Performance Based Road Contract Schedule of Defects : Ghazi- Serikot - Panian - S-1

Total Km= 40
Available Km for PBM after excluding Urban Section=0.0 Km
Number of Section=2
Performance Based Road Contract Ghazi- Serikot - Panian - S-1 DWG. No. 01
Location Map
3

Performance Based Road Contract Ghazi- Serikot - Panian - S-1

Table No. 1 - Pavement Schedule


Locations are indicative only. On commencement of Works, the Contractor shall confirm and mark locations.
Notes 1. Start chainage CH 0.00 - Mashwani Chowk at S-1
2. All chainages on this schedule measured by GPS odometer
3. All damage to be repaired in compliance with the Specifications
Section -1 Ghazi to Serikot
Total Length 16.60 Km
Urban Area Nil
Available Length for 16.60 KM
PBM
Potho Wide Revalli Loss Defecti Bleed
Pavem Alligato
les cracks ng/ of ve ing
ent r Remarks and other
Chainage (KM) total total Chip Pavem Patch (SM)
width Cracks defects
area length Loss ent(S Work
(M) (SM)
(SM) (M) (SM) M) (SM)
Total= Section (1+2) =9 M=31 L=5 L=2226 L=102 H=1148 L=35 Road section is
M=98 M=4 M=466 M=22 Triple (TST)
H=63 H=22 Surface Treatment
Road constructed in
2006-2007.
Total -Section-1 L=9 L=5 M=438 L=102 H=1148
M=98 M=4 M=22
H=63 H=22

0 + 000 1 + 000 7.3 M=1 M=385 H=33 PBM SECTION


START

Road cutting at
three locations by
utility department
1 + 000 2 + 000 7.3 M=5 L=2
L=7
2 + 000 3 + 000 7.3 H=18
3 + 000 4 + 000 7.3 H=30 M=53
4 + 000 5 + 000 7.3 H=13
5+ 000 6 + 000 7.3 L=1
6 + 000 7 + 000 7.3
7+ 000 8 + 000 7.3 M=10
8 + 000 9 + 000 7.3 M=22 H=1095
9 + 000 10 + 000 7.3 M=15
10 + 000 11 + 000 7.3 L=2
M=6
11 + 000 12 + 000 7.3 M=3
12+ 000 13 + 000 7.3 M=33
H=47
13+000 14+000 7.3 L=102
M=22
14 + 000 15 + 000 7.3 L=2 H=22
15 + 000 16 + 000 7.3 M=1 TST Section End
and AC Section
Start
16 + 000 16+600 7.3
PBM SECTION
4

END

From 16.00km AC
road start. Road
section was
constructed on 2014
Section -2 Serikot to Panian
Total Section -2 M=31 L=2226 L=35 Road section is
M=28 Asphalt Concrete.
Constructed in
2014
16 + 600 17 + 000 7.3 L=986 PBM SECTION
START

17 + 000 18 + 000 7.3 L=1080


18 + 000 19 + 000 7.3
19 + 000 20 + 000 7.3
20 + 000 21 + 000 7.3
21+ 000 22 + 000 7.3
22+ 000 23+ 000 7.3
23+ 000 24 + 000 7.3 M=9
24 + 000 25 + 000 7.3
25 + 000 26 + 000 7.3 M=22
26 + 000 27 + 000 7.3
27 + 000 28 + 000 7.3
28+ 000 29 + 000 7.3
29+000 30+000 7.3
30 + 000 31 + 000 7.3 L=38
31 + 000 32 + 000 7.3 L=122
32 + 000 33+000 7.3 M=28 L=35
33 + 000 34 + 000 7.3
34 + 000 35 + 000 7.3
35 + 000 36+ 000 7.3
36 + 000 37 + 000 7.3
37+ 000 38 + 000 7.3
38 + 000 39 + 000 7.3
39 + 000 40 + 000 7.3 PBM SECTION
END

