Batu Hijau Model for Throughput Forecast, Mining and Milling

Optimisation and Expansion Studies


Ben Burger*, Karen McCaffery*, Alex Jankovic¥, Walter Valery¥, David La Rosa¥, Ian McGaffin*

*
Newmont Mining Corporation
¥
Metso Minerals Process Technology (Asia-Pacific), Brisbane, Australia

EXECUTIVE SUMMARY

PTNNT Batu Hijau and Metso Minerals Process Technology (Asia-Pacific) (MMPT-AP)
have developed a comprehensive model for forecasting and optimising throughput at the Batu
Hijau operation. The model is based on mechanistic models of blast fragmentation, crushing,
milling, and classification. The inputs to the model are the proportions and main
characteristics of the defined ore domains (e.g. Rock Quality Designation (RQD), Point Load
Index (PLI), Bond Work Index, lithology, design and operating conditions). The final model
is able to predict monthly throughputs within an accuracy of 5% and is also being used for
optimisation of the entire mining and milling processes and for expansion studies.

MMPT-AP has developed a stand-alone program to encapsulate the final throughput model
with a user friendly interface. This is used to input ore delivery information with blend
composition and key model parameters and to output the model predictions (throughput,
circuit performance and product size distributions from the ROM to the final grinding
product). The intent is to give users in the mine and plant a simple interface to run simulations
and allow geology, mining, processing and management the ability to predict unblended
throughputs for each of the defined ore domains as well as final blend throughput.

INTRODUCTION

The Batu Hijau ore body is a copper and gold porphyry deposit located in south west
Sumbawa, in the province of Nusa Tenggara Barat, Indonesia. The process plant was
designed to treat 120,000 TPD of ore through two SABC mill grinding circuits to produce a
copper-gold concentrate.

Concentrator operations started up in September 1999 and have been subject to continuous
improvements to increase mine and mill production rates. Major improvements in mill
availability, flow sheet changes to the SABC pebble crushing circuit in 2002 and 2003 plus
miscellaneous de-bottlenecking projects increased mill production rates by >10% since 2001.
Improvements in Mine blasting practices increased fragmentation of harder ores and
improved mill throughput by 2-7% since late 2003. Average flotation feed grind size
increased from 200 to 240 microns as a result of the throughput increases, with only minor
penalty to flotation recovery.

Mill throughput rates are highly variable with daily throughput rates ranging from 4,500 to
7,300 TPH. The effect of mill feed size and hardness on throughput rate is apparent with feed
size F80 ranging from 40 to 95mm.

-1-
Several years of record low commodity prices immediately after start up at Batu Hijau placed
pressure on the mine to produce grade and the mill to maximise throughput, for the operation
to remain economically viable. Hence, corporate management required an accurate (±5%
annual tonnes) mill throughput model, for strategic planning to ensure life of mine economics.

It was also recognised that optimisation of ore delivery on a revenue per mill run hour basis,
could offer economic benefits by maximising metal production and provide a basis for ore
blending. Revenue per mill run hour could be determined by including mill throughput rate in
the traditional mine revenue per tonne model (grade x recovery – smelter charges).

ORE CHARACTERISATION and MILL THROUGHPUT MODELLING

SAG Mill throughput rates are dependant on ore hardness or breakage rates in the mill and
mill feed size distribution. If both breakage rates and mill feed size can be measured or
modelled for an ore, a JKSimMet model can accurately predict SAG mill performance.
Breakage rates are dependant on rock strength while mill feed size is dependent on in-situ
rock structure, rock strength, blast intensity and primary crushing.

The first step in producing an accurate mill throughput model is to develop an understanding
of geological parameters that define rock strength and rock structure. In a collaborative effort
through 2004, the Batu Hijau Mine-to-Mill Team and Metso Minerals Process Technology –
Asia Pacific (MMPT-AP) conducted a comprehensive review of ore hardness and
fragmentation in the Batu Hijau ore body to define mill throughput domains. Metso provided
a modelling process for each domain that utilised blast fragmentation and primary crusher
models to predict SAG mill feed size and produce a more accurate mill throughput model.

HISTORICAL ORE CHARACTERISATION

This section summarises the post start-up ore domain definitions used at Batu Hijau. Ore Domains
used for design of the Batu Hijau grinding circuit is not discussed.

Initial ore characterisation for mill throughput prediction was based on lithology and RQD. An RQD
cut-off of 50% was used to differentiate hard from soft ore. Process operating experience in 2003
indicated that lowering the RQD cut-off to 40% provided better definition by equalising the tonnage of
ore in the plus and minus RQD fractions of each major lithology.

