PROCEDURE FOR
HOLD’s
Document Number
Rev. Page
PROCEDURE FOR
Table of Contents
1. PURPOSE .................................................................................................................................... 4
4. GENERAL .................................................................................................................................... 5
5. SCOPE ......................................................................................................................................... 5
Document Number
Rev. Page
PROCEDURE FOR
1. PURPOSE
PETRONAS intends to build a grass root integrated Refinery and Petrochemicals Complex by
meet both domestic and Asia's energy and chemicals demand.This Quality Control
Methodology describes the minimum requirements & procedure for performing Hydro
Pneumatic testing on Tanks by the CONTRACTOR in line with the contractual requirement to
Design and Construction Code & Standard : ASME Section VIII Div.2, Edition 2015-U2 Stamp
To list also references for Ethylene Storage Tanks, Heat Exchangers, Rectangular tanks, etc.
2. REFERENCE DOCUMENTS
standard
ASME Section VIII Division 1 Ed. 2015 Rules For Construction of Pressure Vessels
ASME Section VIII Division 2 Ed. 2015 Rules For Construction of Pressure Vessels
ASME Section II Ed. 2015 Boiler and Pressure Vessel Code –Materials
ASME Section V Ed. 2015 Non-Destructive Examination
CONTRACTOR: China Petroleum Pipeline Bureau (CPP) & China Petroleum Pipeline
Malaysia (CPPM)
Document Number
Rev. Page
PROCEDURE FOR
QC Quality control
mechanically completed in all respects. OWNER/ PMC shall check physically as well as
documentation wise. Water filling shall start after OWNER/ PMC clearance has obtained.
5. SCOPE
This procedure describes the requirements for performing Field Hydro Pneumatic tesing of
Which tank?
6. RESPONSIBILITIES / PERSONNEL
Test Supervisor or test subcontractor shall be in charge and responsible for performing, control,
Please use
coordination and supervision of hydro testing activities.
consistent terms;
if want to use
Test Supervisor, QA/QC Inspector and QA/QC Engineer are responsible to ensure the test are carried out in
hydro pneumatic test of the tank. Testing Personnel shall perform all testing functions set forth
by the
To correct the format...
which
Construction Supervisor that may include, but are not limited to:
h) Test documentation
Document Number
Rev. Page
PROCEDURE FOR
Fresh( potable ) water shall be used for tank hydro testing if possible, At locations potable
water is not available in sufficient quantity or where cost of using potable is prohibited, river
water, dock water or sea water may be used, in such a case a water chemistry test shall be
performed to determine the PH factor, chloride content and presence of other corrosive
Whenever non potable water is used for testing, the length of time that the water is kept in the
The content of chloride ion in the test water of medium carbon steel vessel is not more than
250PPM. Test water requirement shall be based on RAPID-FE1-TPX-CMM-SPN-0001-0903 and PTS 61.10.08.11.
(a) Visual observation shall be made for inspecting foundation Settlement at the following
■ After being identified as acceptable upon NDT, spherical tank is filled with water for
■ Before spherical tank is filled with water, the settlement observation point shall be defined
on each support or pier and clearly marked.Measurement is made by level gauge and
tower rule, with level gauge forming a triangle with the reference point and the support
■ when the liquid level is raised up to 1/3 the inside diameter of spherical vessel(7500mm
■ when the liquid level is raised up to 2/3 the inside diameter of spherical vessel (15000mm
(b) Settlement shall be measured at each support column foundation. All support column
foundations shall be uniformly settled. The difference in settlement for each support column
foundation after liquid completely drained off shall be not greater than 0.5Db/1000 (Db
foundation circle diameter, mm), that is 11mm. The difference in sinking between two
adjacent support column foundations shall be not greater than 2mm. Otherwise, some
Document Number
Rev. Page
PROCEDURE FOR
8.2 Hydrostatic test shall adopt uncontaminated water with water temperature not lower than 5℃ .
Water test pressure shall be 2.86MPa. Make reference to the drawing. As per PROJECT SPECIFICATION and PTS,
for PVs and HEX, the test pressure shall be as per PTS 31.22.20.31 and
RAPID-FE1-TPX-MEC-SPN-0001-0101 para 6.9.1.3.
8.3 Test requirements
■ Prior to static hydraulic pressure test, all data of mechanical property test of the product
template shall be acceptable. All welding works are finished and are qualified upon NDT.
Such gas pressure test shall be performed with participation of Owner and PMC and local
authority Third party authority Inspector. The test work shall be supervised under
provided separately on the top and bottom of spherical tank, and their scale is better to
be 2 times the test pressure, but not less than 1.5 times or more than 3 times. Both
diameter of panel is 150mm. Reading of the pressure gauge on the top of tank is taken
■ The outer surface of testing spherical vessel shall be kept dry through the whole testing
process.
■ When the metal temperature of vessel shell is close to liquid temperature, the pressure
■ During testing, the pressure shall be raised gradually up to 50% of the test pressure,
and be HOLD for a period of 10min. Then, all the welded joints and the connection
locations of the vessel shall be inspected for leakage. If no leakage occurs, the pressure
■ When the pressure is raised up to design pressure, HOLD pressure for a period of l0min,
the leakage inspection shall be performed once more. If there no leakage occurs, the
Then release the pressure to design pressure, and make a leakage inspection again. If
completely drained off. The inside of spherical vessel shall be dried by compressed air.
