TENDON STRESSING REPORT

Project REEF TOWERS 4 & 5,


Structure: Tower-4 Floor #:
Name : CRESCENT BAY, KARACHI

Calculated Target
Strand Elastic Jack Adjusted Pressure (Bars)
Start Finish Strand Force to be Jack Gauge Pressure (Bars)
Date Diameter Modulus Piston Area
Time Time Grade applied (KN) Type / No. No.
(mm) (Kg/Cm2) 2
(Cm ) 15% 100% 15% 100%

51.05 EJ-47 SF-47 357


270 15.24 182.6
51.05 EJ-48 SF-48 357

End-1 Extention (mm) End-2 Extention (mm) Gross Wedge Draw-In (mm) Jack Length Net Net Avg
Tendon Theoretical Strand Total %
Elongation Draw-In Elongation Elongation
No. Ext No. Extension Total Variation
Measur-1 Factor Total-1 Measur-2 Factor Total-2 Measur-1 Measur-2
Draw-In
x 2 (mm) (mm) (mm) (mm)
Total 1+2
1
2
3
4
1
2
3
4
1
2
3
4
1
2
3
4
1
2
3
4

Description Recorded by (StrongForce) Checked by (ACL) Approval by Resident Engineer

Name & Signture:

Date: Approved :

Vous aimerez peut-être aussi