Table 1. Batu Hijau Ore Definition


Ore definition 2000-2003 Ore Definition 2003-Q2 2004
Faulted Volcanic RQD<40%
Volcanic RQD<50% Volcanic RQD>40%
Volcanic RQD>50% Diorite RQD<40%
Diorite RQD<50% Diorite RQD>40%
Diorite RQD>50% Intermediate Tonalite RQD<40%
Intermediate Tonalite RQD<50% Intermediate Tonalite RQD>40%
Intermediate Tonalite RQD>50% Young Tonalite RQD<40%
Young Tonalite Young Tonalite RQD>40%
Undifferentiated (Stockpile Undifferentiated (Stockpile rehandle)
rehandle)

-2-
NEW TECHNIQUE FOR ORE DOMAIN DEFINITION

Recognition that both SAG mill feed size and ore hardness/breakage rates dictate SAG mill
throughput rates allows geological indicators for both to be used to define ore domains for
mill throughput prediction.

The geological model developed by exploration geologists at Batu Hijau is extensive and is
testament to their efforts in core logging and rock characterisation. Table 2 shows the number
of measurements utilised in the geological model. Definition of ore hardness domains
depends on correlations between the relatively few metallurgical comminution tests and the
statistically representative measurements like grade, RQD and PLI.

Table 2. Geological Database Summary


Number of Avg Value
Units Samples 2004-LOM
Cu Grade % Cu >50,000 0.59
RQD % >70,000 44
RMR % >70,000 55
PLI N/mm2 >12,000 5.4
Wi CR kWh/t 265 8.1
Wi RM kWh/t 287 14.9
Wi BM kWh/t 287 11.2
Ai - 287 0.24
Axb - 39 55

In-situ rock structure, as indicated by block size, in combination with blast powder factor will
dictate ROM fragmentation size and hence SAG mill feed size distribution. Ore hardness and
hence breakage in the SAG mill can be correlated to rock strength measurements, such as
UCS and point load index.

Sag Mill Feed Size

Process plant operating data (4 day averages) from Nov 2003 to April 2004 confirm the
following relationships

• SAG mill feed rate decreases as feed size F80 from Split-OnLine measurements
increases
• SAG mill feed size increases as RQD1 increases

Thus SAG mill feed size and throughput rate is related to RQD, but size can be modified with
blast designs to influence mill throughput.

1
RQD% or Rock Quality Designation is defined as the cumulative length of core pieces longer than 10 cm in a
core run divided by the total length of the core run including all lost core sections and excluding mechanical
breaks caused by the drilling process. RQD% is a measure of in situ block size

-3-
7000 80
6500
70

Total SAG TPH


6000
60

RQD (%)
5500
5000 50
4500
40
4000
30
3500
3000 20
50 55 60 65 70 75
SAG Feed Size F80 (mm)

SAG TPH RQD

Figure 1. RQD effect on SAG feed size and SAG throughput

Ore Hardness

Mill throughput modelling using JKSimMet software requires ore breakage properties to be
derived from the JKTech Drop Weight test procedure in combination with SAG mill feed and
product size distribution.

The JK Drop weight test is expensive, time consuming and requires large samples, but it
provides an accurate measurement of the breakage distribution function of the ore in a SAG
mill. By early 2004, drop weight tests had been conducted on 39 samples of Batu Hijau ore
taken from infill drill programs in 2002 and 2003. The results indicated significant variability
in ore hardness with the A x b results ranging from 23 to 107. The bulk of results ranged
from 35 to 65 indicating the average ore is amenable to SAG milling.

A mechanism was required to be able to model the SAG breakage function through the whole
ore body (1.3 billion tonnes). A relationship between drop weight Axb and Point Load Index,
as a measure of rock strength, has been identified for many different ore bodies
(JKMRC/AMIRA). The Point load test is a cheap, quick test on a small sample of drill core.
More than 12,000 tests have been performed on Batu Hijau drill core providing sufficient data
density to define ore hardness domains. Low PLI and High Axb values indicate low
resistance to breakage (ie High breakage rates) and hence higher mill throughput rates.
The PLI and Axb measurements from the Batu Hijau drop weight tests demonstrate a similar
relationship observed for other ores, but each lithology has a unique PLI vs Axb relationship.
Note: Axb results were adjusted by dividing by ore density (~2.62 t/m3 for Batu Hijau).

