Rencana Reklamasi TPS Indonesia Power Tanjung Perak Terminal Teluk Lamong

Advantages: Advantages: Advantages:


- Near market and consumers - Near market and consumers - Area at Port of Teluk Lamong
- No need subsea pipeline - No need subsea pipeline already has IUPTL (Permit of
Power Supply Business)
Disadvantages: Disadvantages: Disadvantages:
- No certainty when the - No certainty when Indonesia - Additional investation for
reclamation process will be Power will relocate the Perak subsea cable around 2 km
conducted Power Plant. Fastest
- New Port Master Plan must possibility is at then of year
be submitted to and 2018
approved by Ministry of - Area at Tanjung Perak
Transportation doesn’t has IUPTL (Permit of
- Area at Tanjung Perak Power Supply Business) yet
doesn’t has IUPTL (Permit of
Power Supply Business) yet

Reclamation of TPS

Land reclamation, usually known as reclamation, and also known as land fill (not to be confused with a
landfill), is the process of creating new land from ocean, riverbeds, or lake beds. The land reclaimed is
known as reclamation ground or land fill.

Land reclamation can be achieved with a number of different methods. The simplest method involves
simply filling the area with large amounts of heavy rock and/or cement, then filling with clay and dirt until
the desired height is reached. The process is called "infilling" and the material used to fill the space is
generally called "infill". Draining of submerged wetlands is often used to reclaim land for agricultural use.
Deep cement mixing is used typically in situations in which the material displaced by either dredging or