TOTAL BIAYA
Err:509
Cumm
Harga Jumlah % for
Satuan Harga-Harga Major
(Rupiah) (Rupiah) Items
g h i
Err:509
No. Mata Perkiraan Harga
Uraian Satuan
Pembayaran Kuantitas Satuan
(Rupiah)
a b c d e
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509
REKAPITULASI
PERKIRAAN HARGA PEKERJAAN
Proyek / Bagpro :
No. Paket Kontrak :
Nama Paket :
Prop / Kab / Kodya :
1 Umum
2 Drainase
3 Pekerjaan Tanah
4 Pelebaran Perkerasan dan Bahu Jalan
5 Pekerasan Non Aspal
6 Perkerasan Aspal
7 Struktur
8 Pengembalian Kondisi dan Pekerjaan Minor
9 Pekerjaan Harian
10 Pekerjaan Pemeliharaan Rutin
( ............................. ) ( ............................. )
Jumlah Harga
Pekerjaan
(Rupiah)
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
…....................................
…....................................
Panitia Pelelangan
Ketua,
( ............................. )
ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : MOBILISASI
B. PERALATAN
Periksa lembar 1.2-2 260,300,000
C. FASILITAS KONTRAKTOR
1 Base Camp M2 150 50,000 7,500,000
2 Kantor M2 60 75,000 4,500,000
3 Barak M2 60 45,000 2,700,000
4 Bengkel M2 100 25,000 2,500,000
5 Gudang, dan lain-lain M2 100 25,000 2,500,000
6 ...................... .... 0 0 0
D. FASILITAS LABORATORIUM
1 Ruang Laboratorium (sesuai Gambar) M2 108 55,000 5,940,000
3 Bituminous Testing
Marshall Asphalt Test Set 1 20,000,000 20,000,000
Extraction Test, Centrifuge/Refflux Method Set 1 9,000,000 9,000,000
Specific Gravity for Coarse Aggregate Set 1 9,000,000 9,000,000
Specific Gravity for Fine Aggregate Set 1 9,000,000 9,000,000
Mix Air Viod Content (Accurate Method) Set 1 15,000,000 15,000,000
Core Drill Set 1 15,000,000 15,000,000
Metal Thermometer Set 1 1,000,000 1,000,000
Accessories and Tolls Set 1 5,000,000 5,000,000
Penetration Test Bln 6 1,000,000 6,000,000
Softening Point Set 1 6,000,000 6,000,000
Refusal Density Compactor Set 1 15,000,000 15,000,000
4 Concrete Testing
Slump Cone Set 1 500,000 500,000
Cylinder/Cube Mould for Compressive Strength Set 1 10,000,000 10,000,000
Beam Mould for Flexural Strength (RIGID) Set 1 10,000,000 10,000,000
Crushing Machine Set 1 50,000,000 50,000,000
E.II. LAIN-LAIN
1 Komunikasi Lapangan Lengkap Set 1 5,000,000 5,000,000
2 ...................... .... 0 0 0
3 ...................... .... 0 0 0
4 ...................... .... 0 0 0
5 ...................... .... 0 0 0
6 ...................... .... 0 0 0
Catatan :Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.
B. PERALATAN
SATUAN PENGUKURAN :
HARGA SATUAN :
I. Laboratory Building
1. Laboratory Building m2
V. Peralatan pendukung
1 Mobil Pick Up Unit
2 Komputer + Printer Set
3 Furniture Set
VI. Operasional
Teknisi Laboratorium Bln
Tenaga Kerja Terampil Bln
Catatan :
1. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (te
yang dibayar kontrak) dan biaya lain-lainnya.
2. Test luar adalah test ke lembaga pengujian yang disetujui oleh Konsultan Pengaw
TAS LABORATORIUM
Lump sum
Rp. 779,940,000.00
HARGA
VOLUME TOTAL KETERANGAN
SATUAN
11. Jarak rata-rata Base Camp ke lokasi pekerjaan ---> L= 8.73 Kilometer
7.45 Km = a C 7.45 Km = b
A B
5.0 Km = c
Base Camp ---------> D
20 ....................................
