DETAILED DESIGN WORKS OF ABUTMENTS FOR LAMBINGAN BRIDGE

LAMBINGAN BRIDGE ABUTMENT DESIGN

A. Updates on Calculation Sheets based on available codes :

Refence Codes :
1.) DPWH - DGCS Volume 5 2015
2.) DPWH - LRFD BSDS 1st Editon 2013

Other Reference Codes :


1.) AASHTO LRFD 2012 6th Edition (or later version)
2.) JRA Specifications for Highways and Bridges (2002 available copy)

Since the site specific coefficient is under review, General Procedure from BSDS was used.

1.) Bridge Operational Classification Essential Bridge


2.) Regularity of Bridge Regular
3.) Design Level of Earthquake Ground Motion Level 2
4.) Ground Type Classification Type 2
Based on available soil parameters
5.) Identification of specific values of acceleration coefficients on maps :
Acceleration for PGA 0.60
Acceleration for Ss 1.30
Acceleration for S1 0.50
6.) Design Response Spectrum
7.) Confirmation of Seismic Performance Zone Seismic Zone 4
Note that liquefaction is present
8.) Analysis Requirement
Note for single-span bridges, refer seismic analysis and design for abutments
to DGCS/AASHTO LRFD

Work Items Status Remarks

1.0 Design Consideration


Revise as necessary, BSDS
1.1. Liquefaction OK
Waiting for soil investigation result
1.2. Geometric Data Initial input
2.0 Design of Abutment
2.1. Load Calculation
2.1.1. Loads from Superstructure Update Waiting for final design of superstructure
2.1.2. Abutment Weight OK
2.1.3. Soil Weight above Heel OK
2.1.4. Buoyant Weight OK
2.1.5. Earth Pressure Loads
2.1.5.1. Static Earth Pressure OK Coulomb Theory
2.1.5.2. Surcharge OK DGCS
2.1.5.3. Seisimic Active Earth Pressure OK M-O Method, DGCS/AASHTO LRFD
Applicable Load Combinations :
2.1.6. Design Loads (about center of pile group OK
Strength I, Extreme Event I, Service I
2.2. Pile Foundation
2.2.1. Model OK Midas Model
2.2.2. Hor. Subgrade Reaction (Discrete Model OK Using available soil parameters, BSDS
2.2.3. Lumped Springs (Lumped Model) OK Using available soil parameters, BSDS
2.2.4. Pile Stiffness OK Revise as necessary, BSDS
2.2.5. Foundation Design Force OK From Item 2.1.6.

Work Items Status Remarks

2.2.6. Determination of Displacements OK Revise as necessary, BSDS


2.2.7. Determination of Reactions OK Revise as necessary, BSDS
2.2.8. Graphing of Reaction/Displacement OK Rigid Pile Head/Hinged Pile Head Connection
2.2.9. Verification of Stability For single Pile action, BSDS
2.2.9.1. Lateral Displacement OK
2.2.9.2. Maximum Axial Resistance OK
2.2.9.3. Maximium Axial Pull-out Resistance OK
2.2.10. Maxmimum Moment for Pile Design OK For single Pile action, BSDS
2.2.11. Calculation of Pile Flexural Resistance
2.2.11.1. P-M Interaction Diagram of Pile OK Output from Midas Model
2.2.12. Reinforcement Design OK Revise as necessary, DGCS/AASHTO LRFD
2.3. Approach Slab Design OK Revise as necessary, DGCS/AASHTO LRFD
2.4. Corbel Design OK Revise as necessary, DGCS/AASHTO LRFD
2.5. Backwall Design OK Revise as necessary, DGCS/AASHTO LRFD
2.6. Stem Design OK Revise as necessary, DGCS/AASHTO LRFD

B. On progress Calculations

Work Items Status Remarks

1.0. Design of Pile Cap to be done initial calculation, need to update for recent code
2.0 Design of Wingwall to be done initial calculation, need to update for recent code
3.0 Design of Approach Railing to be done initial calculation, need to update for recent code
4.0 Revetment to be done
ssential Bridge

eismic Zone 4

rks

uperstructure
rks

Head Connection

S/AASHTO LRFD
S/AASHTO LRFD
S/AASHTO LRFD
S/AASHTO LRFD
S/AASHTO LRFD