Detailed Estimate

2017/45839 : കാലിെ‫ڹ‬ാഴു‫്ڹ‬ നിർ疂�ാണം

1 ­ Earth work
1 80.2  ­­  Earthwork  in  excavation  by  manual  means  over  areas  (exceeding  30cm  in
depth, 1.5m in width as well as 10 m2 on plan) including disposal of excavated earth
lead upto 50m and lift upto 1.5m disposed earth to be levelled and neatly dressed For
foundation 
All kinds of soil
Sl No Description No L B D CF Quantity Remark
­
1 short wall 1 2.800 0.400 0.400 1.0 0.4480 ­
2 C/C length 1 14.900 0.400 0.400 1.0 2.3850 ­
Total Quantity 2.8330 cum
Total Deducted Quantity 0.0000 cum
Net Total Quantity 2.83 cum
Say 2.8330 cum @ Rs 0.0 / cum 0.00

2 80.3  ­­  Earthwork  in  excavation  by  manual  means  over  areas  (exceeding  30cm  in
depth, 1.5m in width as well as 10 m2 on plan) including disposal of excavated earth
lead upto 50m and lift upto 1.5m disposed earth to be levelled and neatly dressed for
Open areas 
All kinds of soil
Sl No Description No L B D CF Quantity Remark
­
1 Pit 1 2.700 1.500 1.000 1.0 4.0510 ­
Total Quantity 4.0510 cum
Total Deducted Quantity 0.0000 cum
Net Total Quantity 4.05 cum
Say 4.0510 cum @ Rs 0.0 / cum 0.00

2 ­ DR masonry
1 80.31 ­­ Dry stone masonary for retaing walls and foundation
Sl No Description No L B D CF Quantity Remark
­
1 Pit 1 6.600 0.45000 1.000 1.0 2.9700 ­
short  wall  Foundation  and
2 1 2.800 0.400 0.700 1.0 0.7840 ­
basement
C/C  length  Foundation  and
3 1 14.900 0.400 0.700 1.0 4.1730 ­
basement
Total Quantity 7.9270 cum
Total Deducted Quantity 0.0000 cum
Net Total Quantity 7.93 cum
Say 7.9270 cum @ Rs 0.0 / cum 0.00

3 ­ Solid block
1 50.6.2.2  ­­  Solid  masonry  using  pre  cast  solid  blocks  (factory  made)  of  size
30x20x15cm  or  nearest  available  size  confirming  to  IS  2185  part  I  of  1979  for  super
structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse
sand) etc complete
Sl No Description No L B D CF Quantity Remark
­
1 urinal tank 1 3.600 0.100 0.600 1.0 0.2170 ­
2 ramp 1 1.200 1.200 0.200 1.0 0.2880 ­
3 ­ 1 2.750 0.150 0.450 1.0 0.1860 ­
4 Trough Side wall 1 2.750 0.150 0.600 1.0 0.2480 ­
5 Pillar 2 0.300 0.300 2.100 1.0 0.3780 ­
6 Super structure Pillar 2 0.300 0.300 2.700 1.0 0.4860 ­
Total Quantity 1.8030 cum
Total Deducted Quantity 0.0000 cum
Net Total Quantity 1.80 cum
Say 1.8030 cum @ Rs 0.0 / cum 0.00

4 ­ Cement concrete
1 4.1.5 ­­ Providing and laying in position cement concrete of specified grade excluding
the cost of centering and shuttering ­ All work up to plinth level:
1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Sl No Description No L B D CF Quantity Remark
­
1 urinal tank 1 0.800 0.800 0.050 1.0 0.0330 ­
2 ramp 1 1.200 1.200 0.075 1.0 0.1080 ­
3 Flooring 1 4.400 3.500 0.075 1.0 1.1550 ­
Total Quantity 1.2960 cum
Total Deducted Quantity 0.0000 cum
Net Total Quantity 1.30 cum
Say 1.2960 cum @ Rs 0.0 / cum 0.00

5 ­ Plastering
1 13.4.1 ­­ 12 mm cement plaster of mix:
1:4 ( 1 cement : 4 coarse sand)
Sl No Description No L B D CF Quantity Remark
­
1 floor 1 0.800 0.800 1.0 0.6410 ­
2 out side 1 4.000 0.800 1.0 3.2000 ­
3 urinal tank inside 1 3.200 0.800 1.0 2.5610 ­
4 Flooring 1 3.050 3.350 1.0 10.2180 ­
5 Wall top 1 7.450 0.150 1.0 1.1180 ­
6 Topof pillar 4 0.300 0.300 1.0 0.3600 ­
7 ­ 2 1.200 1.700 1.0 4.0800 ­
8 ­ 2 0.600 2.100 1.0 2.5200 ­
9 Pillar 2 1.200 1.100 1.0 2.6400 ­
10 ­ 2 0.900 2.700 1.0 4.8600 ­
11 ­ 1 2.350 1.000 1.0 2.3500 ­
12 Side wall 1 4.100 1.000 1.0 4.1000 ­
13 Back side 1 3.350 1.000 1.0 3.3500 ­
14 Inside 1 8.750 1.000 1.0 8.7500 ­
15 Inside trough 1 2.750 2.400 1.0 6.6000 ­
16 Front 1 3.350 0.600 1.0 2.0100 ­
Total Quantity 59.3580 sqm
Total Deducted Quantity 0.0000 sqm
Net Total Quantity 59.36 sqm
Say 59.3580 sqm @ Rs 0.0 / sqm 0.00

6 ­ Roof
1 OD2736/2017_2018  ­­  Providing  and  fixing  0.35  mm  or  nearest  size  thick  powder
coated GI trafford sheet of good quality up to any pitch including fixing J or L bolts and
nuts etc. complete .excluding planks rafters etc.
Sl No Description No L B D CF Quantity Remark
­
1 Roof sheet 1 4.250 4.550 1.0 19.3380 ­
Total Quantity 19.3380 sqm
Total Deducted Quantity 0.0000 sqm
Net Total Quantity 19.34 sqm
Say 19.3380 sqm @ Rs 0.0 / sqm 0.00

2 50.10.2 ­­ Steel work for purlin/single section with G I pipes including cutting, hoisting,
fixing  in  position  and  applying  a  priming  coat  of  approved  steel  primer,  including
welding and bolted with special shaped washers etc. complete
Sl No Description No L B D CF Quantity Remark
­
1 20mm @1.59/m 8 4.200 1.590 1.0 53.4250 ­
2 32mm@3.17kg/m 4 4.500 3.170 1.0 57.0600 ­
Total Quantity 110.4850 kg
Total Deducted Quantity 0.0000 kg
Net Total Quantity 110.49 kg
Say 110.4850 kg @ Rs 0.0 / kg 0.00

Total Rs :
Rounded Total Rs : .00
( Rupees Only)
Unskilled Manpower wages 0.00
Materials 0.00
Skilled 1778.68
SemiSkilled 20340.66
No of Person days 0.00
No of Person days(Say) 0
 

SECURE ­ Fri Jul 21 2017 22:40:20 GMT+0530 (India Standard Time)