Proposed Treatment : Section -1 Ghazi to Serikot . Repair of cracks and 5 cm AC wearing course on
entire pavement.
Section-2 : For Revalling = Slurry Seal , For Potholes , Cracks = Patchwork
L= Low Intensity , M= Medium Intensity H= High Intensity
5
Performance Based Road Contract Ghazi- Serikot - Panian - S-1

Table No. 2 - Shoulders, Side Drains, Slopes Schedule


Locations are indicative only. On commencement of Works, the Contractor shall confirm and mark locations.
Notes 1. Start chainage CH 0.00 - Mashwani Chowk at S-1
2. All chainages on this schedule measured by GPS Odometer
3. All damage to be repaired in compliance with the Specifications
4. All Open Lined Drains to be cleared of vegetation, debris, built-up sedimentation and blockages.

Section-1 Ghazi to Serikot


Paved Shoulder Drain
Shoulder drop-off Drain
Gravel Shoulder Required Length Erosion Required Side slope Back slope
>50mm or >75mm Required
Required Length damage Cleansing damage damage
Chainage for >20m Length Remarks
Length
LHS LHS LHS RHS LHS RHS LHS RHS LHS RHS LHS RHS LHS RHS
RHS(SM) RHS(SM)
(SM) (SM) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
1586 1586 1644 8298 3130 2096
Total Section 1 &2 5 Vegetation
Total Section 1 1090 1090 5853 5888 2570 1954 control on both
0 + 000 1 + 000 580 760 sides of the road
to a minimum
width of 3m from
the edge of road
up to property
line , protection
wall or drain
edge , clearing all
deposits , make
shoulder in
proper shape
and slope along
1 + 000 2 + 000 130 325 the pavement
edge in
accordance with
inlet level of
drain as per
specification and
as directed by
engineer in
charge. Refer
shoulders, side
drains, slopes
6
schedule for
details.

100 100 Paved Shoulder


2 + 000 3 + 000 250 280 50x2 m on both
side
60 60 Paved Shoulder
3 + 000 4 + 000 710 195 30x2 m on both
side
4 + 000 5 + 000 100 445 200
5+ 000 6 + 000 360
6 + 000 7 + 000 1000
7+ 000 8 + 000 800 220 257
8 + 000 9 + 000 358
200 200 Paved Shoulder
9 + 000 10 + 000 230 770 100x2 m on both
side
160 160 Paved Shoulder
10 + 000 11 + 000 200 800 80x2 m on both
side
120 120 Paved Shoulder
11 + 000 12 + 000 1000 60x2 m on both
side
120 120 Paved Shoulder
12+ 000 13 + 000 325 558 60x2 m on both
side
80 80 Paved Shoulder
13+000 14+000 235 615 40x2 m on both
side
110 110 Paved Shoulder
14 + 000 15 + 000 215 750 55x2 m on both
side
60 60 Paved Shoulder
15 + 000 16 + 000 200 400 30x2 m on both
side
80 80 Paved Shoulder
16 + 000 16+600 735 40x2 m on both
side
Section-2 Serikot to Panian
496 496 1059
Section-2 2410 560 142 Vegetation
2
control on both
16 + 600 17 + 000 380 235 139 142
sides of the road
17 + 000 18 + 000 400 150 186
7
to a minimum
width of 3m from
the edge of road
up to property
line , protection
wall or drain
edge , clearing all
deposits , make
shoulder in
proper shape
and slope along
the pavement
edge in
accordance with
inlet level of
drain as per
specification and
as directed by
engineer in
charge. Refer
shoulders, side
drains, slopes
schedule for
details.

