Vous êtes sur la page 1sur 6

WATER INFRASTRUCTURE

INDONESIA
Strategies to Deliver Clean Water; Understanding Conference Date: 27 – 28 March 2012
the Technical Requirements; Developing Venue: Crowne Plaza, Jakarta,
Partnerships and Managing Water Stakeholders Indonesia
Projects www.waterinfrastructureindonesia.com

Attend Water Infrastructure Indonesia to: Key Note Speakers:


 Understand the latest regulations for water Ir. Mohamad Rachmat Karnadi, MT
infrastructure development Chairman of Supporting Agency
 Evaluate different financing schemes for Water Supply System
available for water infrastructure projects Development (BPPSPAM)
 Analyse the latest plan for water infrastructure MINISTRY OF PUBLIC WORKS,
development in different regions in Indonesia REPUBLIC OF INDONESIA
 Enhance project outcomes through effective
Dr. Ir. Dedy Supriadi Priatna, MSc
management of stakeholders
Deputy Minister for Infrastructure
 Network with the key decision makers from Affairs
government and water industry stakeholders MINISTRY OF NATIONAL PLANNING
(BAPPENAS), REPUBLIC OF
INDONESIA
FACTS & FIGURES:
Hiramsyah Sambudhy Thaib
 US$150 BILLION of infrastructure projects to be Chief Executive Officer
rolled out before 2015 PT. BAKRIELAND DEVELOPMENT TBK
 Water projects are a major priority
 78 million people will require improved water
Bernardus Djonoputro
supply and 73 million need improved Managing Director
sanitation services by 2015 PT. NUSANTARA INFRASTRUCTURE
 Water demands to double to 356,575 million
m3/annum by 2015 Emma Sri Martini*
 80% of 250 million Indonesians does not have President Director
access to piped water PT. SARANA MULTI INFRASTRUKTUR
 Only 42.8% of houses in Indonesia has
domestic waste treatment
 Massive opportunity for water stakeholders in
Indonesia STAKEHOLDERS PARTICIPATING:
Supported by:
INDONESIAN NATIONAL GOVERNMENT
| PROVINCIAL GOVERNMENT | PDAM
(PUBLIC WATER COMPANIES) | PRIVATE
WATER COMPANIES | INFRASTRUCTURE
INVESTORS | ENGINEERING &
CONSTRUCTION COMPANIES | SYSTEM
INTEGRATORS

Organised by:

BOOK NOW!
T: +65 6722 9388 F: +65 6720 3804 E: enquiry.iqpc.com.sg
W: www.waterinfrastructureindonesia.com
WATER INFRASTRUCTURE INDONESIA Conference Date: 27 – 28 March 2012
Strategies to Deliver Clean Water; Understanding the Venue: Crowne Plaza, Jakarta,
www.waterinfrastructureindonesia.com
Technical Requirements; Developing Partnerships
and Managing Water Stakeholders

Dear Water Professionals, Expert Panel of Speakers:


