YANACOCHA PROJECT 2002

MINERA YANACOCHA S.R.L.

PROJECT N° 04463500

YANACOCHA PROJECT 2002

Nº 000.210.02110
TECHNICAL SPECIFICATION
FOR

CLEARING AND GRUBBING


Prepared by:

FLUOR DANIEL

APPROVED BY:

Lead Engineer Robinson Ucañán


Project Engineer Gordon Grams
Engineering Manager Roger Chapman
Client Simón Briggs

REV. BY ISSUE DATE CHK'D TECH.


APPROV'L
0 R.U. Issued for construction 28Jan02 D.V. A.B.

COMMENTS
This specification was issued with the number 4635-3-SP-001
MINERA YANACOCHA S.R.L Project Specification N° 000.210.02110

General Services Agreement 08 Jan 02


Contract N° 04463500 Sheet 2 of 5
Rev 0
FLUOR DANIEL

INDEX

1.0 GENERAL ............................................................................................................ 3


1.1 SUMMARY ..................................................................................................... 3
A. SCOPE OF SPECIFICATION................................................................... 3
B. WORK EXCLUDED.................................................................................. 3
C. RELATED SPECIFICATIONS .................................................................. 3

2.0 PRODUCTS ......................................................................................................... 3

3.0 EXECUTION ........................................................................................................ 3


3.1 PROTECTION ................................................................................................ 3
A. GENERAL................................................................................................ 3
B. MONUMENTS.......................................................................................... 4
C. PROTECTIVE BARRIERS ....................................................................... 4
3.2 CLEARING ..................................................................................................... 4
3.3 GRUBBING .................................................................................................... 4
3.4 DISPOSAL...................................................................................................... 4
3.5 SMOOTHING OF TERRAIN ........................................................................... 5

4.0 ATTACHMENTS................................................................................................... 5

L:\Tdc\Projects\0. General Information\Specifications\Fluor\0. Earthwork & Civil\4635-3-SP- CLEARING AND GRUBBING


MINERA YANACOCHA S.R.L Project Specification N° 000.210.02110

General Services Agreement 21 Jan 02


Contract N° 04463500 Sheet 3 of 1
Rev 0
FLUOR DANIEL

CLEARING AND GRUBBING

1.0 GENERAL

1.1 SUMMARY

A. SCOPE OF SPECIFICATION

This specification prescribes the complete removal and proper disposal of trees,
brush, roots, fences, pavements, surface rocks and boulders, and other objects
resting on or protruding through the surface of areas to be cleared, or cleared and
grubbed, and are designated on the plans or elsewhere in these specifications or
other contract documents.

B. WORK EXCLUDED

Exceptions are such items that are designated to remain or designated for
demolition according to Specification 000.210.02050.

C. RELATED SPECIFICATIONS

The following specifications prescribe items of related Work:

Concrete Structures Demolition Works 000.210.02050.

Coordinate Work prescribed by this specification with Work prescribed by the


above listed specifications.

2.0 PRODUCTS

Not applicable.

3.0 EXECUTION

3.1 PROTECTION

A. GENERAL

Avoid damage to the site and to existing facilities, trees, and shrubs designated to
remain.

L:\Tdc\Projects\0. General Information\Specifications\Fluor\0. Earthwork & Civil\4635-3-SP- CLEARING AND GRUBBING


MINERA YANACOCHA S.R.L Project Specification N° 000.210.02110

General Services Agreement 21 Jan 02


Contract N° 04463500 Sheet 4 of 1
Rev 0
FLUOR DANIEL

B. MONUMENTS

1. Protect benchmarks, baseline monuments, property corners, and other


temporary or permanent survey markers in the vicinity of the work from destruction
or disturbance.

Accurately restore at the earliest practical date any markers destroyed or


disturbed.

2. Within the area to be cleared, properly relocate survey markers that interfere
with the work, or witness the markers and then restore them after completing the
work.

Perform survey marker relocation or restoration work under the direct supervision
of a registered land surveyor.

C. PROTECTIVE BARRIERS

Before starting clearing operations, erect protective barriers around trees, shrubs,
and other facilities designated to remain. Barriers shall consist of 1.20 m high
woven wire fabric fencing supported by steel or wood posts spaced 1.80 m on
center (maximum). Erect barriers at or outside of the tree or shrub drip fine. Do not
use the area within protective barriers for traffic, storage, or any other purpose.
After clearing and grubbing work is complete, remove and dispose of protective
barriers.

3.2 CLEARING

Remove trees, brush, stumps, rubbish, and other debris and vegetation resting on or
protruding through the surface of areas to be cleared and grubbed. In areas to be
cleared only, cut off flush with or below the surface vegetation that is protruding through
the ground surface.

3.3 GRUBBING

In areas designated to be grubbed, remove the following materials to a depth of no less


than 0.30 m below the original ground surface: roots; stumps; and other debris, brush,
and refuse embedded in or protruding through the ground surface. Rake, disk, or plow
the area to a depth of no less than 0.15 m, and remove to a depth of 0.30 m all roots
and other debris thereby exposed.

3.4 DISPOSAL

Remove from the project site and dispose in designated sport areas and cover with
earth.

L:\Tdc\Projects\0. General Information\Specifications\Fluor\0. Earthwork & Civil\4635-3-SP- CLEARING AND GRUBBING


MINERA YANACOCHA S.R.L Project Specification N° 000.210.02110

General Services Agreement 21 Jan 02


Contract N° 04463500 Sheet 5 of 1
Rev 0
FLUOR DANIEL

Burning of site debris will not be permitted resulting from clearing or from clearing and
grubbing operations. When burning is permitted, it shall strictly comply with applicable
regional, provincial and local regulations. Obtain written permission when disposing
cleared and grubbed items into private property. File a copy of this permit with the
Owner’s Construction Manager.

3.5 SMOOTHING OF TERRAIN

After clearing and grubbing have been completed, eliminate stump holes, depressions,
ridges, and other irregular surface features by grading and backfilling to achieve a
surface suitable for subsequent construction operations. Shape the resulting surface for
positive drainage of surface runoff. Backfill as necessary by filling holes and
depressions with suitable material obtained within the Work area and by compacting to
a density equal to or greater than that of the surrounding undisturbed soil. Areas to be
excavated immediately after clearing and grubbing is complete need not be smoothed.

4.0 ATTACHMENTS

Not applicable.

End of Specification