TANK ULLAGE ULLAGE VOLUME VOLUME FREE WATER OIL VOL V.C.F. OIL VOLUME W.C.F
CORRECTED T.O.V. T.O.V. Interface Int. Cor'ed Volume G.O.V. TEMP TEMP API 60 F TABLE 6 @ 60ºF TABLE 11
NO. m.cm m.cm CU.M. BBLS m.cm m.cm CU.M. VOL.(BBLS) BBLS C F G.S.V. G.S.V. N.S.V.
1C 18.63 18.362 17 107 Nil 107 30.0 86.0 44.6 0.98703 105 0.263 105 0.12544
2C 17.67 17.412 157 986 Nil 986 28.7 83.7 44.6 0.98818 974 2.436 972 0.12544
3C 14.68 14.449 1,363 8,571 Nil 8,571 29.2 84.6 44.6 0.98773 8,466 21.165 8,445 0.12544
4C 18.10 17.851 21 135 Nil 135 30.0 86.0 44.6 0.98703 133 0.332 132 0.12544
5C 18.15 17.903 13 84 Nil 84 30.0 86.0 44.6 0.98703 83 0.208 83 0.12544
6C 5.90 5.675 4,944 31,094 18.103 17.854 20.477 129 30,965 30.0 86.0 44.6 0.98703 30,564 76.41 30,487 0.12544
7C 12.69 12.461 2,170 13,648 Nil 13,648 29.6 85.3 44.6 0.98738 13,476 33.689 13,442 0.12544
8C 13.85 13.622 1,505 9,468 Nil 9,468 29.6 85.3 44.6 0.98738 9,349 23.372 9,325 0.12544
SL.P 18.49 18.215 0 2 Nil 2 28.8 83.8 44.6 0.98813 2 0.005 2 0.12544
SL.S 11.20 10.911 231 1,455 15.920 15.631 80.54 507 949 29.6 85.3 44.6 0.98738 937 2.342 934 0.12544
TOTAL
TOTAL 10,422 65,550 101 636 64,915 64,089 63,928
REMARKS: 937 44 893 883 880
PRODUCTION LOADING IN TO 6C
Gross Volume :(T.O.V.) 65,550 Oil Volume @ 60 F :(N.S.V.) 63,928 DRAFT FWD 6.30 m AFT
Less Free Water : 636 Less OBQ/ROB :
Oil Volume :(G.O.V.) 64,915 Overall Loaded Vol @ 60 F:
Oil Volume @60F:(G.S.V.) 64,089 Long tons/Metric tons :
Long Tons/Metric Tons : 8,039 8,168 Vessel Experience Factor :
API 60 F : 44.6 Adjusted Volum @ 60 F : Capt. Saiful Bahri
B.S & W. % Vol :. 0.20 Long Tons/Metric Tons : CARGO INSPECTOR
BERTH: OYONG
PORT: OYONG OILFIELD
DATE: 3-Feb-17
8,039 8,168
Staff
Surya Putra Jaya Master Capt. Ihwan Asrul Santos Rep. Capt. Saiful Bahri
Water Offtake
PFW PH 0
Note: : PRODUCTION LOADING INTO COT 6C
OIW Average (mg/I) 10
Regulated Waste
Category Vol (m3) Kg Comments
Biological Waste 0 0
Note :
OYONG OPERATORS DAILY REPORT
Fuel
FSO-MFO FSO-MDO Service Vessel
MDO
Remarks :
Meetings
Incidents
19-Dec-16
141,460
deg C
deg C
TO COT 6C
30493 / 63901
e Vessel
Comment
re extinguisher
se
on deck and accommodation
fuel injection valve A/E for spare
pt. activity
ntainer at laydown area
equipment
rgency machinery
Mooring/Unmooring :
NIL
Bunkering/Debunkering :
NIL
ENGINE :
1. Maintenance aux boiler
2. Warm up boiler
3. Maintenance and pressure test the fuel injection valve A/E for spare
4. Overhouled of electromotor sludge pump
5. Renewed the system oil portable air compressor deck No.1 and 2
6. Checked the starting system screw compressor
7. Running up A/E No.1 & 3 :
09.00 - 10.00: - Lifted materials santos to Cb. Adventurer 1
13.00 - 16.00: - Warmed up boiler
- Lifted materials Spj from KST.51
- Lifted and reposition the arrangement of export hose
9. EHS AUDIT/INSPECTION
TOTAL
3696
3694
TRANS ROB
0 228,862
0 78,936
ROB `
70
157
ROB
200
POB
43
28-Nov-13
NIL
NIL
NIL
NIL
NIL
FUEL STATUS REPORT
MDO
NIL
FUEL STATUS REPORT
MFO
Opening Closing
Receive Transfer Consumption Adjusment
Date Balance Balance Remarks
( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr )
01 228,862 0 0 0 0 228,862
02 228,862 0 0 0 0 228,862
03 228,862 0 0 0 0 228,862
LOG SHEET DOMESTIC & SANITARY WASTE WATER
TOTAL 393 40 0 0 0 0 0 0 0 0 0 0
LOG SHEET DOMESTIC & SANITARY WASTE WATER
TOTAL 237 23 0 0 0 0 0 0 0 0 0 0
LOG SHEET COOLING WATER
Average/
Day 4,970 532 0 0 0 0 0 0 0 0 0 0
LOG SHEET RESERVOIR OSMOSIS WASTE WATER
TOTAL 62 0 59 121
SIKLUS PENGAMATAN KESELAMATAN KERJA
Vessel Name : FSO. SURYA PUTRA JAYA
Date : 3/Feb/17
Positive /
Reported by Rank Location Description Action/Comment Negative Total
Crew mess
1 IHWAN ASRUL Master room
Advice to Duty Officer for lifting materials Done Positive 1
2 DENNY DAVID PAULUS C/O Poop deck Rubber packing at Engine workshop took out Repair (Open) Negative 1
6 AGUNG RISTIANTO 2/E Engine room Overhouled of electromotor sludge pump Done Positive 1
8 HENDRA PRATAMA 4/E Engine room Maintenance aux boiler Done Positive 1
11 ACHMAD NURUL HUDA AB Main deck Assisted Boatswain lifted materials Done Positive 1
12 MIFTAKHUL ARKHAM AB Poop deck Rain coat hunged at water tight door Shifted (Closed) Negative 1
13 M SAFARI AB Poop deck Hoisted up Indonesian flag at day time Done Positive 1
14 DEDI BIN WARNA OS Main deck Assisted Boatswain lifted materials Done Positive 1
15 ELIK BUDIANTO FTR Engine room Cleaned aux boiler area floor Done Positive 1
Assisted 3/E maintenance and pressure test the
16 SUAIB MTM Engine room
fuel injection valve A/E for spare
Done Positive 1
17 CHULWAN NURFALLAH WIPER Engine room Assisted 4/E maintenance aux boiler Done Positive 1
19 BOBY MANGONTO STWD Galley Assisted C/Cook prepared crew coffee time Done Positive 1
20 HARIANTO SULE TANAN STWD C deck House keeping in deck C passage Done Positive 1
TOTAL 20