With aggressive target to achieve 68.87% national clean  Ir. Mohamad Rachmat Karnadi, MT, Chairman of
water coverage by 2015, water projects are now a priority BPPSPAM (Supporting Agency for Water Supply
throughout Indonesia. These projects face many challenges System Development), MINISTRY OF PUBLIC WORKS,
that call for solutions from the solution providers in the water REPUBLIC OF INDONESIA
industry.
 Dr. Ir. Dedy Supriadi Priatna, MSc, Deputy Minister for
Water Infrastructure Indonesia will give you the opportunity Infrastructure Affairs, MINISTRY OF NATIONAL
to meet all stakeholders in water infrastructure PLANNING (BAPPENAS), REPUBLIC OF INDONESIA
development. Featuring presentations from all project
stakeholders, this conference will address issues on  Dr. Ir. Yuswanda A. Tumenggung, Deputy for Land
impacting regulations, financing, project plans as well as Administration & Arrangement, NATIONAL LAND
project implementation and engineering best practices. AFFAIRS BODY, REPUBLIC OF INDONESIA
Hear firsthand about what these key decision makers have  Emma Sri Martini, President Director, PT. SARANA MULTI
to say and learn how to win the water business in Indonesia. INFRASTRUKTUR*
Secure your seat by registering online at  Nonito R. Bernardo, Senior Investment Officer,
www.waterinfrastructureindonesia.com or by calling +65 INTERNATIONAL FINANCE CORPORATION*
6722 9388 or email enquiry@iqpc.com.sg
 Thomas Pang, CEO, K-GREEN TRUST
I look forward to welcoming you in March 2012.
 Ir. Benny Andrianto, Vice President Director, PT.
Yours sincerely, ADHYA TIRTA BATAM
 Azutaro Pleveni Gustimigo, President Director, PDAM
WAY RILAU BANDAR LAMPUNG CITY
 Ir. H. Agus Sutyoso, M.Si, President Director, PDAM
PONTIANAK MUNICIPAL
Sofia Chandra  Dewa Putu Punia Asa, Head of Public Works,
Conference Producer PROVINCIAL GOVERNMENT OF BALI
IQPC Worldwide
 Didi A. Djamhir, Head of Local Development Planning
PS. BOOK EARLY and take advantage of the $2,099 early Agency, GOVERNMENT OF CIMAHI MUNICIPAL
bird discount! Secure your place before 15th Jan, 2012 to
benefit.  Ir. Dwi Swahyudi, MT, Head of Infrastructure Div. &
Dev. Area, GOVERNMENT OF MALANG REGENCY
Who you will meet at Water Infrastructure  Rudie Kusmayadi, President Director, PDAM TIRTA
Indonesia? RAHARDJA BANDUNG REGENCY

 Indonesian National & Provincial Government  Ir. H. Azhar Latif, President Director, PDAM PADANG
 Public (PDAM) and private water companies in Indonesia MUNICIPAL
 Infrastructure investors  Ir. Gentur Prihantono, SP, MT, Head of Public Works,
 Engineering & Construction Companies (EPCs) GOVERNMENT OF EAST JAVA PROVINCE
 Water & wastewater technology system providers
 Water works and technologies equipment and services  Bernardus Djonoputro, Managing Director, PT.
suppliers NUSANTARA INFRASTRUCTURE
 Hiramsyah Sambudhy Thaib, Chief Executive Officer,
PT. BAKRIELAND DEVELOPMENT TBK
SPONSORSHIP OPPORTUNITIES  Patrick Thienpont, President Director, PT. DEGREMONT
Water Infrastructure Indonesia will give you preferential
INDONESIA*
access to decision makers and implementers for major  Herawati Prasetyo, Vice President Director, PT. PAM
water projects in Indonesia
LYONNAISE JAYA (PALYJA)*
 Meet, educate and influence decision makers on the
value of your products/services
 Tay Lim Heng, Chief Executive Officer, KEPPEL
 Establish strong relationships INTEGRATED ENGINEERING
 Demonstrate your expertise and product excellence
 Nakka Sharath, Director & Country Head, PT.
with onsite product displays
DOSHION VEOLIA WATER SOLUTIONS INDONESIA
For specific details of sponsorship and exhibition packages,
please email sponsorship@iqpc.com.sg or call +6567229388
*awaiting final confirmation

BOOK NOW!
T: +65 6722 9388 F: +65 6720 3804 E: enquiry.iqpc.com.sg
W: www.waterinfrastructureindonesia.com
WATER INFRASTRUCTURE INDONESIA
Strategies to Deliver Clean Water; Understanding the Conference Date: 27 – 28 March 2012
Venue: Crowne Plaza, Jakarta,
Technical Requirements; Developing Partnerships www.waterinfrastructureindonesia.com
and Managing Water Stakeholders

