Académique Documents
Professionnel Documents
Culture Documents
Motor Flat Cable S/N Length Model Total Length WHC Type Upper connector S/N WH PENETRATOR S/N lower connector S/N
Pump S/N Type Stages Model Length Coating P/N Primary V Step Down Transforfter Step Up Transforfter
Intake / Gas Sep S/N Type Model Length Coating P/N TVSS S/N Fixed Speed Drive Variable Speed Drive
V / A: kVA:
Seal S/N Type Model Length Coating P/N Resistance 1*2 1*3 2*3 1*G 2*G 3*G
Mtr
Cble
Motor S/N HP VA Model Length Coating P/N 1*2 1*3 2*3 1*G 2*G 3*G
Mtr/Cable Bottoft
Reftarks
Unit Base:
PULL OUT REPORT
Date Installed: Date Commissioned: Date Failed / Switched Off for Pull: Date Pulled: Quote No:
Pull Reason: Manufacturer: Well No: Length: Reel #: Size: Team Leader:
Fuses Cleared: Cable Damaged on Pulling: Mtr/Cable 1*2 1*3 2*3 1*G 2*G 3*G Team Members:
Pres. Sensor SN: Condition: Motor Flat SN: Condition: Shroud Hanger Corrosion:
Pump Part No. Pump Serial No. Type Stages Model Pump Condition Pump Clear Pump Plug Pump Loose Pump Free Pump Stiff Pump Lock Shaft Break
Intake Part No. Intake Serial No. Type, UT/LT, Model, Intake Condition Int. Clear Int. Plug Int. Loose Int. Free Int. Stiff Int. Lock Shaft Break
Seal Part No. Seal Serial No. Type, Model, HL/Std Seal Condition Seal Good Seal Dry Seal Wet Seal Free Seal Stiff Seal Lock Shaft Break
Motor Part No. Motor Serial No. H.P. Volts Amps Motor Condition Motor Wet Motor 1*2 1*3 3*3 1*G 2*G 3*G
Resistance
Resistance
Resistance
Resistance
COMMISSIONING REPORT
Well: Date: On location Unit start
time: time:
Field: Install Date:
No Load
Load
Restart Over Under Over Under Static BHP Start MTR 1 Hr. BHP 1 Hr. MTR
DHMS SU S/N: DHT Chk S/N: EPRM Rev: DHT Brd S/N:
Customer Rep.:
MONITORING REPORT (7 Days)
Field Well Install Date Commission Date Type of well fluid
Motor
Motor HP, Voltage, Frequency, Flc Transformer Tapping Voltage Pump SW.B
Loading
A B C A B C U/L O/L Hz Hrs Hrs No ft psi psi psi psi psi inch
Start-up
Day1
Day2
Day3
Day4
Day5
Day6
Day7
Days
Notes & Observations ( Non attendance / delays / Problems / unusual events / Suggestions for Improvement )
Signed ( Alkhorayef )
Page 4 of 6 02/05/2018
Gross
Flow
Rate
BPD
Page 5 of 6 02/05/2018
ESP Field Failure Analysis Report
Date: Customer: Well:
Splice blown Intake / Gas Sep. Upper pigtail Incorrect shaft ext.
Poor crimp Bad shaft play Primary fuses blown Bad shaft play