18 + 000 19 + 000 560 440


19 + 000 20 + 000 602
100 100 Paved Shoulder
20+ 000 21 + 000 1000 50x2 m on both
side
80 80 Paved Shoulder
21+ 000 22 + 000 760 10 40x2 m on both
side
22 + 000 23 + 000 860
23+ 000 24 + 000 50 85
120 120 Paved Shoulder
24 + 000 25 + 000 860 60x2 m on both
side
110 110 Paved Shoulder
25 + 000 26 + 000 790 55x2 m on both
side
26 + 000 27 + 000 830
8
27 + 000 28 + 000 1000
86 86 Paved Shoulder
28+ 000 29 + 000 1000 43x2 m on both
side
29+000 30+000 1000 350
30 + 000 31 + 000 760 235
31 + 000 32 + 000 600
32 + 000 33+000
33 + 000 34 + 000
34 + 000 35 + 000
35 + 000 36+ 000 280
36 + 000 37 + 000
37+ 000 38 + 000
38 + 000 39 + 000
39 + 000 40 + 400
9

Performance Based Road Contract Ghazi- Serikot - Panian - S-1

Table No. 3 Culverts Schedule


Locations are indicative only. On commencement of Works, the Contractor shall confirm and mark locations.
Notes 1. Start chainage CH 0.00 - Mashwani Chowk at S-1
2. All chainages on this schedule measured by GPS Odometer
3. All damage to be repaired in compliance with the Specifications
4. All culverts inlets and outlets to be cleared of vegetation and debris including blockages
Section-1 Ghazi to Serikot
Chainage
Culvert Description Works Required Other Works
(KM)
79 culverts including 2
Ghazi to sarikot
multi cell culverts..
culverts inlets and outlets to be
cleared of vegetati culverts inlets
Exist. 1x2.5 SC,10.7m and outlets to be cleared of Parapet wall required on
0+786
length vegetation and debris including both side =2.5m
blockages on and debris including
blockages
Exist. 1x1.5 SC ,18.0 m culverts inlets and outlets to be
Parapet wall required on
1+000 Length cleared of vegetation and debris
both side =1.5m
including blockages
Exist. 1x3.10 SC ,13.7 culverts inlets and outlets to be
1+100 m cleared of vegetation and debris Parapet wall required on
Length including blockages both side =3.10m
Exist. 1x1.5 SC ,12.7 m culverts inlets and outlets to be
1+480 Length cleared of vegetation and debris
including blockages
Exist. 1x1.5 SC,13.0m culverts inlets and outlets to be
1+820 length cleared of vegetation and debris
including blockages
Exist. 1x2.5 SC,19.5m culverts inlets and outlets to be
3+330 length cleared of vegetation and debris
including blockages
Exist. 1x2.00 SC,18.2m culverts inlets and outlets to be
3+960 length, skew cleared of vegetation and debris
including blockages
Exist. 1x1.8 SC,16.0.m culverts inlets and outlets to be
4+600 length cleared of vegetation and debris
including blockages
Exist. 1x2.5 SC,16.0m culverts inlets and outlets to be
4+890 length cleared of vegetation and debris
including blockages
Exist. 2x7.0 SC, 19.0m culverts inlets and outlets to be
5+570 length cleared of vegetation and debris
including blockages
Exist. 1x2.9 SC,11.0m culverts inlets and outlets to be
6+300 length cleared of vegetation and debris
including blockages
Exist. 2x1.0 SC,20.0m culverts inlets and outlets to be
7+160 length cleared of vegetation and debris
including blockages
Exist. 4x1.9 SC,12.5m culverts inlets and outlets to be
8+460 length cleared of vegetation and debris
including blockages
Exist. 1x7.5SC,11.7m culverts inlets and outlets to be
8+520
length cleared of vegetation and debris
10