CONFERENCE AGENDA
DAY 1  Assessing the pros and cons of different contract
models that are currently in use
Tuesday 27 March 2012  Case study: detailing PT. SMI’s water infrastructure
projects’ requirements
8:30 Registration and Refreshments Emma Sri Martini, President Director, PT. SARANA MULTI
INFRASTRUKTUR*
8:50 Opening Address and Welcome from the Chairman
11:30 Perspectives from a Long-Term Infrastructure Investor in
9:00 Water Infrastructure Projects: Development Models and Water Infrastructure Projects
Investment Opportunities  Evaluating long-term investment for water infrastructure
 Overview of existing water supply in Indonesia and projects
projecting the needs based on the set target  Discussing K-Green Trust’s evaluation criteria in
 Evaluating Indonesia’s strategies in achieving the water choosing potential investment projects
supply coverage target OF 68.87%  Meeting the expectations: What are the guidelines to
 Understanding the role of private companies in financing increase your investment potentials?
water development projects through PPP financing Thomas Pang, Chief Executive Officer, K-GREEN TRUST
scheme
 Looking at investment opportunities for the upcoming 12:00 IFC’s Perspective: Devising Effective Strategies to Prioritise
water supply developments in Indonesia Infrastructure Project Investments
Ir. Mohamad Rachmat Karnadi, MT, Chairman of BPPSPAM  Evaluating the current PPP model for water
(Supporting Agency for Water Supply System infrastructure project financing in Indonesia
Development), MINISTRY OF PUBLIC WORKS, REPUBLIC OF  Reviewing IFC’s evaluation criteria in selecting which
INDONESIA water infrastructure projects to invest in
 Meeting the expectations: What are the guidelines to
9:30 Financing Water Projects through Collaboration with increase your investment potential?
Private Establishments: Structure of PPP in Indonesia  Assessing the latest trends for PPP model in Asia region
 Understanding what PPP is and how it helps with funding Nonito R. Bernardo, Senior Investment Officer,
water infrastructure projects in Indonesia INTERNATIONAL FINANCE CORPORATION*
 Recognising Bappenas roles in PPP-financed projects in
Indonesia 12:30 Lunch and Networking
 Discussing the organisations role in order to facilitate
infrastructure financing in Indonesia 13:30 ROUND TABLE DISCUSSION 1: The Key Aspects in Water
 Preparing for the necessary procedures for investing in Project Financing
water infrastructure in Indonesia  How to enhance project investment potential
Dr. Ir. Dedy Supriadi Priatna, MSc, Deputy Minister for  Establishing sound PPP contract model
Infrastructure Affairs, MINISTRY OF NATIONAL PLANNING  Achieving and managing long-term investment and
(BAPPENAS), REPUBLIC OF INDONESIA ownership of water infrastructure
 Devising effective management of stakeholders in
10:00 Devising Land Acquisition Strategies for Water Infrastructure water infrastructure projects
Developments in Indonesia
 Understanding the latest regulations for land acquisition 14:00 CASE STUDY: Developing Water Infrastructure for Bandar
in Indonesia Lampung Municipal Water Supply
 Detailing the key challenges in land acquisition for water  Providing an overview of the current situation and
infrastructure projects in Indonesia calculating the clean water need by 2015
 Specifying effective strategies and key decision making  Devising effective strategies to meet the growth of
processes to expedite the land acquisition process clean water demandS
 Detailing the future plans of BPN (Indonesia National  Ensuring clean water supply for the population through
Land Agency) in land acquisition for water infrastructure water infrastructure development in the eastern part of
projects in Indonesia Bandar Lampung municipal: Outlining the plan
Dr. Ir. Yuswanda A. Tumenggung, Deputy for Land  Specifying the key decision making processes in the
Administration & Arrangement, NATIONAL LAND AFFAIRS different stages of the project
BODY, REPUBLIC OF INDONESIA Azutaro Pleveni Gustimigo, President Director, PDAM
WAY RILAU BANDAR LAMPUNG CITY
10:30 Morning Tea and Networking
14:30 CASE STUDY: Detailing the Ongoing and Upcoming Water
11:00 PT. Sarana Multi Infrastruktur (PT. SMI)’s Perspective: Infrastructure Projects in Bali
Financing Water Infrastructure Projects in Indonesia  Reviewing the current need for clean water and
 Outlining the different financing schemes available for sanitation in Bali province
infrastructure projects in Indonesia  Forecasting future demands for the region: What are
 Highlighting the importance of partnership among the strategies planned in order to achieve these goals?
stakeholders: What has been done?