-4-
120
Diorite
100 All Tonalites
Volcanics

A*b adj (m3/kWh)


Tonalite (MMPT Database)
80
Volcanics Best Fit
Diorite Best Fit
60 MMPT Database

40

20

0
0 2 4 6 8 10 12 14

Is50 (MPa)

Figure 2. PLI vs JK Drop Weight Test result for Batu Hijau Ore and Metso MMPT
database

Using the Point Load Index to “map” ore body hardness is an efficient approach for
throughput modelling and forecast. It provides a high sample density within the ore body at
no extra cost to the mine as the test is done routinely for geo-mechanical classification. Use of
other tests (JK drop weight, SMCC, SPI test) is limited to much lower sample density due to
the significant cost involved to obtain drill core samples and conduct the tests. To map the ore
body for 4 years of production at Escondida, only 978 SPI tests were carried out, which was
insufficient to achieve the required mapping precision. Point load index was used to improve
the interpolation procedure (Flores, 2005).

Point Load Index Database Corrections. Whilst reviewing Batu Hijau data in 2004, Metso
MMPT identified significant errors in the PLI database in the Batu Hijau exploration block
model. These errors were due to two factors.
• Poor data collection/measurement for one in-fill drill campaign from year 2002. This
data was removed from the database in March 2004.
• Incorrect calculation of PLI. This issue was resolved in May 2004 using the
standardised PLI (Is50) calculation from the raw data.

The formula for calculating size corrected Point Load Index (Is50) is:

0.45
D   P 
Is(50) = 1000  e   2  (MPa)
 50   De 

Where:
P = Force applied at failure (N)
De = Equivalent core diameter (mm)

-5-
De2 = D2 (diametral)

De2 = 4A/π (for axial, block and irregular lump)

Where A is the minimum cross sectional area of a plane, through the platen contact points.

Ore Domain Definition

Definition of mill throughput domains on the basis of ore hardness and mill feed size can be
achieved using both RQD to infer size and PLI to infer ore hardness.

A review of RQD and PLI distributions at Batu Hijau indicated three ranges of RQD and PLI
could be used to define a matrix of nine (9) mill throughput domains. The ranges were
selected to evenly divide the ore body tonnes into each domain.

RQD PLI
2004 - LOM 2004-LOM
2.5% 2.5%
% of Total Mill Tonnes
Volcanics = 49%
% of Total Mill Feed Tonnes

2.0% 2.0% Diorite = 28%


% of Total Mill Feed Tonnes

Int. Tonalite = 21%


Young Tonalite = 1.4%
1.5% 1.5%

1.0% 1.0%

0.5% 0.5%

0.0% 0.0%
0 10 20 30 40 50 60 70 80 90 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14
RQD (%) PLI (Mpa)
Volc Diorite Int. Tonalite Young Tonalite Volc Diorite Int Tonalite Young Tonalite

Figure 3. Selected RQD and PLI ranges

Each domain was categorised into soft, medium or hard on the basis of ore hardness or
fragmentation size expected within the domain.

Table 3. Ore hardness Matrix

Very
Medium Hard
Hard

Hard -
PLI

Soft Hard
V. Hard

Very
Medium Hard
Soft

0 30 60
RQD (%)

-6-
Batu Hijau Mine Engineers developed a Drill and Blast “Cookbook” based on the 9-Domain
matrix, to define drill and blast parameters for use in ore shots. The design information was
collated from historical performance data and blast trial results.

Table 4. Drill and Blast “Cookbook” for Mill Feed Ore

Hole spacing
Stemming length
EP:AN
(Emulsion:ANFO) Powder Factor
Drill penetration rate

Ore Hardness with 16-Domains

The 9-domain ore hardness matrix, based on RQD and PLI, was applied to each of the four
major ore lithologies to produce 36 ore domains. Review of the ore delivery quantities in 36-
Domains immediately identified 15 domains that contained less than 1% of the ore body
tonnes hence could be eliminated. Spatial analysis of the remaining domains indicated spatial
associations could be used to combine some smaller “halo” domains with a larger
neighbouring domain. The resultant 16 domains each contain 5-10% of the ore body tonnes.

-7-
Table 5. 16-Ore Hardness Domains

16-Domains
RQD 0-30 RQD 30-60 RQD >60
PLI 0-3 V-FS V-CS
Volcanic PLI 3-6 V-MM V-CM
V-FH
PLI >6 V-MH V-CH
PLI 0-3 D-FS D-CS
Diorite PLI 3-6 D-CM
D-FM
PLI >6 D-CH
PLI 0-3
Intermediate IT-MM
PLI 3-6 IT-CH
Tonalite
PLI >6 IT-MH
PLI 0-3
Young Tonalite PLI 3-6 YT-CH
PLI >6

Where: V = Volcanic
D = Diorite
IT = Intermediate Tonalite
YT = Young Tonalite
F = Fine fragmentation (ie low RQD)
M = Medium Fragmentation or Hardness
C = Coarse Fragmentation (ie very High RQD)
S = Soft (low PLI)
H = Hard (High PLI)

Plotting the 16 Domains in the geological model illustrated high variability for mill
throughput within the deposit. Figure 4 shows a plan view of the 16 ore domains relative to
the average high and low grade ore boundaries. The figure shows that most of the harder ores
(high RQD and PLI) are located in the centre, south and west sections of the ore body. While
significant faulting has produced a low RQD in most of the North and eastern sections of the
ore body. Major faults strike NW to SE.

-8-
V-FS
V-FH
V-CS
V-MM
V-MH
V-CM
V-CH
D-FS
D-FM
D-CS
D-CM
D-CH
IT-MM
IT-MH
IT-CH
YT-CH

Figure 4. Batu Hijau ore body description in 16 ore hardness domains

MILL THROUGHPUT MODELS


This section summarises the post start-up throughput modelling experience at Batu Hijau. Modelling
conducted for design of the Batu Hijau grinding circuit is not discussed.

Historical Models
Several Mill throughput models were developed from 2001 to 2004 using the following techniques:

Simple Regression Modelling - 2002

Basic multiple linear regression models were generated by fitting several months of historical mill
throughput data to daily proportions of each ore domain. Initial models were based on simple lithology
separation and later subdivided as RQD was used to further delineate lithology.

The models generated provided reasonable throughput indicators however did not account for
throughput variations resulting from differences in mill feed size distribution.

Bond Work Index Modelling – 2002

Bond Work Index based modelling was used to determine Mill Power as a function of work index. I.e.
Mill Power = Fn (WiC2) + fn(Wirm) + fn(Wibm). This model places greatest emphasis on ball mill
power and assumes fixed feed size to the SAG mill for all ore types.

2
WiC = Bond Crusher Work Index, Wibm = Bond Ball Mill Index and Wirm = Bond Rod Mill Index

-9-
Throughput predictions produced were significantly different to actual plant performance. This was
particularly true for tonalite ores which have lowest actual mill throughput rates and also lowest Bond
rod and ball mill work indices. The tonalite ores are generally much coarser than the other lithologies
as demonstrated by their inherently higher RQD.

This modelling method was similar to models used to design the Batu Hijau grinding circuit.

Figure 5 shows that the Bond work index modelling approach is not valid for modelling SAG mill
throughput rates as it does not describe SAG mill breakage rates or account for variations in feed size
to the mill.

8000
7000
Mill Throughput TPH

6000
5000
4000
3000
2000
1000
0
Tonalite

Tonalite

Volcanic
RQD> 50

RQD>50

RQD> 50

RQD> 50
Tonalite

Diorite

Volcanic
Tonalite

Young

Young

Diorite

Empirical Ore Delivery Model JKSimMet Model (ta F80 prediction)


Bond Work Index Model

Figure 5. Mill Throughput Predictions

BOCCOST Empirical Modelling – Early 2003

BOCCOST or Blasting Optimisation Crushing Conveying Optimising SAG Throughput is a database


that captures approximately 200 variables from blasting, mining and milling operations and assigns
them to a common point in space in the geological model in real time. The intention was that the
relationships between these variables be determined with a view to optimise the overall blasting,
blending and crushing process to maximise mill throughput.

Interpretative analysis of about fifteen variables from the BOCCOST database was used to model
(i) the relationship between size of material delivered to the primary crusher and pit geology
and blasting practices
(ii) the relationship between SAG mill feed rate, pit geology and blasting practices.

Again, essentially basic multiple linear regression analysis was used over three defined ore body
zones. The zones were differentiated broadly based on major differences in faulting and lithology that

- 10 -
corresponded with perceived mill throughput zones. Initial data screening was used to isolate the
variables that had most impact on mill throughput and blasted rock size.

Model output was used as a tool to assist short and medium term mine planning. Prediction of blasted
rock size from BOCCOST was viewed to be more accurate than the throughput predictions.

JKSimMet Modelling – early 2003

JKSimMet modelling based on mill surveys and 9 drop weight results across RQD and lithology
defined ore domains, used the JKSimMet ta estimation of mill feed size P80. This model produced
similar results to the simple linear regression model.

JKSimMet Modelling – late 2003

JKSimMet Modelling using mill feed size estimation from the BOCCOST empirical blast
fragmentation model.

JKSimMet modelling from early 2003 was used to generate throughput versus mill feed F80
relationships for “hard”, “medium” and “soft” hardness ores of the form, Throughput = M x SAG
p80b. The constants M and b were determined based on functions of RQD for each ore hardness.

SAG feed F80 was estimated from a simple log fit of historical measured SAG F80 and BOCCOST
blasted rock P80. This relationship is very robust as demonstrated in Figure 6 below.

