Vous êtes sur la page 1sur 8

SUMINISTRO, FABRICACION DE MONTAJE DE TECHOS TR-4

SUMINISTRO Y FABRICACIÓN DE TECHOS

TECHO A DOS AGUAS


ESTRUCTURAS
Descripcion pieza long(mm) Ancho(mm)
VIGUETA VM1 VM1
FE LISO Ø 1/2" 9240 -
L 1" X3/16" 12100
FE LISO Ø 5/8" 5300
VIGUETA VM2 VM2
FE LISO Ø 1/2" 9880 -
L 1" X3/16" 12600
FE LISO Ø 5/8" 5600
TIJERAL T-1 T1
2L 3/16"X1 1/4"X900 (verticales) 1800 -
3L 1/8"X1"X300 (verticales) 900
2L 1/4"X4"X12050 (Crida superior) 24100
2L 1/4"X3 1/2"X12050 (Brida inferior) 24100
PL 1/4" (PARA NODOS)
2L 3/16"X1 1/4"X1340 (DIAGONALES) 2680
L 1" X1/8"X300 300
4 PL 3/8" X500*122 500 122
TEMPLADORES
FE LISO 5/8" (48 UND) 9000
FE LISO 3/8" (144 UND) 2000

COBERTURAS
COBERTURAS TIPO TI esp:0.6 mm 13600 1000
TRASLUCIDO POLICARBONATO esp: 1mm 12000 1000
CANALETA FLUVIAL D: VARIABLE 12600 -
CUMBRERA 12600 -

TECHO A UNA AGUA


ESTRUCTURAS
Descripcion pieza long(mm) Ancho(mm)
ESTRUCTURAS
Tubo 50x100x3mm (5 und) VM3 6000 -
Canal C 100x50x16x3mm (16 und) CR1 16500 -
Angulo 3"x1/4" - 120 -
Fe liso Ø3/8" (centrales) - 1500 -
Fe liso Ø3/8" (extremos) - 1700 -
Fe liso Ø3/8" (diagonal) - 2300 -
PL 150X150X6mm - 150 150

COBERTURAS
COBERTURAS TIPO TI esp:0.6 mm 6.07 1000
TRASLUCIDO POLICARBONATO esp: 1mm 4 1000
CANALETA FLUVIAL D: VARIABLE 16500 -
CUMBRERA 16500 -
Peso(kg/mm o Kg/m2) Peso unitario CANT. PESO TOTAL P.U (USD) TOTAL(USD)
37.685 16 602.96 47.10625 753.7
1 9.24 16 147.84
1.65 19.965 16 319.44
1.6 8.48 16 135.68
39.63 16 634.08 49.5375 792.6
1 9.88 16 158.08
1.65 20.79 16 332.64
1.6 8.96 16 143.36
707.0837277778 5 3535.418639 883.8546597 4419.2732986
2.7 63.18 5 315.9
1.11 12.987 5 64.935
9.83 236.903 5 1184.515
9 216.9 5 1084.5
68.07045 5 340.35225
2.7 86.832 5 434.16
1.11 3.996 5 19.98
74.6527777778 18.2152777778 5 91.07638889
864 1080 1080
1.6 14.4 48 691.2 18 864
0.6 1.2 144 172.8 1.5 216

24 277.44 6658.56
6 374.4 2246.4
- - 1 318.78 318.78
- - 1 221.76 221.76

Peso(kg/mm o Kg/m2) Peso unitario (Kg) CANT. PESO TOTAL P.U (USD) TOTAL(USD)

6.6 39.6 5 198 47.52 237.6


5.22 86.13 4 344.52 103.356 413.424
7.3 0.876 20 17.52 1.095 21.9
0.6 0.9 5 4.5 1.8 9
0.6 1.02 10 10.2 2.04 20.4
0.6 1.38 8 11.04 2.76 22.08
47.22 1.0625 10 10.625 1.328125 13.28125
0
0
0
- - 17 123.828 2105.076
- - 6 124.8 748.8
- - 1 417.45 417.45
- - 1 290.4 290.4
N° TIM - PE - 06

COTIZACIÓN: N°218 - TECHO PARA CENTRO DE ACOPIO Lima, 17 de Agosto de 2016


SEÑORES:
ATENCIÓN
ING. MANUEL ECHEVARRÍA

C.C.:

ASUNTO:SUMINISTRO, FABRICACIÓN DE TECHOS PARA CENTRO DE ACOPIO


Mediante la presente reciba un cordial saludo y a su vez, hacemos llegar nuestra siguiente propuesta técnico-ecónomica:

ITEM DESCRIPCION UNIDAD METRADO P.U.

