Vous êtes sur la page 1sur 1

QA.

01

S.V. ENGINEERS
Plot No: 11/A3,IDA,PATANCHERU
FIT-UP INSPECTION REPORT
CUSTOMER : NUCLEAR FUEL COMLEX DRG.No. :SVE/1714/01 Rev-01
P.O.No. : W.O.No. : SVE/NFC/1714
FURNACE RAIL TEMPLATE FOR ARC REP.No. : SVE/QCA/1714/DIR-02
EQUIPMENT :
RE-MELTING FURNACE DATE : 23-12-2017
INSP. AGENCY: CUSTOMER

S.No Description Actual Dimensions Required Dimensions Remarks

Shell-1
1 Shell ID 1199, 1204 1200
2 Shell Length 620 610
3 Thickness 10 10
4 Flange ID 1220 1200
5 Flange OD 1350 1350
6 Flange Thickness 72 60
7 Ovality 5mm or 0.4%
Shell-2
1 Shell ID 1199, 1204 1200
2 Shell Length 620 610
3 Thickness 10 10
4 Flange ID 1220 1200
5 Flange OD 1350 1350
6 Flange Thickness 72 60
7 Ovality 5mm or 0.4%
Shell-3
1 Shell ID 798,802 800 Part no:02
2 Shell Length 618 610
3 Thickness 10 10
4 Flange ID 820 820 Part no:01
5 Flange OD 1220 1220
6 Flange Thickness 60 60
7 Ovality 4mm or 0.5%
Remarks:
1. All Dimensions are in mm unless otherwise specified.
2. Fillet weld throat thickness 8mm.
3. Visually checked and found satisfactory.
4. Machining of Ring Flanges has been done after fit-up.

For S.V.ENGINEERS For INSPECTION AGENCY

ENGINEER (Q.C.) DATE

Vous aimerez peut-être aussi