PROJECT TITLE
IN
HYDROCRACKER UNIT
2. OBJECTIVE
Learning the basics of PLC as well as the parts and device used to
set up functional control system, such as Microprocessor , Power
supply, I/O cards, isolators and its configuration
SL. TIME
NO. TASK (ACTIVITY) SCHEDULE
IN DAYS
DAYS
12
10
6
days
0
Activity 1 Activity 2 Activity 3 Activity 4 Activity 5 Activity 6 Activity 7
During the project work a detailed study will be carried out by visiting
the Oil Refinery control room, by interacting with Instrumentation Engineer
of the Hydrocracker Unit. Planning for the study of PLC has been done to
understand operations and maintenance issues. Learning PLC connection
on the Marshalling rack room and using isolator/barrier and other
equipments to connect field I/O to device. Multimeter, loop calibrator, screw
drivers were used during PLC maintenance.
2. Slow Response
3. Cards Malfunctioning