Comparison Actual and Predicted SAG Feed p80mm

85

80

75
SAG Feed p80 mm

70

65
60

55

50

45

40
29-Nov-04
14-Jan-04

22-Jun-04

8-Jan-05

17-Jun-05
23-Feb-04

3-Apr-04

13-May-04

1-Aug-04

10-Sep-04

20-Oct-04

17-Feb-05

29-Mar-05

8-May-05

Date

Average Feed p80 mm


Predicted p80 Based on BOCCOST Shovel p80
7 per. Mov. Avg. (Average Feed p80 mm)
7 per. Mov. Avg. (Predicted p80 Based on BOCCOST Shovel p80)

Figure 6. Actual SAG F80 and BOCCOST model P80 comparison.

Throughput prediction from this method was an improvement over previous modelling attempts in that
it allowed for variable mill feed size distribution however still lacked adequate accuracy for
incorporation into the ore block model revenue calculation.

- 11 -
INTEGRATED MILL THROUGHPUT MODELLING

In early 2004 Batu Hijau contracted Metso Minerals Process Technology (MMPT-AP) to
assist with ore characterization and produce domain specific mill throughput models for use in
long term production forecasting and evaluation of mill expansion options. Revised models
were required due to pebble circuit flowsheet changes in August 2003 that produced a step
change improvement in mill performance, such that previous throughput models were no
longer valid.

Metso MMPT-AP conducted modelling of the full comminution process using blasting,
crushing and grinding models to calculate SAG mill feed size, throughput rate and flotation
feed grind size. The simplified model is presented in Figure 7. This model consists of the
following combined mechanistic models:

• Blast fragmentation model


• Primary crusher model
• Milling circuit model (SAG mill, ball mill and cyclone models, pebble crusher in
closed circuit)

The results of the simulations combining the blast fragmentation model, the primary crusher
model and the complete SAG/Ball/Pebble/Screen models were divided into coarse/hard, mean
and fine/soft for each lithology. The inputs to these models were:

• The rock mass data consisting of rock quality designation (RQD) which was used to
estimate the volumetric joint distribution and then converted into a mean in-situ block
size
• Unconfined compressive strength (UCS) inferred from PLI data
• Drop weight test data and their correlations to PLI.

The blast fragmentation model assumed a blast design with bench heights of
15 m, using blast hole diameters of 311mm and a burden and spacing of 7 and 6 metres
respectively. The polygon and shovel P80’s were used to validate the model predictions.

The envelopes of ROM size distributions (soft/fine, mean, hard/coarse) were obtained using
Monte Carlo sampling followed by model simulation. Monte Carlo sampling refers to the
traditional technique for using random or pseudo-random numbers to sample from a
probability distribution. These techniques are applied to a wide variety of complex problems
involving random behavior. Each Monte Carlo iteration involves obtaining an estimate of
each of the input variables to the model based on their mean value and standard deviation.

The ROM size distribution is calculated using the model and these randomly created input
variable parameter estimates. This process is repeated 1000 times to obtain an envelope of
possible ROM size distributions based on the variation in the input data. The ‘coarse’, ‘mean’
and ‘fine’ ROM size distributions are the upper, mean and lower size distributions based on
the 5 and 95% confidence intervals.

The ROM fragmentation is used as input to the primary crusher model to predict the feed size
for SAG mills. Simulations were conducted with a crusher closed side setting of 125 mm.

- 12 -
The primary crusher product size distributions were used as feed to the SAG mill model and
simulations of the entire grinding circuit were conducted. The resulting simulated throughputs
for each ore type were “blended” according to the reported ore blending information and
compared to the actual average daily throughput.

Blast Design Ore Characterisation


Lithology zones
Rock Strength - PLI
MMPT AP Blast - DWi, A x b, ta
Fragmentation - Wicr, Wibm, Wirm, Ai
Model Rock Structure - RQD, Mapping

ROM Ore size


Distribution

Primary Crusher Grinding Circuit


Model SAG Feed Size Model
(JKSimMet/MMPT AP)
(JKSimMet/MMPT AP) Distribution

TPH P80 grind size

Figure 7. Schematic of the Modelling Approach

Preliminary Models for Ore Characterisation

Metso modelling was conducted on three different sets of ore domains to determine the level
of detail required to produce a representative and accurate mill throughput model. The
models were validated and compared to daily production information

• 8-ore domains used historically based on 4 Lithologies and 2 ranges of RQD (<>40%)
• 9-ore hardness domains (matrix) based on 3 ranges of RQD and PLI but not lithology
• 24-domains based on 4 Lithologies, 2 ranges of RQD (<>40%) and 3 ranges of PLI
(<3, 3-6, >6)

Model prediction compared to actual production is shown in Figure 8. The 24 domain model
produced the best fit indicating that a combination of lithology, RQD and PLI was required to
accurately model mill throughput rates. The 9-domain model results show poor sensitivity to
high and low throughput rates. Overall the results indicated the need to retain Lithology as a
parameter in ore domain definition.

The results of this work led to the application of three RQD and three PLI ranges to each of
the four lithologies to produce 36 domains. Spatial and quantitative ore characterisation
reduced the 36 domains to 16 domains as shown in Table 5.

- 13 -
7000

6500

Model TPH 6000 8-Domain R2=0.16


24-Domain R2=0.33
5500 9-Domain R2=0.35

5000

4500
4500 5000 5500 6000 6500 7000
Actual TPH

Figure 8. Preliminary Metso Models vs Actual Nov03-Mar 04 mill production


(4-day moving average composites)

Predicting Mill Throughput for varied Blast Designs

The Metso modelling approach was applied to the 16 ore domains shown in Table 5, using
two different drill and blast regimes

• Historical powder factor, little variation between ore types (0.25-0.35kg/t)


• Drill & Blast “Cookbook”, high powder factors in harder ores (up to 0.54kg/t)

Blast fragmentation simulations indicate a large variation in ROM fragmentation for each
lithology as a consequence of different rock strength (PLI), rock quality designation (RQD)
and blast design. Figure 9 shows the simulated ROM for Volcanic lithology.

- 14 -
100
90 V-CHc
V-CMc
80 V-CM hb
70 V-MHc
V-MMc
cum%pass
60 V-FHc
V-FSc
50 V-FS hb
40 V-CSc
V-CS hb
30 V-MM hb
V-MH hb
20 V-CM hb
10 V-CH hb

0
1 10 100 1000 10000
size (mm)

Figure 9. ROM Volcanic (hb-blast designs from the cookbook, c – old blast design)

Intense blast designs were implemented in mine operations in year 2004. The resultant
improvement in ROM fragmentation size in harder ores is shown in Figure 10. The points
plotted are annual averages for each of the 16-ore domains.

The reduction in variability of primary crusher feed size improved crusher operation and
increased average power draw for harder ores as the crusher can be operated consistently at
the target closed side setting of 120mm.

400

350
ROM Fragmentation F80 (mm)

300

250

200

150

100
0.20 0.25 0.30 0.35 0.40 0.45 0.50 0.55
Powder Factor (kg/t)

Yr 2003 - Low Powder Factor Blast Designs Year 2004 - Intense Blast Designs

Figure 10. Actual ROM Fragmentation improvement from intense blast designs

- 15 -
The primary crusher product (SAG mill feed) was obtained by “passing” the ROM ore
through the primary crusher model. This approach produced a SAG mill feed size distribution
for each of the 16 ore domains (and two blast designs).

Domain specific ore breakage parameters for input to a SAG mill model were obtained using
the JKTech drop weight test Axb result versus point load index (Is50) relationships from
Figure 2. This approach allowed evaluation of the variability of breakage rates and indicated
a “possible throughput range” for each domain and blast design (powder factor) simulated.

Finally, the “average throughput” for each domain and blasting powder factor was determined
based on “best fit” to actual daily throughput. The “average throughput” results presented in
Figure 11 show that 10-15% mill throughput rate increase could be expected in the harder ore
types with more intense blasting.

8000 1.2

7000

Drill & Blast Powder Factor (kg/t)


1.0
6000
Mill TPH (Metso Model)

0.8
5000

4000 0.6

3000
0.4
2000
0.2
1000
Volcanic Diorite Tonalite
0 0.0
D-CH
D-CS
V-CH

IT-CH

YT-CH
V-CS

D-FS
V-FH

D-CM
V-FS

V-CM

D-FM
V-MH

IT-MH
V-MM

IT-MM

Historical Mill TPH Intense Blast Mill TPH


Historical Powder Factor Intense Blast Powder Factor

Figure 11. Effect of Blast Powder Factor on Mill Throughput

Model Validation
The 16-Domain Model mill throughput rates were applied to the daily ore delivery blends for
year 2004 and compare well on a monthly/annual basis as shown in Figure 12.

- 16 -
8000

7000
Total Mill Throughput Rate (TPH)
6000

5000

4000

3000

2000

1000

0
1-Jan-04 1-Apr-04 1-Jul-04 30-Sep-04 31-Dec-04

Actual Daily Production 16-Domain Model Prediction

Figure 12. Actual Mill Throughput 16-Domains Model predictions for 2004

Model prediction errors were estimated using a sum of squared error method, weighted for
total tonnes milled in each time interval. The results are shown in the table and graph below
indicating that estimation of mill throughput for weekly ore delivery could be utilised to
optimise short term mine plans. The daily mill throughput prediction is inherently inaccurate
as the daily mine ore delivery will not match average RQD, PLI and powder factor used to
predict the average throughput rate for each domain. Additional external effects such as the
particle size segregation on mill feed stockpiles and the non-linear effect of ore blending on
mill throughput can not be accounted for in the model, hence further increasing the error of
estimate for shorter time periods.

Table 6. 16-Domains Model predictions for 2004


Average Average Average
TPH Error TPH Error %
Actual Production 6,062
Annual Model Prediction 6,070 9 0%
Monthly 258 4%
Weekly 401 7%
Daily 578 10%

- 17 -
8000
+10%

7000 -10%

Model TPH
Daily
6000 Weekly
Monthly
5000 Annual

4000
4000 5000 6000 7000 8000
Actual TPH

Figure 13. Model Predictive Performance

APPLICATION OF THE MODEL


The 16-domain model was integrated with the ore control block model to assign a mill throughput rate
factor as “mill run time required to process each ore block” (tonnes per block / mill TPH). This
simplified mine scheduling to selection of sufficient ore blocks to match forecast mill run hours for a
time period. This approach also enables optimisation of ore delivery on the basis of both payable
metal content (dollar index) and production rates.

The 16-domain model was also used to evaluate mill throughput rates during a recent mill expansion
study based on the properties of the incremental ore added to the ore delivery plans to feed the
expanded plant.

CONTINUOUS THROUGHPUT MODEL


The 16-Domain mill throughput model is useful for monthly and annual throughput forecasting as the
average properties of the ore delivered over these longer time periods is generally close to the average
RQD and PLI within each domain. The model output of an average throughput rate per domain does
not account for throughput variability within the domains hence significant step changes in throughput
prediction occur at the domain boundaries.

To be able to improve the accuracy of the mill throughput predictions on a shorter time scale a
continuous model was required that could accept any combination of RQD, PLI and blast powder
factor per domain to reflect ore blocks delivered on a daily basis.

Metso conducted more than 40 complete model runs to generate multiple fragmentation and mill
throughput predictions per domain and converted the results into a user friendly software package as
shown in Figure 14. The user can input any combination of RQD, PLI and powder factor per domain
to reflect specific ore parcels. Figure 15 illustrates the difference in the prediction resolution between
the 16-Domain model using a single throughput value per domain and the continuous model. Batu
Hijau engineers have found the continuous model to be informative, but not entirely practical for
monitoring of long time periods (monthly/annual) as the model is coded into the software developed
by Metso and hence can not be integrated into a spreadsheet calculation.

- 18 -
Figure 14. Continuous Model user interface

16-Domain Model Continous Model

8,000 8,000

7,000 7,000
6,000 6,000
5,000 5,000
Mill TPH

Mill TPH

4,000 4,000
3,000 3,000
2,000 2,000
1,000 0-30
1,000 15
30-60 30
0 45
>60 RQD 0 RQD
0-3 60
3-6 >6 1.5 3 75
PLI
4.5 6 7.5
PLI

Figure 15. 16-Domain Model and Continuous Model for Volcanic Ore Lithology

FUTURE MODEL REFINEMENTS


The path forward for refinement of ore domain characterisation and mill throughput modelling
includes additional comminution test work on drill core, updates to the geological model from infill
drilling and revisions to the mill throughput models based on the revised geology.

• Development of a continuous function equation for each ore domain that can be used in a
spreadsheet rather than using the Continuous model program. Some work has started in this
area to allow throughput prediction based on variation in RQD within each ore domain.
• Refining the model for periods where peaks and dips are not picked up. Over 80 additional
modified Drop weight tests on 2004 and 2005 infill drill samples will be conducted in 2005 to
boost model integrity.
• Ball mill and pebble crusher limiting ore – requires additional ball mill work index tests to
produce a spatially representative ball mill work index model. Some lower grade ores appear
to have significantly higher ball mill work index based on plant performance and testing of
grabs samples. The Geological model is not complete in low grade ores.
• Development of a blend model to describe the non-linear impact of blending on the
throughput rate estimates from each ore source.
• Determine the impact of mill throughput on flotation feed size distribution and consequently
on flotation recovery. Increasing grind size with throughput has variable impact for Batu Hijau

- 19 -
ore and significant losses can be incurred in some of the softer ore types. This will enable an
improved revenue cut-off relationship to be determined to truly optimise blending and ore
delivery strategy for maximising revenue.

CONCLUSIONS
An ore characterisation and mine to mill throughput modelling approach has been successfully applied
at Batu Hijau. This has produced significantly better mill throughput rate predictions than previous
modelling has allowed. The ore domain definition and modelling approach relies on definition of ore
domains based on ore Lithology, rock structure (RQD) and rock strength (PLI) and takes the in-situ
ore through blasting, crushing and milling models to produce an accurate prediction of mill throughput
for medium to long term production forecasting. Short term predictions are influenced by external
factors such as particle size segregation and residence time on process surge piles and the non-linear
impact of blending.

Improved ore definition and understanding of the Batu Hijau resource has allowed:

• Enormous improvement in communications between the Mine and the Mill at Batu Hijau.
Mine Engineering, Operations and Geology personnel understand the variables that drive mill
throughput. The Mine and Mill work with a common purpose.
• Development of a blasting “cook book” for generation of an optimum product size for feed to
the mill.
• Accurate prediction of blast fragmentation size which is the key to accurate prediction of SAG
mill feed size (F80)
• Generation of a throughput model that has superior accuracy for annual and monthly
throughput budgeting purposes and evaluation of mill expansion options

ACKNOWLEDGEMENTS
The authors would like to thank the PT Newmont Nusa Tenggara engineering, operations and
management team at Batu Hijau for their efforts and continued support of this program, and for
permission to publish this paper.

REFERENCES

Butcher, A., Valery Jnr., W. (2005) Establishing the Links Between Ore Characteristics and Crushing
& Grinding Performance, presented at the SME 2005 Conference, Salt Lake City, USA, 28 February
to 2 March, 2005.

Flores L., 2005. Hardness Model and Reconciliation of Throughput Models to Plant Results at Minera
Escondida LTDA., Chile. Paper 16 in Proceedings of Canadian Minerals Processors – 2005,

Grundstrom, C., Kanchibotla, S., Jankovic, A., Thortnton, D., 2001. Blast Fragmentation for
Maximising the Grinding Circuit Throughput at Porgera Gold Mine, Proceedings of the 27 th Annual
Conference on Explosives and Blasting Technique, pp 250-258.

Hart, S., Valery Jnr., W., Clements, B., Reed, M., Ming Song, Dunne, R. (2001) Optimisation of the
Cadia Hill SAG Mill Circuit. SAG2001 - SAG mill circuit. International Conference on Autogenous
and Semiautogenous Grinding Technology, 1, p., Vancouver, Canada

Jankovic, A., La Rosa, D., Valery Jnr., W., Tai, Y., 30 August 2004, Throughput Model for Forecasting
Production at Batu Hijau – Final Report, Metso Minerals Process Technology – Asia Pacific report to
PT Newmont Nusa Tenggara

- 20 -
Kanchibotla, S. S., Valery Jnr., W. and Morrell, S. (1999) Modelling fines in blast fragmentation and
its impact on crushing and grinding. Explo’99 Conference, Kalgoorlie, WA.

Lam, M., Jankovic, A., Valery Jnr., W., Kanchibotla, S (2001) Increasing SAG Mill Circuit
Throughput at Porgera Gold Mine by Optimising Blast Fragmentation. SAG2001 - SAG mill circuit.
International Conference on Autogenous and Semiautogenous Grinding Technology, 1, p., Vancouver,
Canada

Morrell, S. 2000. Point Load/Drop-Weight Test Correlation. Progress Report JKMRC/AMIRA .


Project D438 A.

Morrell, S., Valery Jnr., W., Banini, G. and Latchireddi, S. (2001) Developments In AG/SAG Mill
Modelling. SAG2001 - SAG mill circuit. International Conference on Autogenous and Semiautogenous
Grinding Technology, 1, p., Vancouver, Canada.

Morrell, S. and Valery Jnr., W. (2001) Influence of Feed Size on AG/SAG Mill Performance. SAG2001
- SAG mill circuit. International Conference on Autogenous and Semiautogenous Grinding
Technology, 1, p., Vancouver, Canada

Pontin, D., and Setiawan, LE., BOCCOST Modelling – Tracking and Relating Mine and Mill
Performance Indicators in Real Time to Increase SAG Mill Throughput. AusIMM Value Tracking
Symposium October 2002

Valery Jnr. W. (2004) Process Integration and Optimisation in Aggregates Production, presented at
the 2nd International Seminar on Construction Aggregates, Campinas, Brazil. 25-28 October 2004.

Valery Jnr., W., et al. (2001) Mine to mill optimisation and case studies presented at VI Southern
Hemisphere Conference on Minerals Technology in Rio de Janeiro, Brazil, 27-30 May.

Valery Jnr., W., La Rosa, D., Jankovic, A. (2004) Mining and Milling Process Integration and
Optimisation, presented at the SME 2004 Conference, Denver, CO. 23-25 February 2004.

Valery Jnr., W. (1997) A model for dynamic and steady-state simulation of autogenous and semi-
autogenous mills. Doctor of Philosophy Thesis submitted in October 1997. JKMRC, University of
Queensland, Australia.

- 21 -

Vous aimerez peut-être aussi