VESSEL'S MIDNIGHT ULLAGE REPORT

VESSEL: FSO SURYA PUTRA JAYA


PRODUCT: OYONG CRUDE OIL

TANK ULLAGE ULLAGE VOLUME VOLUME FREE WATER OIL VOL V.C.F. OIL VOLUME W.C.F
CORRECTED T.O.V. T.O.V. Interface Int. Cor'ed Volume G.O.V. TEMP TEMP API 60 F TABLE 6 @ 60ºF TABLE 11
NO. m.cm m.cm CU.M. BBLS m.cm m.cm CU.M. VOL.(BBLS) BBLS C F G.S.V. G.S.V. N.S.V.

1C 18.63 18.362 17 107 Nil 107 30.0 86.0 44.6 0.98703 105 0.263 105 0.12544
2C 17.67 17.412 157 986 Nil 986 28.7 83.7 44.6 0.98818 974 2.436 972 0.12544
3C 14.68 14.449 1,363 8,571 Nil 8,571 29.2 84.6 44.6 0.98773 8,466 21.165 8,445 0.12544
4C 18.10 17.851 21 135 Nil 135 30.0 86.0 44.6 0.98703 133 0.332 132 0.12544
5C 18.15 17.903 13 84 Nil 84 30.0 86.0 44.6 0.98703 83 0.208 83 0.12544
6C 5.90 5.675 4,944 31,094 18.103 17.854 20.477 129 30,965 30.0 86.0 44.6 0.98703 30,564 76.41 30,487 0.12544
7C 12.69 12.461 2,170 13,648 Nil 13,648 29.6 85.3 44.6 0.98738 13,476 33.689 13,442 0.12544
8C 13.85 13.622 1,505 9,468 Nil 9,468 29.6 85.3 44.6 0.98738 9,349 23.372 9,325 0.12544
SL.P 18.49 18.215 0 2 Nil 2 28.8 83.8 44.6 0.98813 2 0.005 2 0.12544
SL.S 11.20 10.911 231 1,455 15.920 15.631 80.54 507 949 29.6 85.3 44.6 0.98738 937 2.342 934 0.12544
TOTAL
TOTAL 10,422 65,550 101 636 64,915 64,089 63,928
REMARKS: 937 44 893 883 880

PRODUCTION LOADING IN TO 6C

Gross Volume :(T.O.V.) 65,550 Oil Volume @ 60 F :(N.S.V.) 63,928 DRAFT FWD 6.30 m AFT
Less Free Water : 636 Less OBQ/ROB :
Oil Volume :(G.O.V.) 64,915 Overall Loaded Vol @ 60 F:
Oil Volume @60F:(G.S.V.) 64,089 Long tons/Metric tons :
Long Tons/Metric Tons : 8,039 8,168 Vessel Experience Factor :
API 60 F : 44.6 Adjusted Volum @ 60 F : Capt. Saiful Bahri
B.S & W. % Vol :. 0.20 Long Tons/Metric Tons : CARGO INSPECTOR
BERTH: OYONG
PORT: OYONG OILFIELD
DATE: 3-Feb-17

WEIGHT W.C.F. WEIGHT


TABLE 13
LT M/T

13.199 0.12745 13.411


122 0.12745 124.181
1,061.979 0.12745 1078.995
16.656 0.12745 16.923
10.437 0.12745 10.604
3,833.929 0.12745 3895.362
1,690.379 0.12745 1717.465
1,172.708 0.12745 1191.499
0.250 0.12745 0.254
117.515 0.12745 119.398

8,039 8,168

9.30 m TRIM 3.00 m


LIST NIL

Capt. Ihwan Asrul


MASTER
OYONG OPERATORS DAILY REPORT
FSO SURYA PUTRA JAYA 3-Feb-17 @ 2400 HRS

Staff

Surya Putra Jaya Master Capt. Ihwan Asrul Santos Rep. Capt. Saiful Bahri

Crude Storage Lifting

24 Hours Total (bbls) 937 Last Lifting 19-Dec

BS and W % 0.20 Lifting Vol (bbls) 141,46

Storage Gross (bbls) Next Lifting


64,915 -

Storage Net / G.S.V (Nbbls) 64,089 Next Lifting Vol (bbls) -

Storage Net / N.S.V (Nbbls) 63,928

Days to Tank Tops 274 Vessel ETA -

Total Crude This Month (Nbbls) 64,089

Water Offtake

Water Received 24hrs (bbls) 44 Offtake 24 Hours (bbls) -

Total Water in Cargo (bbls) 636 Note :