21 ....................................
22 ....................................
N F O R MAS I
ESTIMASI PEMBAGIAN BIAYA PE
SESUAI SPESIFIKASI BINA MARG
………………………
NO. JENIS PEKERJAAN
…………………………………………..
…………………………………………. 1 UMUM ( Divisi 1 )
……………………… 2 PEKERJAAN UTAMA (Divisi 2 s/d 7)
3 PEKERJAAN MINOR (Divisi 8)
4 PEKERJAAN PEMEL.RUTIN (Divisi 10)
5 PEKERJAAN HARIAN (Divisi 9)
r ( Leff = a + b )
meter
meter
eriode Pelaksanaan)
2)*b } / (a+b)
............
.............
..............
.............
.............
AGIAN BIAYA PEKERJAAN JALAN
IFIKASI BINA MARGA TAHUN 2010
4.00 Maksimum
A (Divisi 2 s/d 7) 80.00 Minimum
R (Divisi 8) 10.00 Maksimum
L.RUTIN (Divisi 10) 5.00 Maksimum
N (Divisi 9) 1.00 Maksimum
100.00
No Jenis Peralatan Satuan Harga
1 Helmet Buah -
2 Rompi Buah -
3 Sepatu Buah -
4 Dll Buah -
Total -
Koefesian jam 0
DAFTAR
HARGA DASAR SATUAN BAHAN
HARGA
No. U RAIAN KODE SATUAN SATUAN
( Rp.)
KETERANGAN
Base Camp
Base Camp
Base Camp
Base Camp
Lokasi Pekerjaan
Base Camp
Base Camp
Proses/Base Camp
Lokasi Pekerjaan
Base Camp
Borrow Pit/quarry
Quarry
Base Camp
Base Camp
Base Camp
Base Camp
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Pertamina
Pertamina
Pertamina
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Base Camp
Base Camp
Base Camp
Tidak tersedia
Lokasi Pekerjaan
Base Camp
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Hasil Proses
Base Camp
Base Camp
Base Camp
Base Camp
Base Camp
Base Camp
Lokasi Pekerjaan
Lokasi Pekerjaan
Pelabuhan terdekat
Lokasi Pekerjaan
Pelabuhan terdekat
Lokasi Pekerjaan
Pelabuhan terdekat
Base Camp
Base Camp
Base Camp
Base Camp
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Pelabuhan terdekat
Pelabuhan terdekat
Pelabuhan terdekat
Pelabuhan terdekat
Pelabuhan terdekat
Pelabuhan terdekat
Lokasi Pekerjaan
Lokasi Pekerjaan
Base Camp
Base Camp
Base Camp
Base Camp
Base Camp
Base Camp
Base Camp
Base Camp
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Base Camp
Base Camp
Base Camp
Base Camp
Base Camp
Base Camp
HARGA & JARAK RATA-RATA
DARI SUMBER BAHAN (QUARRY)
HARGA JARAK
No. U RAIAN SATUAN ROYALTY QUARRY
(Rp) ( Km )
Catatan : Harga Royalty sudah ditambah biaya retribusi sebesar Rp. 300,-/m3
7,45 km 7,45 km
PETA LOKASI QUARRY
Medan Kisaran Kisaran - Sp. Kawat
km 000+000 Km 158+000
5,00 km
10,00 km
ke Rantau Prapat
Catatan :
Patumbak - Medan = 10 km
Medan - Lokasi Proyek = 165.20 km
Total Sumber Quarry Patumbak s/d Lokasi Proyek = 175.20 km
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi Base Camp L 20.00 Km
4 Harga satuan pasir di Quarry RpM01 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Berat volume pasir Bil 1.42 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 41.6826 M3 / Jam
Ts1
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Pekerjaan L 20.00 Km
4 Harga satuan batu kali di Quarry RpM02 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Berat volume batu kali Bil 1.44 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.75 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.75 menit
- Lain-lain T2 0.50 menit
Ts1 1.25 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 27.7884 M3 / Jam
Ts1
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Pekerjaan L 25.00 Km
4 Harga satuan batu kali di Quarry RpM06 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Harga Satuan Dasar Wheel Loader RpE15 1.00 Jam