The testing liquid shall not be drained off directly at the site.
For PV and HEX, the test duration shall be as per PTS 31.22.20.31 para 6.9.1.3.
Electronic Filename: RAPID-P0030-CPP-QAC-PRC -0001-0024_A.docx
Document Number
Rev. Page
PROCEDURE FOR
■ During test, it is forbidden to hammer at the tank and it is needed to pay attention to
ambient temperature change and to monitor the reading changes on pressure gauge so
as to avoid overpressure.
It has been discussed during Constructability Review that Leak Test for spherical vessel is not applicable.
For P30 project, leak test is required for cryogenic tank (combined test with hydrostatic test), reinforcing
pad on nozzles, tank bottoms and annulars (vacuum leak test), valves, etc. CPP to advise.
9. LEAK TEST
9.1 Leak test shall be conducted on the spherical vessel after passing hydrostatic test only. The
9.2 Prior to gas-tight test, safety device, valve and pressure gauge etc. on the tank shall have
9.3 Two calibrated pressure gauges with the same scale are installed separately on the top and
bottom of the tank. Their scale is 1.5-3 times the test pressure, and the diameter of panel is
150mm.
9.4 The testing gas used for leak test shall be the dry and clean air.
9.5 The test temperature of gas in leak test shall be not less than 15°C.
9.6 The pressure gages and safety valve used for leak test shall be calibrated and and shall be
■ During testing, the pressure shall be raised gradually up to 50% of the test pressure and
be HOLD for a period of 5min. All the welded joints and the connection locations of the
spherical vessel shall be inspected for leakage. If no leakage occurs, the pressure
■ When the pressure is raised up to the test pressure and HOLD for a period of 10min, the
leakage inspection shall be made once more. If no leakage occurs definitely, the
■ During test, it is needed to pay attention to ambient temperature change and to monitor
■ Finally to release the pressure in a slow way after a joint inspection by the Owner,
Document Number
Rev. Page
PROCEDURE FOR
10. CLEANING
After dewatering of the tank, after hydro test, cleaning of inner wall & bottom shall be carried out
and thoroughly flushed with clean fresh water & debris if any shall be clean removed. Standing
water silt or other dirt left in the tanks after hydro test shall be thoroughly cleaned appropriately.
11. ATTACHMENTS
SPHERES
To show common pressure-time graph for the hydrostatic test. Show % of water pressure also acceptable.
PETRONAS
FIELD INSPECTION & TEST PLAN Civil □ Instrumentation □ H = Hold Point / Approval
FOR HYDRO TESTING OF TANKS Structural □ Pipeline □ W = Witness Point
DISCIPLINE Mechanical □ Process □ R = Review Document
Piping □ Others □ S = Surveillance Inspection
Electrical □
RESPONSIBILITY
INSP. ACCEPTANCE CRITERIA
STAGE /
QC ACTIVITY QUALITY RECORDS OWNER/ REMARKS
NO. (PROCEDURE/DWG/ STD/ FREQ. CONTRACTOR TPIA
SPECS.) PMC
_
4 Liquidation of check list, If applicable Before HT Punch list H W
7 Scrutiny of test packs for Mechanical & NDT Clearance Tank History sheets Before HT LHS W W
8 Review of Calibration certificates of pressure Gauges Calibration certificates Before HT Calibration certificates H H
FIELD INSPECTION & TEST PLAN Civil □ Instrumentation □ H = Hold Point / Approval
FOR HYDRO TESTING OF TANKS Structural □ Pipeline □ W = Witness Point
DISCIPLINE Mechanical □ Process □ R = Review Document
Piping □ Others □ S = Surveillance Inspection
Electrical □
RESPONSIBILITY
INSP. ACCEPTANCE CRITERIA
STAGE /
QC ACTIVITY QUALITY RECORDS OWNER/ REMARKS
NO. (PROCEDURE/DWG/ STD/ FREQ. CONTRACTOR TPIA
PMC
SPECS.)
12 Witness of Hydro testing Hydro test Report After HT Hydro test Report H H
_
15 Draining of Water _ FINAL H W
FIELD INSPECTION & TEST PLAN Civil □ Instrumentation □ H = Hold Point / Approval
FOR HYDRO TESTING OF TANKS Structural □ Pipeline □ W = Witness Point
DISCIPLINE Mechanical □ Process □ R = Review Document
Piping □ Others □ S = Surveillance Inspection
Electrical □
RESPONSIBILITY
INSP. ACCEPTANCE CRITERIA
STAGE /
QC ACTIVITY QUALITY RECORDS OWNER/ REMARKS
NO. (PROCEDURE/DWG/ STD/ FREQ. CONTRACTOR TPIA
PMC
SPECS.)
_
16 Removal of temporary blinds/supports _ FINAL H W
19 FINAL H W
applicable report report
20 Review of Inspection & Test Documents Final Documents FINAL Final Documents H R
Water Filling
Time Holding
Time
From To
3
1 m m .hrs
3
2 m m .hrs
3
3 M m .hrs
3
4 Full m m .hrs
No. Stage
0-45 45-90 90 - 135 135-180 180 -225 225 -270 270 -315 215-360 Remarks
1 Before Fill HP
4 Full HP
5 Empty HP
Notes:
If
3
Type of Tank: Diameter: m. Height:: m Volume: m
Notes: