TATA PROJECTS LTD

Suspension Platform check list (Format No: TPL/NMDC- NGR/10)


NMDC Nagarnar Project, Nagarnar Site.
Date
Sl. NA NA NA NA NA YES No NA
Points Yes No Yes No Yes No Yes No Yes No
No.
1. Is there a suitable and sufficient gratings
(JALLY) Provided around the openings?
2. All gratings (JALLY) Secured at both ends?
3. Life line provided on surrounding of
suspended platform outer edge?
4. All Chain pulley blocks in working condition?
5. All wire ropes in tightly secured with
platform?
6. Proper housekeeping maintained in the
platform?
7. No power cable routed above the platform?
8. Working condition of ELCB?
9. Access ladder condition?
10. Trained personals allowed for lifting the
platform?
11. All Chain pulley blocks having hook latch?
12. Required number of “C” Clamps is provided
for wire ropes? (3 Nos minimum)
13. Any wire passing through the sharp edges?
14. Unwanted / flammable materials are stored?
15. Fire extinguishers placed and found working
condition?
16. Sufficient illumination provided for working?
17. All D shackles found without any visible
crack?
18. All loose materials kept in safe area to avoid
roll and fall?

Page 1 of 2
TATA PROJECTS LTD
Suspension Platform check list (Format No: TPL/NMDC- NGR/10)
NMDC Nagarnar Project, Nagarnar Site.
Date
Sl. NA NA NA NA NA YES No NA
Points Yes No Yes No Yes No Yes No Yes No
No.
19. Hand rails, mid rails and toe guard in place
for center materials lifting openings?

20. Entry restricted at below level of hanging


platform during the working above JALLYs.
21. Electrical bells are working properly?

22. Fall block arrester working properly?

23. Running wire rope rubbing anywhere?

24. Other Points:-

Signature of TPl Engineer

Signature of TPl Safety officer

Signature of contractor Supervisor

Signature of contractor safety officer

Prepared by Approved by

Name Name
Signature Signature
Designation Designation