8 Harga Satuan Upah Pekerja RpL01 1.00 Jam
9 Berat volume batu belah Bil 1.60 ton/m3
3.d PEKERJA
Biaya Pekerja / M3 =
{ (7 Jam x P) : Qt } x RpL01 Rp4 5,783.50 Rupiah
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Pekerjaan L 25.00 Km
4 Harga satuan Gravel di Quarry RpM07 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Berat volume gravel Bil 2.20 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.75 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.75 menit
- Lain-lain T2 0.50 menit
Ts1 1.25 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 27.7884 M3 / Jam
Ts1
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi Base Camp L 15.00 Km
4 Harga satuan Sirtu di Quarry RpM16 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Berat volume sirtu Bil 1.51 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 41.6826 M3 / Jam
Ts1
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi pekerjaan L 15.00 Km
4 Harga satuan pasir urug di Quarry RpM44 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Berat volume pasir urug Bil 1.42 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 41.6826 M3 / Jam
Ts1
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi pekerjaan L 7.00 Km
4 Harga satuan pasir urug di Quarry RpM44 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Berat isi volume pasir beton Bil 1.69 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.50 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 22.41 M3 / Jam
Ts1
KET.
Ke Base Camp
Ke Lokasi Pek.
Ke Lokasi Pek.
Ke Lokasi Pek.
Ke Base Camp
Ke Base Camp
Ke Lokasi Pek.
Ke Lokasi Pek.
Ke Lokasi Pek.
Ke Lokasi Pek.
7,45 km
ke Tanjung
Balai
ke Rantau Prapat
atangsiantar
HAN
HARGA
SATUAN
(Rp.)
125,750.00
251,312.02
346,160.02
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
HAN
HARGA
SATUAN
(Rp.)
119,500.00
251,312.02
346,160.02
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
HAN
HARGA
SATUAN
(Rp.)
97,000.00
251,312.02
346,160.02
189,744.02
10,714.29
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
HAN
HARGA
SATUAN
(Rp.)
83,000.00
251,312.02
346,160.02
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
HAN
HARGA
SATUAN
(Rp.)
37,500.00
251,312.02
346,160.02
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
HAN
HARGA
SATUAN
(Rp.)
112,000.00
251,312.02
346,160.02
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
HAN
HARGA
SATUAN
(Rp.)
120,000.00
251,312.02
346,160.02
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
Formulir Penentuan Harga Bahan
Bahan : Semen
2 Handling - - -
Bahan : Aspal
4,503,014.09
177,696.03
43,227.92
287,920.02
129,840.02
70,800.05
259,632.02
196,400.02
346,160.02
251,312.02
346,160.02
329,520.02
254,640.02
146,480.02
189,744.02
121,520.02
166,448.02
197,232.02
166,448.02
41,220.05
408,937.17
46,640.03
196,400.02
44,643.23
39,588.05
30,000.02
733,800.05
196,400.02
321,200.02
71,600.02
238,000.02
96,560.02
279,600.02
38,320.02
361,714.31
468,386.31
65,914.31
1,553,314.31
721,314.31
290,314.34
247,074.31
230,434.31
329,074.31
538,274.31
374,960.02
346,160.02
63,280.04
38,568.05
396,080.02
285,000.03
362,800.02
132,000.02
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan TRONTON
2. Tenaga Pw 150.0 HP
3. Kapasitas Cp 15.0 Ton
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 100 Rupiah
5.
