3‐06 , Appendix B Method
Based on 1997 Uniform Building Code Rev1.0
Project :‐ Project Designed by:‐ M. Abu Shady
Building :‐ Building Checked by:‐ M. Abu Shady
Element:‐ Element Date:‐ 11‐Jan‐18
Location:‐ Location M.A.S.
General Input :‐
tr= 0.00 m
Seismic Force
Direction of
L= 11.65 m tw= 0.50 m HL= 5.40 m Hw= 6.00 m
γL= 10.0 KN/m3
B= 5.00 m
Rectangular Tank Plan Rectangular Tank Elevation
γc= 24.0 KN/m3
fc= 35.0 N/mm2 Ec= 27805.6 N/mm2 ACI318‐08, Clause 8.5.1
g= 9.81 m/sec2
1‐Calculation the Equivalent Weight for impulsive Wi & convective Wc component:
2‐Calculation the Height of center of gravity for impulsive hi & convective hc components:
= 2.025 m ACI 350.3‐06, Eq 9‐3 & Eq 9‐4
= 3.098 m ACI 350.3‐06, Eq 9‐5
3‐Calculation the fundamental period of oscillation of the tank for impulsive Ti & convective Tc components:
= 0.59 sec ACI 350.3‐06, Eq 9‐11
= ,∴ =( ∗ = 392.4 KN/m
Page 1 of 2
Seismic Loads for Liquid‐Containing Rectangular RC Tank, According ACI 350.3‐06 , Appendix B Method
Based on 1997 Uniform Building Code Rev1.0
Project :‐ Project Designed by:‐ M. Abu Shady
Building :‐ Building Checked by:‐ M. Abu Shady
Element:‐ Element Date:‐ 11‐Jan‐18
Location:‐ Location M.A.S.
4‐Calculation the total lateral impulsive force Pi & convective force Pc :
= 0.765 ACI 350.3‐06, Appendix B, Eq B‐1,2,3
= 0.120 ACI 350.3‐06, Appendix B, Eq B‐4,5
5‐Calculation the total Base Shaer V:
= 3176.3 KN ACI 350.3‐06, Appendix B & Eq 4‐5
6‐Dynamic force distribution above base per Wall perpendicular to ground motion:
Pi Top = 5.7 KN/m2
Pi Bottom = 39.8 KN/m2
Pc Bottom = 2.0 KN/m2
= 29.4 KN/m2
= 29.4 KN/m2 = 29.4 KN/m2
= 5.7 KN/m2 = 5.2 KN/m2 = 40.3 KN/m2
Page 2 of 2