commissioning of
Power and control Cables, Low Voltage Switchboards, Lighting System,

Page 2
Mohammed Hamid Khan
Earth Pits, Switchgear, Electrical distribution systems, HVAC system,
Plumbing system, Drainage system etc.
 Coordinated and supervised in installation, testing and commissioning of
ELV System such as Fire Alarm and Fire Protection System, Gate Barrier
Systems, CCTV, Information Control System, Public Address System, Access
Control System, Intrusion Alarm System, Parking Management System, BMS
and other Electronic Security Systems for Commercial and Residential
Buildings.
 Prepared log schedule plan document for civil and electrical installation.
 Responsible for day to day interaction with client / consultants /
subcontracts regarding the progress of the works.
 Approved sub-suppliers proposal complies with customer specification and
requirement. Insure the proposal is compliant with the customer RFQs.
 Used AutoCAD, MS-Project and Microsoft Office Tools for reviewing and
preparing project documents.
 Attended chair meetings with design team, design manager, erection team,
contractors, consultant and customer team to ensure all work are comply
with tender documents, and standards.
 Coordinated in preparation of Handover documents, reviewing and
getting approved from the responsible person.
 Coordinated in Corrective and Preventive maintenance of completed
projects.
 Reviewed and make reports all the change requests / variations orders
submitted by the contractors and consultants.

Electrical Engineer | Cegelec Qa tar WLL , Doha, Qatar


10th Oct. 2014 – 26th Nov. 2015
 Involved and coordinated with ABB Company all meetings with customers,
and contractors. Develop all business development, marketing; build
positive relationships with clients, consultants, suppliers, and subcontractors.
 Review construction design document electrical concept design drawings
submitted by client for commercial and industrial building.
 Review all high voltage electrical substations, SLD drawings, contracts
technical specifications, as built drawings.
 Supervise and site visit as per project and contractors request by
customers.
 Attend meeting with contractors for project power measurement, AIS
substation, HV/ MV cables distribution, power transformers, switchgears,
electrical building services switchboards.
 Review RFP for electrical engineering drawings, contracts management,
technical specifications, scope of work, RFI reports, review and make
comments to concept design and phases for civil and electrical technical
specification.
 Ensure all correctness are comply with scope of works, design drawings
and signed contract agreement.
 Prepare QA/QC and EHS report for civil, electrical submittals submitted
by contractors in a timely approach. Report all technical components/
during stages (current and previous comments) to the senior project
manager.

Page 3
Mohammed Hamid Khan
 Chair meetings with design team, design manager, erection team,
contractor’s consultant and customer team to ensure all work are comply
with tender documents, and standards.
 Prepare log schedule plan document for civil and electrical installation
cables, overhead wires and layout drawings, tray routing, installation high
voltage and medium voltage switchgears, transformers, and capacitor
banks.
 Reports and review all alternative solutions in concept design/ design
stages changes by writing technical recommendation to senior Managers.
 Review the materials proposed by the Design Consultant(s) and propose
alternatives to improve the quality, future maintenance, safety and cost
effectiveness.
 Review and make reports all the change requests / variations orders
submitted by the contractors and consultants.

Electrical Engineer | Safari Company Limited , J eddah, KSA


10th Dec. 2012 – 27th Aug. 2014
 Review construction design document electrical concept design drawings
submitted by client for commercial and industrial building.
 Review all high voltage electrical substations, SLD drawings, Low Voltage
drawings, contracts technical specifications, as built drawings.
 Supervise and site visit as per project and contractors request by
customers.
 Attend meeting with contractors for project power measurement, substation,
HV/ MV cables distribution, power transformers, switchgears, electrical
building services switchboards.
 Review RFP for electrical engineering drawings, contracts management,
technical specifications, scope of work, RFI reports, review and make
comments to concept design and phases for civil and electrical technical
specification.
 Ensure all correctness are comply with scope of works, design drawings
and signed contract agreement.
 Report all technical components/ during stages (current and previous
comments) to the senior project manager.
 Attending meetings with design team, design manager, erection team,
contractor’s consultant and customer team to ensure all work are comply
with tender documents, and standards.
 Prepare log schedule plan document for civil and electrical installation
cables, overhead wires and layout drawings, tray routing, installation high
voltage and medium voltage switchgears, transformers, and capacitor
banks.
 Reports and review all alternative solutions in concept design/ design
stages changes by writing technical recommendation to senior Managers.
 Prepared of change requests / variations orders and submit to the Senior
Project Manager.

S i t e E n g i n e e r | L a r s e n a n d To u b r o L i m i t e d , M u m b a i , I n d i a
03rd Dec. 2015 – 14th Feb. 2017
 Maintained close contact with the contractors appointed and the client in
order to coordinate the implantation of contract management, all civil and
electrical work.

Page 4
Mohammed Hamid Khan
 Managed with clients requirements follow up all the time schedules and
deadlines, and make sure all work are reflected all the requirements of
the client and SOW.
 Prepare internal reports and work progress to the Project Manager.
 Acted as the consultant for energy and power distribution management.
 Coordinated and manage the preparation of the detail design of the high-
to-medium, medium-to-low and low-to-building distribution network.
 Made sure that all the approved amendments and changes on the
drawings and specifications are fully comply with tender documents.
 Coordinated in Installation, Testing and Commissioning of High Voltage
(HV), Low voltage (LV) and Extra Voltage (ELV) System.
 Coordinated the preparation of all the necessary time schedules and
budgets and integrate them to the master schedule plan.
 Prepared all reports as per client’s requests and attend all the related
weekly meetings.
 Involved in all the meeting needed during the tender’s evaluation period.
Established good cooperation with the contractors and follow up the works.

Site Engineer | Unicorn Controls Pvt. Ltd., Mumbai, India


03rd Dec. 2015 – 14th Feb. 2017
 Coordinated and supervised in installation, testing and commissioning of
ELV System such as Fire Alarm and Fire Protection System, Gate Barrier
Systems, CCTV, Public Address System, Access Control System, Intrusion
Alarm System, BMS and other Electronic Security Systems for Commercial
and Residential Buildings.
 Coordinated in preparation of As-Built and Handover documents.
 Attended internal progress meetings and client meetings.
 Prepared log sheet of completed and ongoing tasks.
 Maintained measurement and quantity of the materials installed.
 Maintained log sheet of materials received as per date.
 Prepared Material Request and submitted to the Project Manager.

DE CL A RAT I O N
I hereby declare that all the details given above are true. I assure that I will abide
the rules of the organization be sincere and truthful in my duty. Further documents
will be available on request.

Page 5

Vous aimerez peut-être aussi