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 17,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,857.14 Rp./Jam
4. Bahan Bakar Bensin Mb 7,600.00 Liter
5. Bahan Bakar Solar Ms 7,200.00 Liter
6. Minyak Pelumas Mp 32,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan COLD MILLING MACHINE
2. Tenaga Pw 248.0 HP
3. Kapasitas Cp 1,000 m
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 100 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 17,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,857.14 Rp./Jam
4. Bahan Bakar Bensin Mb 7,600.00 Liter
5. Bahan Bakar Solar Ms 7,200.00 Liter
6. Minyak Pelumas Mp 32,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan ROCK DRILL BREAKER
2. Tenaga Pw 5.0 HP
3. Kapasitas Cp - -
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 100 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 17,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,857.14 Rp./Jam
4. Bahan Bakar Bensin Mb 7,600.00 Liter
5. Bahan Bakar Solar Ms 7,200.00 Liter
6. Minyak Pelumas Mp 32,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan COLD RECYCLER
2. Tenaga Pw 900.0 HP
3. Kapasitas Cp 2,200 M
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 100 Rupiah
5.
A. URAIAN PERALATAN
1. Jenis Peralatan HOT RECYCLER
2. Tenaga Pw 400.0 HP
3. Kapasitas Cp 3 M
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 100 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 17,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,857.14 Rp./Jam
4. Bahan Bakar Bensin Mb 7,600.00 Liter
5. Bahan Bakar Solar Ms 7,200.00 Liter
6. Minyak Pelumas Mp 32,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan AGGREGAT (CHIP) SPREADER
2. Tenaga Pw 115.0 HP
3. Kapasitas Cp 3.5 M
4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam
c. Harga Alat B 100.0 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 17,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,857.14 Rp./Jam
4. Bahan Bakar Bensin Mb 7,600.00 Liter
5. Bahan Bakar Solar Ms 7,200.00 Liter
6. Minyak Pelumas Mp 32,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT DISTRIBUTOR
2. Tenaga Pw 115 HP
3. Kapasitas Cp 4,000 Liter
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 100 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 17,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,857.14 Rp./Jam
4. Bahan Bakar Bensin Mb 7,600.00 Liter
5. Bahan Bakar Solar Ms 7,200.00 Liter
6. Minyak Pelumas Mp 32,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan SLIP FORM PAVER
2. Tenaga Pw 105 HP
3. Kapasitas Cp 2.50 M3
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 100 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 17,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,857.14 Rp./Jam
4. Bahan Bakar Bensin Mb 7,600.00 Liter
5. Bahan Bakar Solar Ms 7,200.00 Liter
6. Minyak Pelumas Mp 32,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE PAN MIXER
2. Tenaga Pw 134 HP
3. Kapasitas Cp 600.00 Liter
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 100 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 17,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,857.14 Rp./Jam
4. Bahan Bakar Bensin Mb 7,600.00 Liter
5. Bahan Bakar Solar Ms 7,200.00 Liter
6. Minyak Pelumas Mp 32,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE BREAKER
2. Tenaga Pw 290 HP
3. Kapasitas Cp 20.00 m3/jam
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 100 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 17,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,857.14 Rp./Jam
4. Bahan Bakar Bensin Mb 7,600.00 Liter
5. Bahan Bakar Solar Ms 7,200.00 Liter
6. Minyak Pelumas Mp 32,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan ASPAHLT TANKER
2. Tenaga Pw 190 HP
3. Kapasitas Cp 4,000.00 liter
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 100 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 17,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,857.14 Rp./Jam
4. Bahan Bakar Bensin Mb 7,600.00 Liter
5. Bahan Bakar Solar Ms 7,200.00 Liter
6. Minyak Pelumas Mp 32,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan CEMENT TANKER
2. Tenaga Pw 190 HP
3. Kapasitas Cp 4,000.00 liter
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 100 Rupiah
B. BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 10 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 17,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,857.14 Rp./Jam
4. Bahan Bakar Bensin Mb 7,600.00 Liter
5. Bahan Bakar Solar Ms 7,200.00 Liter
6. Minyak Pelumas Mp 32,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan CONDRETE MIXER (350)
2. Tenaga Pw 20 HP
3. Kapasitas Cp 350.00 liter
4. Alat Baru : a. Umur Ekonomis A 2.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 100 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 17,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,857.14 Rp./Jam
4. Bahan Bakar Bensin Mb 7,600.00 Liter
5. Bahan Bakar Solar Ms 7,200.00 Liter
6. Minyak Pelumas Mp 32,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan VIBRATING RAMMER
2. Tenaga Pw 4 HP
3. Kapasitas Cp 80.00 KG
4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam
c. Harga Alat B 100 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 17,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,857.14 Rp./Jam
4. Bahan Bakar Bensin Mb 7,600.00 Liter
5. Bahan Bakar Solar Ms 7,200.00 Liter
6. Minyak Pelumas Mp 32,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 17,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,857.14 Rp./Jam
4. Bahan Bakar Bensin Mb 7,600.00 Liter
5. Bahan Bakar Solar Ms 7,200.00 Liter
6. Minyak Pelumas Mp 32,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan BORE PILE MACHINE
2. Tenaga Pw 125 HP
3. Kapasitas Cp 60.00 CM
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 100 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 17,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,857.14 Rp./Jam
4. Bahan Bakar Bensin Mb 7,600.00 Liter
5. Bahan Bakar Solar Ms 7,200.00 Liter
6. Minyak Pelumas Mp 32,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan CRANE ON TRACK 75-100 TON
2. Tenaga Pw 200 HP
3. Kapasitas Cp 75.00 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 100 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 17,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,857.14 Rp./Jam
4. Bahan Bakar Bensin Mb 7,600.00 Liter
5. Bahan Bakar Solar Ms 7,200.00 Liter
6. Minyak Pelumas Mp 32,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan BLENDING EQUIPMENT
2. Tenaga Pw 50 HP
3. Kapasitas Cp 30.00 Ton
4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 100 Rupiah
A. URAIAN PERALATAN
1. Jenis Peralatan BATCHING PLANT
2. Tenaga Pw 150 HP
3. Kapasitas Cp 30.00 Ton/jam
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 675,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 17,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,857.14 Rp./Jam
4. Bahan Bakar Bensin Mb 7,600.00 Liter
5. Bahan Bakar Solar Ms 7,200.00 Liter
6. Minyak Pelumas Mp 32,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan SCREED PAVER
2. Tenaga Pw 90 HP
3. Kapasitas Cp 2.50 M
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,600.0 Jam
c. Harga Alat B 525,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 17,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,857.14 Rp./Jam
4. Bahan Bakar Bensin Mb 7,600.00 Liter
5. Bahan Bakar Solar Ms 7,200.00 Liter
6. Minyak Pelumas Mp 32,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan VIBRATORY ROLLER 18-20 T.
2. Tenaga Pw 140.0 HP
3. Kapasitas Cp 20.000 Ton
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,666.7 Jam
c. Harga Alat B 100 Rupiah
B. BIAYA PASTI PER JAM KERJA BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 10 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 17,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,857.14 Rp./Jam
4. Bahan Bakar Bensin Mb 7,600.00 Liter
5. Bahan Bakar Solar Ms 7,200.00 Liter
6. Minyak Pelumas Mp 32,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A. URAIAN PERALATAN
1. Jenis Peralatan MOBIL PICK UP
2. Tenaga Pw 15.0 HP
3. Kapasitas Cp 2.000 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 125,000,000 Rupiah
B. BIAYA PASTI PER JAM KERJA BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 12,500,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 17,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,857.14 Rp./Jam
4. Bahan Bakar Bensin Mb 7,600.00 Liter
5. Bahan Bakar Solar Ms 7,200.00 Liter
6. Minyak Pelumas Mp 32,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Tabel-tabel di bawah ini
KET.