BOOK NOW!
T: +65 6722 9388 F: +65 6720 3804 E: enquiry.iqpc.com.sg
W: www.waterinfrastructureindonesia.com
WATER INFRASTRUCTURE INDONESIA
Strategies to Deliver Clean Water; Understanding the Conference Date: 27 – 28 March 2012
Venue: Crowne Plaza, Jakarta,
Technical Requirements; Developing Partnerships www.waterinfrastructureindonesia.com
and Managing Water Stakeholders

CONFERENCE AGENDA
16:30 CASE STUDY: Devising Effective Strategies to Meet the
 Evaluating ongoing water infrastructure projects in the Rapidly Increasing Population in Batam: PT. Adhya Tirta
region and discussing the requirements in different stage Batam Viewpoint
of the project  Understanding the current water situation in Batam
 Assessing the master-plan for upcoming water Island and the key challenges faced by PT. Adhya
infrastructure projects in Bali province Tirta Batam
Dewa Putu Punia Asa, Head of Public Works, PROVINCIAL  Evaluating the current water demand and projecting
GOVERNMENT OF BALI the demand with the growing population
 Optimising the use of water supply in Batam Island
15:00 Afternoon Tea and Networking through usage of the right technologies and
Implementation of the right strategies
15:30 CASE STUDY: Eastern Pontianak Municipal Water Supply  Establishing forward plans: What are the plans for
Project water supply in Batam Island?
 Highlighting the clean water needs in the Pontianak Ir. Benny Andrianto, Vice President Director, PT. ADHYA
municipal TIRTA BATAM
 Leaning from PDAM Pontianak Municipal on the
effective strategies for meeting clean water demands in 17:00 End of Conference Day 1
the region
 Detailing the challenges and requirements in the
different stages of the project
 Evaluating the solutions required to achieve the set
DAY 2
targets Wednesday 28 March 2012
Ir. H. Agus Sutyoso, M.Si, President Director, PDAM
PONTIANAK MUNICIPAL 8:30 Registration and Refreshments

16:00 Assessing PT. PAM Lyonnaise Jaya (Palyja)’s Requirements 8:50 Opening Address and Welcome from the Chairman
for Solution Providers
 Outlining the current outlook for Palyja’s water 9:00 Detailing the Water Infrastructure Needs in Malang
infrastructure projects Regency: Optimising Krabayakan Spring Water for Water
 Detailing the key challenges in meeting the increasing Supply in East Java Province
water demand in Indonesia  Highlighting the potential of Krabayakan Spring Water
 Evaluating PT. PAM Lyonnaise Jaya (Palyja)’s forward for water infrastructure development projects
plans and strategies to improve water infrastructure in  Specifying the time-frame, scope, and value of the
Indonesia project
 Specifying the infrastructure and technologies needed  Evaluating the requirements and technology needed
to enhance clean water coverage in Indonesia for the project
Herawati Prasetyo, Vice President Director, PT. PAM  Outlining future water infrastructure development plans
LYONNAISE JAYA (PALYJA)* in the region
Ir. Dwi Swahyudi, MT, Head of Infrastructure Div. & Dev.
Area, GOVERNMENT OF MALANG REGENCY

9:30 Case Study: PDAM Tirta Rahardja’s Perspective:


Developing Water Infrastructure for Bandung Regency
Water Supply and Sanitation
 Assessing the current situation and estimating the clean
water and sanitation need for 2015
 Outlining strategies to meet the increasing demand of
clean water and sanitation
 Evaluating the master-plan for water infrastructure
development in Bandung Regency
 Detailing the requirements and solutions needed for
water infrastructure projects in the Bandung Regency
Rudie Kusmayadi, President Director, PDAM TIRTA
RAHARDJA BANDUNG REGENCY

