3/24/2017
Meeting with
Vendors of SCADA 0
system
Fault Calculations to
be revised 0
Submission of BOQ
to Alfara(Preliminary) 0
Developing Street
Light Design scheme 0
1.0
HT Side Work See Below
1.1 Follow up for 20.03.2017 21.02.2017 Sandeep
Submission
of HT BOQ to
1.2 Alfara(Prelimi
nary)
20.03.2017 25.02.2017 Sandeep7
Include
1.3 details of HT
Joints in BOQ
Meeting with
Vendors of
1.4 SCADA
system Sandeep/
20.03.2017 24.03.2017 Pranav Sir
1.5 Fault
Calculations Sandeep/
to be revised 20.03.2017 24.03.2017 Pranav Sir
3/20/2017 3/21/2017
3/21/2017 3/22/2017
Gantt Chart_x000D_