Merupakan acuan untuk
HARGA
ALAT
E35
UE'
###
E35
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
HARGA
KET.
BARU
Depresiasi
E36
E38
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
E40
###
###
###
###
###
###
###
###
###
###
###
###
###
Kondisi Alat
Nilai B' dari
KET.
###
E41
E37
###
###
###
###
###
###
###
###
###
###
###
###
###
Kondisi Alat
Nilai B' dari
Depresiasi
###
E42
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Kondisi Alat
Nilai B' dari
Depresiasi
###
E43
###
###
###
###
###
###
###
###
###
###
###
###
###
Kondisi Alat
###
KET.
###
###
###
E38
###
###
###
###
###
###
###
###
###
###
Kondisi Alat
Nilai B' dari
Depresiasi
###
E45
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Kondisi Alat
Nilai B' dari
Depresiasi
###
E46
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Kondisi Alat
Nilai B' dari
Depresiasi
E47
###
KET.
###
###
###
E39
###
###
###
###
###
###
###
###
Kondisi Alat
Nilai B' dari
Depresiasi
###
E48
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Kondisi Alat
Nilai B' dari
Depresiasi
###
E49
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Kondisi Alat
Nilai B' dari
Depresiasi
###
E50
###
###
KET.
###
###
###
E40
###
###
###
###
###
###
Kondisi Alat
Nilai B' dari
Depresiasi
###
E51
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Kondisi Alat
Nilai B' dari
Depresiasi
###
E
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Kondisi Alat
Nilai B' dari
Depresiasi
###
E
###
###
###
###
KET.
###
###
###
E41
###
###
###
> 15th ?
Kondisi Alat
Nilai B' dari
Depresiasi
###
E
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Kondisi Alat
Nilai B' dari
Depresiasi
###
E
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Kondisi Alat
Nilai B' dari
Depresiasi
###
E
###
###
###
###
###
###
KET.
###
###
###
E42
###
> 15th ?
Kondisi Alat
Nilai B' dari
Depresiasi
###
E
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Kondisi Alat
Nilai B' dari
Depresiasi
###
E
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Kondisi Alat
Nilai B' dari
Depresiasi
###
E
###
###
###
###
###
###
###
###
KET.
###
###
###
E43
Kondisi Alat
Nilai B' dari
Depresiasi
###
E
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Kondisi Alat
Nilai B' dari
Depresiasi
###
E
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Kondisi Alat
Nilai B' dari
Depresiasi
###
E
###
###
###
###
###
###
###
###
###
###
KET.
###
> 15th ?
Kondisi Alat
E44
Depresiasi
###
E
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Kondisi Alat
Nilai B' dari
Depresiasi
###
E
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Kondisi Alat
Nilai B' dari
Depresiasi
###
E
###
###
###
###
###
###
###
###
###
###
###
###
KET.
Kondisi Alat
Nilai B' dari
Depresiasi
E45
###
E
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Kondisi Alat
Nilai B' dari
Depresiasi
###
E
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Kondisi Alat
Nilai B' dari
Depresiasi
###
E
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Kondisi Alat
KET.
Depresiasi
###
E46
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Kondisi Alat
Nilai B' dari
Depresiasi
###
E
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Kondisi Alat
Nilai B' dari
Depresiasi
###
###
###
###
###
###
###
###
###
###
###
E
###
###
###
###
###
KET.
###
###
###
E47
###
###
> 15th ?
Kondisi Alat
Nilai B' dari
Depresiasi
KET.
E48
KET.
E49
KET.
E50
KET.
E51
KET.
E52
KET.
E53
KET.
E54
KET.
E-55
KET.
