AGENDA

Development of Inspection Lists for the


Duration
plant equipment.
06-03-2017 - 12-03-2017 Determine completion of round of
equipment inspection for each area and
Focal Person line.
Determine time intervals at which
inspections of equipment will be done.
Determine inspection activities to be
carried out by Maintenance department
Development of equipment lists for the
non-listed equipment’s in CMMS.
Verification of the equipment lists