Vous êtes sur la page 1sur 1

Register Ref: RA 21 Pages: 2 of 3

TASK SPECIFIC HEALTH & SAFETY RISK ASSESSMENTS FOR METHOD STATEMENTS
Revision No: 00 Date:

Operation / Activity: Slinging Loads Last Review by: Date:

Personnel / Property at Risk Erectors, Welders, Platers, Labourers, Riggers Prep by: Date:

Site to be applied App’d by: Date:

Element Hazard Uncontrolled Control Measures Residual Risk


Risk Value Value
Slinging Loads L S R L S R

Dropping materials/ 3 2 6 Work to be phased to ensure no operatives are working 3 1 3


tools/equipment onto directly below erection.
operatives working below Exclusion zones erected and marshalled by CBE
operatives.
Heavy-duty bolt bags used to transport bolts / clamps to
specific locations prior to use.
Tool belts provided for all employees.
All lifting equipment fully certified.
Trained and competent erectors and banksman to be
used.

Struck by crane jib 3 2 6 All operatives to wear high visibility clothing at all times. 3 1 3
Operatives to work inside the handrail.
Operative shall remain vigilant and aware of machinery
operating within their working vicinity

Severity (S): 1-minor 1st aid, 2-Minor hospital referral, 3-RIDDOR (over 3 day), 4-Major injury, 5-fatality
Likelihood (L): 0 - Very Remote, 1 - Remote, 2 - Occasional, 3- Probable, 4 – Frequent
Hazard Rating S x L (0-3 = Low, work can 4-7 = Medium, Work needs additional controls, 8 or more = High, Work shall not commence)
commence,
NG / 0430 /RA

Vous aimerez peut-être aussi