Total P/W Received (bbls) 85,564

Water Drawn off (bbls) 0 Loading/Incoming Temp 42.0

Specific Gravity 0 Storage tanks's temperature 30.0

PFW PH 0
Note: : PRODUCTION LOADING INTO COT 6C
OIW Average (mg/I) 10

OIW Peak (mg/I) 0

Non Regulated Waste

Category Vol (m3) Kg Comments

Soft Waste 0.00 0

Non Metal Waste 0.00 0

Metal Waste 0.00 0

Regulated Waste
Category Vol (m3) Kg Comments

Solid Hazardous Waste 0.00 0

Solid Hazardous From Process 0 0

Liquid Chemical Waste 0 0

Biological Waste 0 0

Liquid Hazardous Waste (Oil) 0 0

SMF (Synthetic Mineral Fibre) 0 0

Note :
OYONG OPERATORS DAILY REPORT

Fuel
FSO-MFO FSO-MDO Service Vessel
MDO

Opening (m3) 228,862 ### 80,488 0

Received / Bunkered (m3) 0 0 0


###
Consumption (m3) 0 1,552

Closing (m3) 228,862 78,936 0

Supply Remaining (days)

Remarks :

Meetings

Type Time Comment

1. Review previous day activity


2. Check and maintenance portable fire extinguisher
3. Crew change
4. Lifting and reposition the export hose
5. Monthly lubrication all grease point on deck and accomm
6. Maintenance and pressure test the fuel injection valve A/
Tool box meeting 06.30
7. Maintenance aux boiler
8. Renew the system oil portable air compressor deck No.1
9. Check the starting system screw compressor
10. Repair sludge pump electromotor

1. Review deck, engine and galley dept. activity


2. Collecting garbage into garbage container at laydown are
3. Weekly test LSA,FFA, Nav/GMDSS equipment
Supervisory Meeting 16.30 4. Weekly test safety device and emergency machinery
5. Workplace inspection
6. Check and correction the rope arrangement of export hos

Incidents

Type Reference Comments


NIL
Drills
Type Time Comment

S.T.O.P. Audit program

Observation Card Report : 20


The details see SPKK sheet *)
###
Capt. Saiful Bahri

19-Dec-16

141,460

deg C

deg C

TO COT 6C

30493 / 63901
e Vessel

Comment

re extinguisher

se
on deck and accommodation
fuel injection valve A/E for spare

ompressor deck No.1 and 2


ompressor

pt. activity
ntainer at laydown area
equipment
rgency machinery

ngement of export hose


Comment
FSO SURYA PUTRA JAYA - DAILY ACTIVITY REPORT

1. LOG OF EVENT 24 HOURS


1.1 Operations
Cargo operations :
PRODUCTION LOADING INTO COT 6C

Mooring/Unmooring :
NIL

Bunkering/Debunkering :
NIL

Personnel & Material Transfer :


05.30: 2 Persons Spj, 1 Person Mafhindo, 2 Persons Spektra, 15 Persons Pkp by. KST.51 ( Out )
09.50: 2 Cradle Santos, 1 Empty bottle nitrogen Santos by. Cb. Adventurer 1 ( Out )
13.20: 1 Garbage container Spj by. KST.51 ( In )
15.00: 1 Person Spj by. Cb. Adventurer 1 ( In )
17.00: 1 Person Mafhindo, 2 Persons Spektra, 15 Persons Pkp by. KST.51 ( In )
18.10: 5 Persons Pkp by. KST.51 ( In )

1.2 Planned/Unplanned Maintenance


DECK :
1. Assist Transferred Spj and Contractor Personnel
2. Crew changed
3. Checked and maintenance portable fire extinguisher in engine room
4. Overhauled tank cleaning valve COT 4C
5. Lubricated all grease point on deck and accommodation
6. Released the export hose at forecastle deck and lifted/secured at port main deck area
7. Lifted materials by support vessel