including blockages

Exist. 1x1.5 SC,13.0m culverts inlets and outlets to be


Parapet wall required on
8+670 length cleared of vegetation and debris
both side =1.15 m
including blockages
Exist. 1x0.9 SC,12.4m culverts inlets and outlets to be
9+100 length cleared of vegetation and debris
including blockages
Exist. 1x0.9SC,14.8m culverts inlets and outlets to be
9+240 length cleared of vegetation and debris
including blockages
Exist. 1x1.0 SC,12.3m culverts inlets and outlets to be
9+400 length cleared of vegetation and debris
including blockages
Exist. 2x7.5 SC,8.3m culverts inlets and outlets to be
9+770 length cleared of vegetation and debris
including blockages
Exist. 1x1.6 SC,12.5m culverts inlets and outlets to be
9+940 length cleared of vegetation and debris
including blockages
Exist. 1x1.2 SC,12.4m culverts inlets and outlets to be
10+400 length cleared of vegetation and debris
including blockages
Exist. 1x1.5 SC,12.4m culverts inlets and outlets to be
11+300 length cleared of vegetation and debris
including blockages
Exist. 1x1.4SC,21.0m culverts inlets and outlets to be
12+300 length ,Skew cleared of vegetation and debris
including blockages
Exist. 1x1.0 SC,11.8m culverts inlets and outlets to be
12+800 length cleared of vegetation and debris
including blockages
Exist. 1x1.2SC,14.0m culverts inlets and outlets to be
13+200 length cleared of vegetation and debris
including blockages
Exist. 1x2.10 SC,12.6m culverts inlets and outlets to be
13+400 length cleared of vegetation and debris
including blockages
Exist. 1x1.10 SC,12.4m culverts inlets and outlets to be
13+700 length cleared of vegetation and debris
including blockages
Exist. 1x1.5m SC,12.4m culverts inlets and outlets to be
14+600 length cleared of vegetation and debris
including blockages
Exist. 1x1.5SC,12.6m culverts inlets and outlets to be
14+700 length cleared of vegetation and debris
including blockages
Exist. 1x1.5SC,12.5m culverts inlets and outlets to be
Parapet wall required on
14+800 length cleared of vegetation and debris
both side =1.50 m
including blockages
Exist. 1x1.5SC,12.3m culverts inlets and outlets to be
Parapet wall required on
14+900 length cleared of vegetation and debris
both side =1.50 m
including blockages
Exist. 1x2.0 SC,12.4m culverts inlets and outlets to be
15+100 length cleared of vegetation and debris
including blockages
Section-2 Serikot to Panian
11

Exist. 1x2.10SC,10.8m culverts inlets and outlets to be


16+675 length cleared of vegetation and debris
including blockages
Exist. 1x2.0SC,12.4m culverts inlets and outlets to be
Parapet wall required on
17+680 length cleared of vegetation and debris
both side =2.0 m
including blockages
Exist. 1x1.5SC,12.3m culverts inlets and outlets to be
17+940 length cleared of vegetation and debris
including blockages
Exist. 1x1.5SC,14.5m culverts inlets and outlets to be
19+150 length cleared of vegetation and debris
including blockages
Exist. 1x1.5SC,12.4m culverts inlets and outlets to be
19+230 length cleared of vegetation and debris
including blockages
Exist. 1x1.5SC,12.4m culverts inlets and outlets to be
19+840 length cleared of vegetation and debris
including blockages
Exist. 1x1.0PC,12.4m culverts inlets and outlets to be
Parapet wall required on
19+990 length cleared of vegetation and debris
both side =1.00 m
including blockages
Exist. 1x1.5SC,13.8m culverts inlets and outlets to be
Parapet wall required on
20+190 length cleared of vegetation and debris
both side =1.50m
including blockages
Exist. 1x2.5SC,12.4m culverts inlets and outlets to be
21+050 length cleared of vegetation and debris
including blockages
Exist. 1x1.5SC,12.4m culverts inlets and outlets to be
21+260 length cleared of vegetation and debris
including blockages
Exist. 1x2.5SC,12.4m culverts inlets and outlets to be
21+340 length cleared of vegetation and debris
including blockages
Exist. 1x1.5SC,12.3m culverts inlets and outlets to be
22+210 length cleared of vegetation and debris
including blockages
Exist. 1x1.5PC,12.9m culverts inlets and outlets to be
22+670 length cleared of vegetation and debris
including blockages
Exist. 1x1.5PC,15.2m culverts inlets and outlets to be
22+870 length cleared of vegetation and debris
including blockages
Exist. 1x1.5SC,11.4m culverts inlets and outlets to be
23+350 length cleared of vegetation and debris
including blockages
Exist. 1x2.5SC,12.3m culverts inlets and outlets to be
23+890 length cleared of vegetation and debris
including blockages
Exist. 1x1.5SC,13.3m culverts inlets and outlets to be
24+300 length cleared of vegetation and debris
including blockages
Exist. 1x1.5SC,13.3m culverts inlets and outlets to be
24+520 length cleared of vegetation and debris
including blockages
Exist. 1x1.0SC,13.3m culverts inlets and outlets to be
24+930 length cleared of vegetation and debris
including blockages
Exist. 1x1.5SC,13.3m culverts inlets and outlets to be
25+110
length cleared of vegetation and debris
12

including blockages

Exist. 1x1.5SC,14.0m culverts inlets and outlets to be


25+230 length cleared of vegetation and debris
including blockages
Exist. 1x1.5SC,14.2m culverts inlets and outlets to be
25+330 length cleared of vegetation and debris
including blockages
Exist. 1x3.3SC,14.5m culverts inlets and outlets to be
25+500 length cleared of vegetation and debris
including blockages
Exist. 1x1.0PC,12.8m culverts inlets and outlets to be
25+600 length cleared of vegetation and debris
including blockages
Exist. 1x3.10SC,18.0m culverts inlets and outlets to be
25+850 length cleared of vegetation and debris
including blockages
Exist. 1x3.10SC,14.0m culverts inlets and outlets to be
25+900 length cleared of vegetation and debris
including blockages
Exist. 1x1.5SC,14.4m culverts inlets and outlets to be
26+900 length cleared of vegetation and debris
including blockages
Exist. 1x1.5SC,14.4m culverts inlets and outlets to be
27+400 length cleared of vegetation and debris
including blockages
Exist. 1x1.5SC,14.4m culverts inlets and outlets to be
27+900 length cleared of vegetation and debris
including blockages
Exist. 1x3.10SC,12.8m culverts inlets and outlets to be
28+100 length cleared of vegetation and debris
including blockages
Exist. 1x3.10SC,12.7m culverts inlets and outlets to be
28+500 length cleared of vegetation and debris
including blockages
Exist. 1x1.5SC,12.6m culverts inlets and outlets to be
28+700 length cleared of vegetation and debris
including blockages
Exist. 1x3.10PC,12.4m culverts inlets and outlets to be
28+900 length cleared of vegetation and debris
including blockages
Exist. 1x1.5SC,12.6m culverts inlets and outlets to be
Parapet wall required on
29+000 length cleared of vegetation and debris
both side =1.50 m
including blockages
Exist. 1x1.5SC,15.0m culverts inlets and outlets to be
29+550 length cleared of vegetation and debris
including blockages
Exist. 1x5.7SC,12.0m culverts inlets and outlets to be
29+700 length, skew cleared of vegetation and debris
including blockages
Exist. 1x1.5SC,12.4m culverts inlets and outlets to be
Parapet wall required on
30+000 length cleared of vegetation and debris
both side =1.50 m
including blockages
Exist. 1x1.5SC,14.3m culverts inlets and outlets to be
30+100 length cleared of vegetation and debris
including blockages
Exist. 1x6.6SC,14.3m culverts inlets and outlets to be
31+900 length cleared of vegetation and debris
including blockages
13

Exist. 1x5.4SC,13.4m culverts inlets and outlets to be


32+000 length cleared of vegetation and debris
including blockages
Exist. 1x8.38SC,13.5m culverts inlets and outlets to be
length cleared of vegetation and debris Parapet wall required on
32+600 including blockages both side =8.38 m

