1 Fundamentals of Plant engineering and introduction 10
to Piping basics Project types,Project phases,Structure of EPC engineering organization,Pipe sizes,Pipe schedule nos,Pipe manufact- uring methods,classifications and abbreviations. 2 Pipe fittings 4 Classification selection and application of elbows,tees, bends,reducers,O-lets,pipe nipples,couplings,weld caps and plugs. 3 Flanges,Gaskets and bolts 4 Flange types and application,P-T ratings,flange facing types and applications,gasket ,bolt types and selection. 4 Valves 8 Type of valves and functions,P-T ratings,valve trim, valve materials and applicable codes. 5 Piping speciality items 4
Various type of SP items and their applications
6 Codes and standards 4 Relevant codes for piping from ASME,API,BS,AISI,ASTM,IS DIN,MSS-SP etc.. 7 Piping and valve material specifications 4 Material selection,pipe wall thickness calculations, P-T ratings,branch tables and PMS applications. 8 Process mechanical equipments 6 Description of the various static and rotary equipments used in the plant with vendor drawings. 9 Pipe rack 4 Rack width considerations,pipe grouping and arrangements on the rack,future space requirements and pipe spacing. 10 Preparation of plot plan,equipment layout and 20 piping GA drawings Plot plan requirements and development,overall plot plan and unit plot plans,equipment layout guidelines,piping GA layout guidelines,accessability maintainability and material handling considerations on layouts,practical examples of pipe routing for various equipments. 11 Piping Isometrics,BOM and MTO 10 Preparation of isometrics,bill of materials and material take off with practical exercises. 12 Piping supports 8 Type of supports -primary,secondary,rest,anchor,line stop guide,clamp and shoe type supports,trunnion,spring type and special type supports. 13 Piping stress analysis 12 Introduction to stress analysis and objectives,type of loads,failure theories,critical line selection criteria. 14 Mock project 12
Total hours 110
Note: Eligibility: B.E/Diploma in Mechanical,Chemical,Industrial Production Duration: 6 - 8 weeks