BILL OF QUANTITY

PILING PACKAGE

No. Description Unit

BIG SILO PILING WORK

A. GENERAL REQUIREMENTS
1 Site Survey (Stacking Out) & Site Clearing Area (± 5700m2) ls
2 Temporary Facilities & Controls: ls
- Contractor's Office & storage and barracks
- Water, power and lighting for the works
- Security, safety, health & welfare of work people
- Temporary fencing high = 2m, L = 354m & signed board project
3 Project Documentation & Administration ls
4 Shop drawings & as built drawings ls
5 Mobilization and Demobilization ls
6 Insurance (CAR & Insurance of Contractor's personnel) ls

B. EARTH WORK
1 Excavation for Safety Ditch m3
2 Removed Disposal soil m3

C. FOUNDATION WORK
C.1 Supply & Install Spun Pile

Indicator pile shall be driven located as shown at plan piling silo until reach final set
criteria, and final pile length (main piling) will be order based on indicator pile data
1 Indicator Pile
1.1 Spun Pile dia. 600 mm, 19 meter depth

- Pre-stressed concrete spun pile dia. 600 mm L = 12 m (top/middle segment),


minimum concrete fc' = 52 Mpa, crack bending moment capacity 29 TON.M, ultimate m'
bending moment capacity 58 TON.M

- Pre-stressed concrete spun pile dia. 600 mm L = 7 m (bottom segment/pencil),


minimum concrete fc' = 52 Mpa, crack bending moment capacity 29 TON.M, ultimate m'
bending moment capacity 58 TON.M
1.2 Handling pile m'
1.3 Driven Pile m'
1.4 Joint pile ea

2 Main Piling
2.1 Spun Pile dia. 600 mm, 19 meter depth

- Pre-stressed concrete spun pile dia. 600 mm L = 12 m (top/middle segment), m'


minimum concrete fc' = 52 Mpa, crack bending moment capacity 29 TON.M, ultimate
bending moment capacity 58 TON.M (provisional volume)
- Pre-stressed concrete spun pile dia. 600 mm L = 7 m (bottom segment/pencil), m'
minimum concrete fc' = 52 Mpa, crack bending moment capacity 29 TON.M, ultimate
bending moment capacity 58 TON.M (provisional volume)
2.2 Handling pile m'
2.3 Pre-boring dia. 500 mm, 16.2 meter depth m'
2.4 Driven pile 16.2 meter depth m'
2.5 Joint pile ea

C.2 Testing for Piling


1 Dynamic Load test: nos
- PDA test (Pile Driving Analysis)
2 Static load test: 451 ton ls
- Lateral test, reaction system
ITY

Qty Unit Rate (IDR) Total (IDR)

-
-

-
-
-
-

-
-

-
-
-
-

-
-
-
-
-
-

- assume 4 titik load test dan 4 titik lateral


-
-
-
Total -