The Start up Sequence is available at the Start up STG windows for each unit. If
the term required on the sequence has been full filled, the status will be declare as
‘DONE’ and the sequence will go to the next step automatically. When a Function
Group (FG) is still OFF, the sequence will automatically make it ON.
Below are the Start-up mode based on Metal Temperature of Turbine casing:
- Cold Start Condition : Tm < 220 degC
- Warm Start Condition : Tm < 420 degC
- Hot Start Condition : Tm > 420 degC
Warming-up pipe
Start Up Sequence :
1. Start FG Enclosure Ventilation.
- FG Ventilation Feedback ON.
2. Start FG Drain.
- FG Drain Feedback ON.
3. Start FG Lube Oil.
- FG Lube Oil feedback ON.
4. Start FG Turning.
- FG Turning Gear Feedback ON.
- Turning Gear Time > 2 Hours.
5. Start FG Condensate.
- FG Condensate Feedback ON.
6. Start FG Leak – Off Steam.
- FG Leak – Off Steam Feedback ON.
7. Condenser Cooling in Operation.
8. Start FG Sealing Steam.
- FG Sealing Steam Feedback ON.
9. Close Vacuum Breaker.
- Vacuum Breaking Valve in Close Position.
10. Start FG Evacuation.
- FG Evacuation Feedback ON.
11. Start FG Hydraulic.
- FG Hydraulic Oil Feedback ON.
12. Turbine Auxiliaries in Service.
13. Open ESV.
14. Turbine Run – Up & Excitation.
- Field Breaker Close.
- Not Excitation Trip.
- F/O Controller Active.
15. Synchronization.
- If Manual Synchronization selected :
Sequence is HOLD, until manual Synch. Reset or GCB close.
- If Auto Synchronization selected :
Select “Auto Synch”.
Select “Synch ON”.
- Generator Breaker closed Position.
16. Loading.
17. Load above minimum load (>14 MW).
18. Steam Turbine in Service.