Vous êtes sur la page 1sur 8

Process Audit Preparation "Turtle Diagram" Process Control

Machine tooling Equiment With Who? HR


Tools
Machines , Equipmemnts ,Instruments Machine setup,Job setup, process Control
charts,Product inspection, CPK,Reworks

Customer oriented Process


Inputs Outputs
Production Planning Tools production out put,
validation, Machine , maintenance Process control Variationreduction,On time delivery,Better
CPk,Wastage reduction
productivity , Cutters , Monitoring
Curing Processs.

How? Procedures / Work Instructions preformance / Results


Production plan versus Acheived ,Error
detectabilty , in-process yeild, increase in output
Control Plan,Operator instructions , per employee ,process responsible for delay
Appearence , sample , Work intsructions
Process Audit Preparation "Turtle Diagram" Example: Goods receiving
With What? With Who?

IT Hard- & Software Competent people


Packaging Induction/ training records
Materials handling equipment Purchasing people
Storage space Logistic planning
Transportation
MFG / PRO system

Process
Inputs Outputs

Purchase orders Conform purchased product


Goods receiving
Supplier shipping documents delivered on-time
Receiving schedule MFG / PRO up to date

How? (Support Processes) What Results?

Approved supplier records Logistics processes Analysis of data


Purchasing process Doc & Rec Control Delivery schedule performance
Corr. / prev. action procedures Manufacturing process Premium freight
Stores processes Inventory turns
Document & Record control Purchasing process Obsolete product
Product approval process
Personnel safety
Process Audit Preparation "Turtle Diagram" Example: Contract review
With What? Market inputs With Who?

Market survey Cost Break down analysis,Risk & Sales Manager ,Marketing dept
Contingency managment

Process
Inputs Outputs

Enquiry,Quotations,Offers,Critical Contract Review Review report,Order


stock, accepptance,Contractual agreement

How? What Results?

Contract review procedures (9001:2015) Analysis of data,revenue ,actual versus plan


Delivery schedule performance
Document & Record control Price revisions , Premium freight
approval process Inventory turns
Process Audit Preparation "Turtle Diagram" Example: APQP
With What? Systems With Who?

Cost breakdown analyst,Competent Project


Design / CAD /CAE Software management skills with Product design &
process design knowledge people

Customer oriented Process


Inputs Outputs
Timely Launch,minimum PPM after
Drawings ,Specifications,Programme APQP launch,Approved PPAP files
needed dates, Supplier
manual/Intsructions,Price target,Volume
target , CPK target

How? (Support Processes) What Results?

APQP Procedures , APQP Change / test plan,Time required for engineering


action procedures Manual , Supplier Manual, change ,Production plan schedule,No of engg
SPC/MSA,PPA,CSR Manual, Chaneds after design review, monitoring,Quality,
Document & Record control Cost of Poor quality,
Product approval process MTBR
Personnel safety
Process Audit Preparation "Turtle Diagram" Production Planning
Machine tooling Equiment With Who? HR
Tools, Moulding Machines , Cutters , Curing
Processs Cost breakdown analyst,Competent Project
management skills with Product design &
process design knowledge people

Customer oriented Process


Inputs Outputs
Stageise Inspection, Final Inspections ,
Controlled Outsurced acticities,
Production Planning , CSR Production Planning
Drawings ,Specifications,Programme
needed dates, Intsructions,Volume target ,
CPK target

How? Procedures / Work Instructions preformance / Results


Monitoring,test results, Inspection
reports,Quality,Internal Rejections , Machine break
action procedures down reports ,
Cost of Poor quality,
Document & Record control MTBR,
Product approval process
Personnel safety
Process Audit Preparation "Turtle Diagram" Process Control
Machine tooling Equiment With Who? HR
Tools
Machines , Equipmemnts ,Instruments Machine setup,Job setup, process Control
charts,Product inspection, CPK,Reworks

Customer oriented Process


Inputs Outputs
Production Planning Tools production out put,
validation, Machine , maintenance Process control Variationreduction,On time delivery,Better
CPk,Wastage reduction
productivity , Cutters , Monitoring
Curing Processs.

How? Procedures / Work Instructions preformance / Results


Production plan versus Acheived ,Error
detectabilty , in-process yeild, increase in output
Control Plan,Operator instructions , per employee ,
Appearence , sample , Work intsructions
Process Audit Preparation "Turtle Diagram" Delivery Procedure

Delivery Mode With Who? HR


Mode of transport
Skilled personel with packing knowledge

Customer oriented Process


Inputs Outputs
Delivery Plan,Customer Identification, DC , Batch numberTag,
requirements Delivery Procedure Address, TCs , and other necessary
Documents,transport Logs

How? Procedures / Work Instructions preformance / Results

Packing & Delivery procedure Ontime delivery Monitoring


late delivery details , unpacked details, Stores
details.Errors , transit damage details.
Process Audit Preparation "Turtle Diagram" Conrrol of non conforming product

Delivery Mode With Who? HR


Mode of transport
Skilled personel with packing knowledge

Customer oriented Process


Inputs Outputs
Delivery Plan,Customer Conrrol of non conforming Identification, DC , Batch numberTag,
requirements product Address, TCs , and other necessary
Documents,transport Logs

How? Procedures / Work Instructions preformance / Results

Packing & Delivery procedure Ontime delivery Monitoring


late delivery details , unpacked details, Stores
details.Errors , transit damage details.

Vous aimerez peut-être aussi