10:00 Case Study: Cimahi Waste Water Management Project in


West Java Province
 Outlining the current water s ituation in the Cimahi
Municipal
 Highlighting the potential of Cimahi Waste Water
Treatment Project

BOOK NOW!
T: +65 6722 9388 F: +65 6720 3804 E: enquiry.iqpc.com.sg
W: www.waterinfrastructureindonesia.com
WATER INFRASTRUCTURE INDONESIA
Strategies to Deliver Clean Water; Understanding the Conference Date: 27 – 28 March 2012
Venue: Crowne Plaza, Jakarta, Indonesia
Technical Requirements; Developing Partnerships www.waterinfrastructureindonesia.com
and Managing Water Stakeholders

CONFERENCE AGENDA
 Evaluating the requirements and scope of work for  Discussing the future outlook of water infrastructure in
Cimahi Waste Water Treatment Project Indonesia
 Implementing Cimahi Waste Water Treatment Project:
What needs to be considered in the procurement stage 14:00 How to Capitalise on Indonesia’s Water Infrastructure
of the project? Boom
Didi A. Djamhir, Head of Local Development Planning  Understanding the gap between clean water supply
Agency, GOVERNMENT OF CIMAHI MUNICIPAL and demand in the different regions in Indonesia
 Selecting the right partnerships: 5W + 1H
10:30 Morning Tea and Networking  Improving profit margins through technology usage
and facility (s) upgrades
11:00 CASE STUDY: Detailing Expansion of Padang Municipal  Competing with other industry players: What are the
Water Supply, West Sumatra best strategies?
 Overview of the Padang Municipal Water Supply Project Bernardus Djonoputro, Managing Director, PT.
and how it helps to meet clean water demand around NUSANTARA INFRASTRUCTURE
the area
 Establishing feasibility study on the transmission and 14:30 Outlining Doshion Veolia Water Solutions (DVWS)’s Water
distribution system for the project Infrastructure Engineering Expertise in Indonesia
 Discussing the plans and details of Padang Municipal  Detailing the time frame and scope of water
Water Supply Project: What’s the timeframe and the infrastructure projects handled by DVWS
work involved?  Engineering best practice for water infrastructure
 Looking into the comprehensive engineering, financial, projects in Indonesia: What can be learnt from DVWS?
economic and environmental assessment of the project  Assessing the technical requirements of the water
Ir. H. Azhar Latif, President Director, PDAM PADANG infrastructure projects handled by DVWS
MUNICIPAL  System automation for water infrastructure in Indonesia:
What does DVWS have to say about this?
11:30 CASE STUDY: Meeting the East Java Population Water Nakka Sharath, Director and Country Head, Doshion
Supply Demand: Learning from the Government of East Veolia Water Solutions
Java Province
 Evaluating the current outlook and future clean water 15:00 Afternoon Tea and Networking
need in the East Java province
 Establishing effective strategies to meet the growth in 15:30 Degremont Indonesia’s Perspective: Coordinating
clean water demand: What can be learnt? Successful Water Infrastructure Projects in Indonesia
 Outlining the water infrastructure development plans for  Case studies of water infrastructure projects by
the region Degremont Indonesia
 The progress of Umbulan project thus far: What are the  Detailing project requirements for water infrastructure
requirements and processes involved? projects in Indonesia
Ir. Gentur Prihantono, SP, MT, Head of Public Works,  Specifying the technologies selection criteria in
GOVERNMENT OF EAST JAVA PROVINCE completing water infrastructure projects in Indonesia
 Outlining the future plans for Degremont Indonesia
12:30 PT. Bakrieland Development Tbk’s Strategies for Successful Patrick Thienpont, President Director, PT. DEGREMONT
Water Infrastructure Development INDONESIA*
 Understanding the key requirements for different parties
to take part in water infrastructure developments 16:00 Keppel Integrated Engineering (KIE)’s Perspective:
 Managing water infrastructure projects in Indonesia: Creating New Source of Water as Sustainable Solution
What are the key elements to consider?  Highlighting the key challenges faced by Keppel
 Establishing strategies to succeed in collaboration with Integrated Engineering in water infrastructure projects
other stakeholders and devising effective strategies to overcome them
Hiramsyah Sambudhy Thaib, Chief Executive Officer, PT.  Specifying the technology selection criteria used when
BAKRIELAND DEVELOPMENT TBK procuring for water infrastructure projects
 Case Study of water infrastructure projects by KIE: UPP
12:30 Lunch and Networking and DNSWC
 Emphasising the key trends in wastewater recycling
13:30 ROUND TABLE DISCUSSION: The Past, Present and the Future and management in Asia
for Water Infrastructure in Indonesia – Achieving Tay Lim Heng, Chief Executive Officer, KEPPEL
Sustainable Water Supply for Indonesia INTEGRATED ENGINEERING
 Evaluating water & wastewater management best
practices 16:30 End of Conference
 Maintaining and improving water quality as pollution
increases
 Choosing the right technologies for the water
infrastructure projects

