Supply, erection & testing of all hot water piping external to cooling tower including risers, riser isolation valves, etc.
1. Sizing, Hydraulic design, CFD analysis, structural design, Construction (including supply of all civil work materials),
erection, construction supervision, testing, etc.
2. Design, supply, erection and commissioning of sluice gates
GA / Architectural Drawing, structural design, supply of all material, preparation of AFC drawings, construction (including
supply of all civil work materials), Air condition system, erection, construction supervision, testing, etc.
Structural Design, supply of all material, preparation of AFC drawings, construction (including supply of all civil work
materials), erection, construction supervision, testing, etc.
--
Erection, installation, allied civil work (if any), testing and commissioning of balance electrical items viz. switchgears,
transformers, all power & control cables, cable trays & supports, cable trench, etc.
1. Design, engineering, procurement, supply, erection / construction, testing & commissioning of balance instruments,
analysers, DCS system, etc.
2. Supply, installation, all associated civil work & testing / commissioning of cable trench (within battery limit) designed
by Paharpur
Design, engineering, procurement, supply, erection, testing & commissioning
--
Design, engineering, supply of all material, preparation of AFC drawings, construction (including supply of all civil work
materials), erection, construction supervision, testing, etc.
Design, engineering, supply of all material, preparation of AFC drawings, construction (including supply of all civil work
materials), erection, construction supervision, testing, etc.
Task Name
INPUTS FROM CLIENT
Handing over of Site
Area for Office & Store
Laydown Area
Area for Labor colony
Handing over of Basin duly Tested
CW Return up to B/L
CW Sump
CWTP Building
Civil foundation for SSF
Civil foundation for Naclo2 and HCL Tank
Availability of Power & Water for
Commissioning cell 1-8
Completion of Inputs