Exist. 1x1.5SC,12.0m culverts inlets and outlets to be


34+600 length cleared of vegetation and debris
including blockages
Exist. 1x1.5SC,12.0m culverts inlets and outlets to be
34+000 length cleared of vegetation and debris
including blockages
Exist. 1x1.5SC,12.0m culverts inlets and outlets to be
34+900 length cleared of vegetation and debris
including blockages
Exist. 1x1.5SC,12.02m culverts inlets and outlets to be
36+000 length cleared of vegetation and debris
including blockages
Exist. 1x1.5SC,12.04m culverts inlets and outlets to be
36+200 length cleared of vegetation and debris
including blockages
Exist. 1x1.5SC,12.05m culverts inlets and outlets to be
38+800 length cleared of vegetation and debris
including blockages
14

Performance Based Road Contract Ghazi- Serikot - Panian - S-1

Table No. 4- Road Signs Schedule


Locations are indicative only. On commencement of Works, the Contractor shall confirm and mark locations.

Notes
1. Start chainage CH 0.00 - Mashwani Chowk at S-1
2. All chainages on this schedule measured by GPS odometer
3. All road signs to be installed and reinstated as needed in compliance with the Specifications

Section Section Name Works required Remarks


Mandato Warning Inform KM Post
ry Sign - Sign / ative Total 138 signs
Number chevron Sign - Total 41 Km
Board Numbe Posts
Number r
29 93 16 41 Location , Type
and chainages
Total of signs are
marked in strip
plans
Section-1 Ghazi to Serikot 11 52 8 17
Section-2 Serikot to Pnian 18 41 8 24

Performance Based Road Contract Ghazi- Serikot - Panian - S-1

Table No. 5 - Pavement Marking


Locations are indicative only. On commencement of Works, the Contractor shall confirm and mark locations.

Notes
1. Start chainage CH 0.00 - Mashwani Chowk at S-1
2. All chainages on this schedule measured by GPS odometer
3. All road signs to be installed and reinstated as needed in compliance with the Specifications

Section Section Name Works required Remarks


Paveme Pav Cente Zebra Cat Eyes
nt Edge eme r Line Crossi Number
-Left nt Marki ng
Side- Edg ng- Locati
Km e- Km ons -
Left Numb
Side er
-
Km
40 40 40 14 7200 Location , Type and
chainages of
pavement marking,
Total
Zebra crossing and
cat eyes are marked
in strip plans
Section-1 Ghazi to Serikot 16.6 16.6 16.6 6 2990
Section-2 Serikot to Panian 23.4 23.4 23.4 8 4210
15

Performance Based Road Contract Ghazi- Serikot - Panian - S-1

Table No.6 Bridges Schedule


Locations are indicative only. On commencement of Works, the Contractor shall confirm and mark locations.
Notes 1. Start chainage CH 0.00 - Mashwani Chowk at S-1
2. All chainages on this schedule measured by GPS odometer
3. All bridge work needed in compliance with the Specifications
4. All bridges inlets and outlets to be cleared of vegetation and debris including blockages

Section-1 Ghazi to Serikot


Chainage Bridge
Type Current Condition Works required
(km) Name
Concrete Deck Required Protection work on both side
Dual Lane =200 m , Repair work for scouring
4+150 L=22.0 m , In good condition protection, Bridge inlets and outlets to
W=15.0 m be cleared of vegetation and debris
Span=10 including blockages , Informative signs.

Section 2: Serikot to Panian

Concrete Deck
Required minor repair on abutment
Dual Lane
wall ., Bridge inlets and outlets to be
30+400 L=30.0 m , In good condition
cleared of vegetation and debris
W=8.2 m
including blockages , Informative signs
Span=1
16

Performance Based Road Contract Ghazi- Serikot - Panian - S-1

Table No.7 Protection Work , Retaining Wall , Land Slide , Breast Wall
Locations are indicative only. On commencement of Works, the Contractor shall confirm and mark locations.
Note: 1. Start chainage CH 0.00 - Mashwani Chowk at S-1
2. All chainages on this schedule measured by GPS odometer
3. All bridge work needed in compliance with the Specifications
4. All bridges inlets and outlets to be cleared of vegetation and debris including blockages