BOOK NOW!
T: +65 6722 9388 F: +65 6720 3804 E: enquiry.iqpc.com.sg
W: www.waterinfrastructureindonesia.com
WATER INFRASTRUCTURE INDONESIA Conference Date: 27 – 28 March 2012
Venue: Crowne plaza, Jakarta,
www.waterinfrastructureindonesia.com
Strategies to Deliver Clean Water; Understanding the Technical
Requirements; Developing Partnerships and Managing Water
Stakeholders
My booking code is: 21009.001 5 WAYS TO REGISTER
Email : enquiry@iqpc.com.sg
Please complete in BLOCK CAPITALS as information is used to produce Phone : (65) 6722 9388
Fax : (65) 6720 3804
delegate badges. Please photocopy for multiple bookings. Post : IQPC Worldwide Pte Ltd, 61 Robinson Road #14-01 Robinson Centre Singapore 068893
Please do not remove this label even if it is not addressed to you.
TEAM DISCOUNTS
IQPC recognises the value of learning in teams. Group bookings at the same time from the same company receive these discounts:
3 or more 7% | 5 or more 10% | 8 or more 15%
This offer is exclusive of the early bird discount. Call us for a special discount rate for teams of 10 and

VENUE: Crowne Plaza Jakarta,


above.

Jln Garor Subroro Kav, CONFERENCE DOCUMENTATION & AUDIO CD


2-3 Jakarta 12930, Indonesia. I am registering as a delegate; please send me an extra set of Conference
Documentation with Audio CD with a USD100 discount: USD499.
I cannot attend the event, please send me the Conference Documentation and Audio CD at
USD599
TELEPHONE: +62 21 526 8833 I cannot attend the event, please send me the Conference Documentation only at USD399.

Orders without immediate payment or credit card details will incur a processin g fee of SGD99
FAX: +62 21 526 8832 per order.
(N.B. Advance orders will determine whether or not this conference will be recorded - Please enclose
payment with your order.)
Any custom duties & taxes imposed on the shipment of order/s shall be borne by the recipient.

WEBSITE: www.crowneplace.com/jakarta IQPC CANCELLATION, POSTPONEMENT AND SUBSTITUTION POLICY


