Vous êtes sur la page 1sur 1

80.

1 Earthwork and surface dressing the side slopes of the water bodies by
removing grass, shrubs etc.with neatly levelling and finishing the surface
with available clayey soil.

Code Description Unit Quantity Rate Amount


Details of cost for 100sqm
0115 Coolie Day 0.6 240.0 144.0
0114 Beldar Day 1.08 240.0 259.2
TOTAL 403.2
Cost of 100.0 sqm 403.2
Cost of 1 sqm 4.03
Say 4.03
Labour 4.03

Vous aimerez peut-être aussi