Section- 1 Ghazi to Serikot


Required Required
Removal of Required Retaining Remarks and
Chainage (KM) Breast Wall Protection Wall
Slide(CM) Wall (M) other defects
(M) (M)
Total Section 1 & 2 Left Righ Left Right Left Right Left Side Right
Side t Side Side Side Side (RS) (LS) Side
(LS) Side (LS) (RS) (LS) (RS)
(RS)
4414 2249 721 630 2823 3279 1315 210

Section-1 65 1814 630 2223 665 915 210


0 + 000 1 + 000
1 + 000 2 + 000
35 80 275 PW=2+300 -
2 + 000 3 + 000 268 2+690 on
both side
100 PW=3+860 to
3 + 000 4 + 000 100 100 3+960 on
both side
4 + 000 5 + 000 30 462 126
PW=5+600 to
5+ 000 6 + 000 30
5+630 on ls
PW=6+000 to
6 + 000 7 + 000 20
6+220 on ls
7+ 000 8 + 000
236 135 PW=8+000 to
8 + 000 9 + 000 350 150
8+350 on ls
PW=9+000 to
9 + 000 10 + 000 100 65
9+100 on ls
310 89 PW=10+800
10 + 000 11 + 000 110 65 to10+910 on
ls
465 210 100 30 PW=11+700
11 + 000 12 + 000 to 11+800 on
rs
203 70 PW=12+800t
12+ 000 13 + 000 135 o 12+935 on
ls
PW= 13+200
13+000 14+000 165
to 13+365 ls
17

30 180 80 Pw =14+300 to
14 + 000 15 + 000 360 185
15+000 ls
28 200 Pw =15+700 to
15 + 000 16 + 000 300
16+000 ls
150 PW 16+000 to
16 + 000 16+600 285
16+400 ls
Section- 2 Serikot to Panian

Required Required
Removal of Required Retaining Remarks and
Chainage (KM) Breast Wall Protection Wall
Slide(CM) Wall (M) other defects
(M) (M)
Total Left Rig Left Right Left Right Left Side Right
Side ht Side Side Side Side (RS) (LS) Side
(LS) Sid (LS) (RS) (LS) (RS)
e
(RS
)
Section -2 4349 435 721 600 2614 400
16 + 600 17 + 000 150
688 35 185 250 PW=17+94
17 + 000 18 + 000 to 18+000 km
on rs
10 PW=18+400
18 + 000 19 + 000 to 19+000 km
on rs
98 PW=19+04to
19+ 000 20 + 000 19+38 km on
rs
140 PW=20+190
20+ 000 21 + 000 to 20+350 on
rs side
210 PW=21+220
21 + 000 22 + 000 to 21+430 on
rs side
45 110 60 168 PW=22+000
to 22+168 on
rs
22+ 000 23 + 000
PW=22+000
to 22+060 on
ls
435 230 PW=22+770
23 + 000 24 + 000 to 23+00 on
ls
630 135 210 160 PW=24+00 to
24+210 on rs
24 + 000 25 + 000 PW=24+140
to 24+300 on
ls
985 142 274 PW=8+260 to
25 + 000 26 + 000
8+900 on rs
505 85 386+385 PW=26+000t
26 + 000 27 + 000 o 26+386 to
on rs
18

286 74 230 PW=27+700


27 + 000 28 + 000 to 28+000 on
rs
289 30 100 PW=28+90to
28+ 000 29 + 000
29+00 on rs
732 210 PW=29+00to
29+000 30+000
29+210 on rs
189 110 188 100 PW= 30+00 to
30+200 rs
30 + 000 31 + 000
Pw =30+000 to
30+100 ls
31 + 000 32 + 000
32 + 000 33+000
33 + 000 34 + 000
34 + 000 35 + 000
35 + 000 36+ 000
36 + 000 37 + 000
37+ 000 38 + 000
38 + 000 39 + 000
39 + 000 40 + 400