ENGINE :
1. Maintenance aux boiler
2. Warm up boiler
3. Maintenance and pressure test the fuel injection valve A/E for spare
4. Overhouled of electromotor sludge pump
5. Renewed the system oil portable air compressor deck No.1 and 2
6. Checked the starting system screw compressor
7. Running up A/E No.1 & 3 :
09.00 - 10.00: - Lifted materials santos to Cb. Adventurer 1
13.00 - 16.00: - Warmed up boiler
- Lifted materials Spj from KST.51
- Lifted and reposition the arrangement of export hose

2. PERMIT TO WORK PW MW HW CSE IP VAL


446 1717 375 173 7 978
2.1 J HA 446 1717 375 173 5 978
3. BUNKERS(M3) CONS RCVD
M.F.O 0 0
M.D.O 1,552 0
4. FRESH WATER (MT) CONS RCV TRNSF PROD
BLR 0 0 0 0
DOM 10 0 0 22
5. DISPERSANT, FOAM, CHEMICALS (LTRS) OSD REC CONS
REASON FOR USE 200 0 0
6. POB IN OUT
24 20
MAN HOURS ( POB X 12 HRS )
Previous man hours 218292 Days W/O LTI 1163 Since 28-Nov-13
Man hours today 240
Total man hours 218532
Safe man hours 218532
7. EHS INCIDENT AND STATISTIC REPORTING
ITEM IMS Number
First Aid Cases
Medical Treatment Injury
Lost time - Injury
Near Misses
Toolbox and Safety Meetings `
Observations card report (SPKK)
Incidents
Environmental Incident
Safety Inductions
Note :
Toolbox meeting conducted by Master, Chief Officer and Chief Engineer with deck / engine crew.
8. DRILLS/EXERCISES

9. EHS AUDIT/INSPECTION

10. ISSUES WITH LOCAL COMMUNITY

11. VESSEL ARRIVAL/DEPARTURE

12. ON BOARD TRAINING / SAFETY MOVIE / OTHERS


03-Feb-17 @2400 HRS

TOTAL
3696
3694
TRANS ROB
0 228,862
0 78,936
ROB `
70
157
ROB
200
POB
43

28-Nov-13

Previous Today Total


0 0 0
0 0 0
0 0 0
0 0 0
1662 2 1664
2285 20 2305
3 0 3
0 0 0
84 6 90

NIL

NIL

NIL

NIL

NIL
FUEL STATUS REPORT

Vessel Name FSO. SURYA PUTRA JAYA


Period Feb-17

MDO

Opening A/E A/E A/E Closing


Receive Transfer Cons. Adj.
Date Balance No.1 No.2 No.3 Balance Remarks
( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) (Hrs) (Hrs) (Hrs) ( Ltr )
01 83,108 0 0 1,310 0 1.0 0.0 24.0 81,798
02 81,798 0 0 1,310 0 12.0 0.0 13.0 80,488
Warm up boiler and crane
03 80,488 0 0 1,552 0 24.0 0.0 4.0 78,936 used
NIL

NIL
FUEL STATUS REPORT

Vessel Name FSO. SURYA PUTRA JAYA


Period Feb-17

MFO

Opening Closing
Receive Transfer Consumption Adjusment
Date Balance Balance Remarks
( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr ) ( Ltr )
01 228,862 0 0 0 0 228,862
02 228,862 0 0 0 0 228,862
03 228,862 0 0 0 0 228,862
LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2017

Quantity Domestic Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 12 14
2 13 12
3 11 14
4 12
5 12
6 14
7 13
8 12
9 13
10 13
11 14
12 12
13 13
14 11
15 13
16 14
17 12
18 13
19 11
20 12
21 12
22 13
23 12
24 14
25 12
26 12
27 14
28 14
29 13
30 14
31 13

TOTAL 393 40 0 0 0 0 0 0 0 0 0 0
LOG SHEET DOMESTIC & SANITARY WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2017

Quantity Sanitary Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 8 7
2 7 8
3 7 8
4 8
5 8
6 7
7 8
8 8
9 8
10 7
11 8
12 7
13 7
14 8
15 8
16 8
17 8
18 7
19 7
20 8
21 8
22 8
23 7
24 8
25 8
26 7
27 7
28 8
29 8
30 8
31 8

TOTAL 237 23 0 0 0 0 0 0 0 0 0 0
LOG SHEET COOLING WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2017

Quantity Cooling Water Discharge ( M3 )