SUMINISTRO, FABRICACIÓN DE MONTAJE DE TECHOS


1 SUMINISTRO Y FABRICACIÓN DE TECHO A DOS AGUAS
1.1 ESTRUCTURAS
1.1.1 VIGUETA VM1 (16 und)
1.1.1.1 FE LISO Ø 1/2" KG 147.84 3.50
1.1.1.2 L 1" X3/16" KG 319.44 3.50
1.1.1.3 FE LISO Ø 5/8" KG 135.68 3.50
1.1.2 VIGUETA VM2 (16 und)
1.1.2.1 FE LISO Ø 1/2" KG 158.08 3.50
1.1.2.2 L 1" X3/16" KG 332.64 3.50
1.1.2.3 FE LISO Ø 5/8" KG 143.36 3.50
1.1.3 TIJERAL T-1 (5 und)
1.1.3.1 L 3/16"X1 1/4"X900 KG 315.90 3.50
1.1.3.2 L 1/8"X1"X300 KG 64.94 3.50
1.1.3.3 L 1/4"X4"X12050 (Brida superior) KG 1,184.52 3.50
1.1.3.4 L 1/4"X3 1/2"X12050 (Brida inferior) KG 1,084.50 3.50
1.1.3.5 PL 1/4" (PARA NODOS) KG 340.35 3.50
1.1.3.6 L 3/16"X1 1/4"X1340 (DIAGONALES) KG 434.16 3.50
1.1.3.7 L 1" X1/8"X300 KG 19.98 3.50
1.1.3.8 PL 3/8" X500*122 KG 91.08 3.50
1.1.3.9 ACERO A-36 (ADICIONAL 8%) KG 282.83 3.50
1.1.4 TEMPLADORES
1.1.4.1 FE LISO 5/8" (48 UND) KG 691.20 3.50
1.1.4.2 FE LISO 3/8" (144 UND) KG 172.80 3.50
1.1.5 SUMINISTRO DE COBERTURAS
1.1.5.1 COBERTURAS TIPO TI esp:0.6 mm M2 310.00 24.00
1.1.5.2 TRASLUCIDO POLICARBONATO esp: 1mm M2 70.00 33.00
1.1.5.3 CANALETA FLUVIAL D: VARIABLE ML 12.60 28.00
1.1.5.4 CUMBRERA ML 12.60 11.60
1.1.5.5 CENEFA ML 56.00 11.60
1.1.5.6 ACCESORIOS (cinta butil, autoperforantes, autoroscantes) glb 1.00 762.90
2 SUMINISTRO Y FABRICACIÓN DE TECHO A UNA AGUA
2.1 ESTRUCTURAS
2.1.1 Tubo 50x100x3mm (pieza VM3 - 5 und) KG 198.00 3.50
2.1.2 Canal C 100x50x16x3mm ( pieza CR1 - 16 und) KG 344.52 3.50
2.1.3 Angulo 3"x1/4" KG 17.52 3.50
2.1.4 Fe liso Ø3/8" (arriostres centrales) KG 4.50 3.50
2.1.5 Fe liso Ø3/8" (arriostres extremos) KG 10.20 3.50
2.1.6 Fe liso Ø3/8" (arriostres diagonales) KG 11.04 3.50
2.1.7 PL 150X150X6mm KG 10.63 3.50
2.2 SUMINISTRO DE COBERTURAS
2.2.1 COBERTURAS TIPO TI esp:0.6 mm M2 85.00 24.00
2.2.2 TRASLUCIDO POLICARBONATO esp: 1mm M2 18.00 33.00
2.2.3 CANALETA FLUVIAL D: VARIABLE ML 16.50 28.00
2.2.4 CENEFA ML 18.00 11.60
2.2.5 Accesorios (cinta butil, autoperforantes, autoroscantes) glb 1.00 231.34

COSTO DIRECTO
GG
UTILIDADES
PRESUPUESTO TOTAL

CONDICIONES
Los precios están dados en dólares americanos
Los precios NO Incluyen el 18% de IGV.
Validez de oferta: 7 días calendarios
Forma de pago: A coordinar
El presupuesto esta basado según información recibida, cualquier servicio no escrito será considerado como adicional
Tiempo de entrega: 20 dias calendarios.
Entrega de materiales en almacen de TECIN.
Alcances de TECIN SAC
SGI SSOMA TECIN SAC.
TECIN suministrará sólo lo indicado en la presente cotización MANO DE OBRA CALIFICADO Y SUMINISTRO
El personal para las partidas consideradas y Coordinador administrativo.
La presente cotización se elaboró de acuerdo a los planos enviados por el cliente.
Informe de ensayo por tintes penetrantes y dossier de calidad para fabricación.
Alcances por parte del Cliente
Aprobación de la presente cotización para su realización.
Orden de trabajo
Movilización de estructuras
Envío de planos de fabricación y detalles
PE - 06

17 de Agosto de 2016

técnico-ecónomica:

PARCIAL SUB TOTAL

2,110.36
517.44
1,118.04
474.88
2,219.28
553.28
1,164.24
501.76
13,363.88
1,105.65
227.27
4,145.80
3,795.75
1,191.23
1,519.56
69.93
318.77
989.92
3,024.00
2,419.20
604.80
11,661.46
7,440.00
2,310.00
352.80
146.16
649.60
762.90

2,087.42
693.00
1,205.82
61.32
15.75
35.70
38.64
37.19
3,536.14
2,040.00
594.00
462.00
208.80
231.34

38,002.54
10% 3,800.25
8% 3,040.20
44,842.99

Vous aimerez peut-être aussi