• You may substitute delegates at any time by providing reasonable advance notice to IQPC. • For
any cancellations received in writing not less than eight (8) days prior to the conference, you will
receive a 90% credit to be used at another IQPC conference which must occur within one year from
the date of issuance of such credit. An administration fee of 10% of the contract fee will be retained by
IQPC for all permitted cancellations. No credit will be issued for any cancellations occurring within
seven (7) days (inclusive) of the conference. • In the event that IQPC postpones an event for any
*Register and Pay in full no later than 18 March 2011 reason and the delegate is unable or unwilling to attend in on the rescheduled date, you will receive a
credit for 100% of the contract fee paid. You may use this credit for another IQPC event to be
to qualify for the Early Bird Discount. mutually agreed with IQPC, which must occur within one year from the date of postponement. •
Except as specified above, no credits will be issued for cancellations. There are no refunds given
under any circumstances. • IQPC is not responsible for any loss or damage as a result of a
CONFERENCE PACKAGES Book & Pay by 15 substitution, alteration or cancellation/postponement of an event. IQPC shall assume no liability
Regular Price
ALL PRICES IN USD Jan 2012 whatsoever in the event this conference is cancelled, rescheduled or postponed due to a fortuitous
event, Act of God, unforeseen occurrence or any other event that renders performance of this
CONFERENCE (only) 2,099 (save 300) 2,399 conference impracticable, illegal or impossible. For purposes of this clause, a fortuitous event shall
include, but not be limited to: war, fire, labor strike, extreme weather or other emergency. • Please
note that while speakers and topics were confirmed at the time of publishing, circumstances beyond
*Registrations without immediate payment or credit card details will incur a processing fee of USD99 per the control of the organizers may necessitate substitutions, alterations or cancellations of the
registration speakers and/or topics. As such, IQPC reserves the right to alter or modify the advertised speakers
and/or topics if necessary without any liability to you whatsoever. Any substitutions or alterations will
be updated on our web page as soon as possible.
DISCOUNTS: All ‘Early Bird’ Discounts require payment at time of registration and before
the cutoff date in order to receive any discount. Any discounts offered whether by IQPC (including
DELEGATE DETAILS team discounts) must also require payment at the time of registration. All discount offers cannot be
combined with any other offer.
Please photocopy for additional delegates and/or delegate with different addresses YOUR DETAILS: Please email our Database Manager at enquiry@iqpc.com.sg and inform them of
any incorrect details which will be amended accordingly.
Salutation:
DATA PROTECTION: Personal data is gathered in accordance with the Data Protection Act 1984.
Name: Your data may be passed to other companies who wish to communicate with you offers related to
your business activities. If you do not wish to receive these offers, please tick the box below.
Email: Please do not pass my information to any third party.

Telephone: PAYMENT TERMS


Registrations/orders received without immediate payment or credit card details will incur a processing fee of SGD99 per registration/order. Payment is
Job Title: due in full upon receipt of invoice. Full payment prior to the event is mandatory for attendance.

Department:
IQPC WORLDWIDE PTE. LTD.
Organisation Company Registration No: 199702288Z Copyright@ 2010 IQPC Worldwide Pte. Ltd. All rights reserved. This brochure may not be
copied, photocopied, reproduced, translated, or converted to any electronic or machine-readable form in whole or in part without prior written
approval of IQPC Worldwide Pte. Ltd
Nature of Business

Address: PAYMENT METHOD


PAYMENT POLICY: Payent is due in full upon booking. Full payment is mandatory for admission to
Country: the event.
By Cheque/Bank Draft: Made payable to IQPC Worldwide Pte Ltd
Postcode:
By Direct Transfer: Please quote 19144.001 with remittance advice
Fax:
IQPC Bank details:
Approving manager’s name: Account Name: IQPC WorldwidePte Ltd
Job Title: Bank Number: 7232 | Account Number: 260-085824-690|
Swift Code: HSBCSGSG
Address
The Hong Kong and Shanghai Banking Corporation, 21 Collyer Quay,
#08-01 HSBC Building, Singapore 049320
Correspondent Bank: HSBC Bank USA, New York
Swift Code for correspondent bank: MRMDUS33
All bank charges to be borne by payer: Please ensure that IQPC receives the full invoiced amount.
Signature: Date:
I agree to IQPC’s payment terms and cancellation policy. Please note: If you have By Credit Card:
already registration and acknowledgement before the conference, please call us to
confirm your booking. Please debit my credit card:

Visa MasterCard Amex

BOOK NOW!
T: +65 6722 9388 F: +65 6720 3804 E: enquiry.iqpc.com.sg
W: www.waterinfrastructureindonesia.com

Vous aimerez peut-être aussi