Date
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
1 4,964 4,970
2 4,951 4,968
3 4,971 4,971
4 4,954
5 4,980
6 4,969
7 4,972
8 4,957
9 4,960
10 4,987
11 4,991
12 4,984
13 4,966
14 4,958
15 4,963
16 4,974
17 4,988
18 4,964
19 4,978
20 4,971
21 4,973
22 4,970
23 4,966
24 4,960
25 4,969
26 4,972
27 4,974
28 4,975
29 4,970
30 4,973
31 4,978

TOTAL 154,082 14,909 0 0 0 0 0 0 0 0 0 0

Average/
Day 4,970 532 0 0 0 0 0 0 0 0 0 0
LOG SHEET RESERVOIR OSMOSIS WASTE WATER

Vessel Name FSO. SURYA PUTRA JAYA


Periode 2017

Quantity R.O Waste Water ( M3 )


Date
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 80 135
2 70 120
3 135 110
4 80
5 120
6 125
7 130
8 60
9 40
10 110
11 100
12 105
13 100
14 55
15 85
16 90
17 90
18 95
19 55
20 75
21 90
22 80
23 80
24 80
25 95
26 150
27 110
28 150
29 125
30 140
31 90

TOTAL 2,990 365 0 0 0 0 0 0 0 0 0 0


DATA PERSONNEL ON BOARD

VESSEL : FSO SURYA PUTRA JAYA


MONTH OF : Feb 2017

DATE CREW SPJ SANTOS VISITOR/KONTRAKTOR DAILY TOTAL REMARKS


1-Feb-2017 21 0 18 39
2-Feb-2017 21 0 18 39
3-Feb-2017 20 0 23 43

TOTAL 62 0 59 121
SIKLUS PENGAMATAN KESELAMATAN KERJA
Vessel Name : FSO. SURYA PUTRA JAYA
Date : 3/Feb/17
Positive /
Reported by Rank Location Description Action/Comment Negative Total
Crew mess
1 IHWAN ASRUL Master room
Advice to Duty Officer for lifting materials Done Positive 1

2 DENNY DAVID PAULUS C/O Poop deck Rubber packing at Engine workshop took out Repair (Open) Negative 1

Induction EHS Safety and security induction to new crew


3 CENG UMAR 2/O room and visitor on board
Done Positive 1

Checked and maintenance portable fire


4 IHSANUDIN 3/O Engine room
extinguisher
Done Positive 1

Stb Poop Renewed of system oil for portable air


5 MARTHEN KAMMA C/E deck compressor deck No.1 and 2
Done Positive 1

6 AGUNG RISTIANTO 2/E Engine room Overhouled of electromotor sludge pump Done Positive 1

Maintenance and pressure test the fuel injection


7 IRVAN TAHIR 3/E Engine room
valve A/E for spare
Done Positive 1

8 HENDRA PRATAMA 4/E Engine room Maintenance aux boiler Done Positive 1

Assisted 2/E Overhouled of electromotor sludge


9 SURYADINATA E/E Engine room
pump
Done Positive 1

Accommodati The entrance wall at port accommodation (upper


10 A AFANDI Bosun on deck) looks dirty
Painting(open) Negative 1

11 ACHMAD NURUL HUDA AB Main deck Assisted Boatswain lifted materials Done Positive 1

12 MIFTAKHUL ARKHAM AB Poop deck Rain coat hunged at water tight door Shifted (Closed) Negative 1

13 M SAFARI AB Poop deck Hoisted up Indonesian flag at day time Done Positive 1

14 DEDI BIN WARNA OS Main deck Assisted Boatswain lifted materials Done Positive 1

15 ELIK BUDIANTO FTR Engine room Cleaned aux boiler area floor Done Positive 1
Assisted 3/E maintenance and pressure test the
16 SUAIB MTM Engine room
fuel injection valve A/E for spare
Done Positive 1

17 CHULWAN NURFALLAH WIPER Engine room Assisted 4/E maintenance aux boiler Done Positive 1

18 MASRUDI C/Cook Galley Daily prepared a meal Done Positive 1

19 BOBY MANGONTO STWD Galley Assisted C/Cook prepared crew coffee time Done Positive 1

20 HARIANTO SULE TANAN STWD C deck House keeping in deck C passage Done Positive 1

TOTAL 20