F) 50 M3 Masonry RCC Sandwich clean water Reservoir

Item No. Description of work Unit Quantity Unit Cost

1 EARTH WORK
Site clearing up to a depth of 20 cm to remove the top soil
1.1
Excavation of soil for an average depth of 180 cm
1.2

1.3 Cart away surplus excavated material for an average


distance 100maway from the site
SUB TOTAL
2 MASONRY

40 CM thick basaltic or equivalent hard core well rolled,


2.1 consolidated and blinded with crushed stone

2.2 40 cm thick basaltic or equivalent stone masonry wall


bedded in 1:3 cement sand mortar bedded in 1:3 cement
sand mortar
Sub Total
3 CONCRETE WORK

3.1 10 cm thick lean concrete over hard core in class 15 with


minimum cement content of 150 kg/m3

3.3 Ditto , but 15 cm thick for cover slab


3.4
10 cm thick concrete sandwiched between masonry walls.
15 cm thick ring beam concrete in C-25 filled in to
fromwork and vibrated around rod reinforcement. Cost of
formwork and reinforcement measured separately.
3.5

Reinforcement bars supply, cut, bend and place in position


3.6 as shown on the drawing

dia. 6mm
dia. 10mm
dia. 12mm
dia. 16mm

3.7 Supply and place in position 3/4mm hexagonal mesh wire


for hoop tension
Sub Total
4 FINISHING WORK

4.1 Apply 3 cm thick trawl finish cement screed with 1:3 mix
cement sand mortar over the floor slab
Apply minimum 25 mm thick plastering to the internal wall
4.2 of the reservoir with 1:2 mix cement sand mortar to fine
finish to make the reservoir water tight

4.3 Ditto, but to the grade & ringbeam and slab


4.4 Chiesel and Apply pointing to the external wall of the
reservoir with 1:2 mix cement sand mortar
Sub Total
5 Construct 70 cm wide semi dressed stone pavement
around the reservoir

6 Supply and install B- class G.I. pipe of required diameter


with all accessories as shown on the drawing for overflow,
inlet, outlet, drain, vent and internal ladder

7 Supply and install steel manhole lid (80*100cm) made of


4mm thick sheet metal and 25*25mm angle iron
reinforced with 14 mm reinforcement bar. Cost to include
supply and application of two coats of antirust paint.

Construct H.C. Block valve chamber (70cm * 90cm* 60 cm


8 internal dimension) and fit with B- class G.I pipes and
European origin fittings, gate valves as shown on the
drawing.

Supply and install best European quality water meter and


9 fittings of the required diameter at the outlet and inlet of
the reservior
Sub Total
10 FORM WORK

Supply and prepare flat iron sheet form work reinforced


with eucalyptus pole bracing in top slab and ring beam.
Costs include supply of all necessary materials and placing
in position.
Sub Total
TOTAL
Total cost