E-57
ITEM PEMBAYARAN : AGREGAT KASAR & HALUS
JENIS PEKERJAAN : PENGADAAN AGREGAT KASAR & HALUS
SATUAN PEMBAYARAN : M3
SATUAN KETERANGAN
%
Rupiah per 1 M3
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : AGREGAT KELAS A (kondisi lepas) :
JENIS PEKERJAAN : PENGADAAN AGREGAT KELAS A :
SATUAN PEMBAYARAN : M3 :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) jam 0.0315 189,744.02
2. Blending Equpment (E52) jam 0.0482 132,000.02
3 Alat Bantu Ls 1.0000 0.00
JUMLAH
HARGA
(Rp.)
674.97
449.98
1,124.95
119,136.51
153,175.51
42,651.00
314,963.02
5,976.66
6,361.45
0.00
12,338.11
328,426.07
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : AGREGAT KELAS B (kondisi lepas) :
JENIS PEKERJAAN : PENGADAAN AGREGAT KELAS B :
SATUAN PEMBAYARAN : M3 :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) jam 0.0315 189,744.02
2. Blending Equpment (E52) jam 0.0482 132,000.02
3 Alat Bantu Ls 1.0000 0.00
JUMLAH
HARGA
(Rp.)
674.97
449.98
1,124.95
85,097.51
153,175.51
41,989.50
280,262.51
5,976.66
6,361.45
0.00
12,338.11
293,725.57
ITEM PEMBAYARAN : AGREGAT KELAS S
JENIS PEKERJAAN : PENGADAAN AGREGAT KELAS S
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUA
I ASUMSI
1 Bahan Agregat Kasar, Pasir dan Tanah diterima di lokasi
Base Camp
2 Kegiatan dilakukan di dalam lokasi Base Camp
3 Proporsi campuran : - Agregat Kasar Ak 35.00 %
- Pasir Ps 65.00 %
II METHODE PELAKSANAAN
KETERANGAN
Kap. Bucket
Di luar PPN
DAFTAR KUANTITAS DAN HARGA
SPESIFIKASI KHUSUS PEMELIHARAAN KINERJA JALAN
PPK/Satker : ………………………………………………………….
No. Paket : ………………………………………………………….
Nama Paket : ………………………………………………………….
Propinsi : ………………………………………………………….
a b c d
Harga Jumlah
Satuan Harga-Harga
(Rupiah) (Rupiah)
e f = (d x e)
47,367.13
100,114.82
758,719.14
531,697.92
482,909.78
506,622.93
480,447.04
732,249.63
651,523.06
2,530,026.07
2,063,916.73
1,760,730.68
11,651.89
1,783,127.32
1,208,419.80
814,693.91
-
-
29,895.80
88,803.00
ITEM PEMBAYARAN NO. : Skh.1.10.1.(1) Analisa Skh-1
JENIS PEKERJAAN : Galian Tanah untuk saluran air dan lereng
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SA
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Berat volume bahan D 1.60 Ton/M3
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 1.00 -
Faktor Efisiensi alat Fa 0.83 -
Berlanjut ke halaman
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 91.89 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 643.25 M3
Kebutuhan tenaga :
- Pekerja P 8.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0871 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0109 Jam
Rp. 47,367.13 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara mekanis
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Tebal hamparan padat t 0.15 M
7 Berat volume bahan (lepas) D 1.60 Ton/M3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas Bucket V 1.50 M3
Faktor Bucket Fb 0.85 -
Faktor Efisiensi Alat Fa 0.83 -
Waktu sklus Ts1
- Muat T1 0.50 menit
Ts1 0.50 menit
Berlanjut ke halaman
3. TENAGA
Produksi menentukan : DUMP TRUCK Q1 8.66 M3/Jam
Produksi Timbunan / hari = Tk x Q1 Qt 60.62 M3
Kebutuhan tenaga :
- Pekerja P 4.00 orang
- Mandor M 0.50 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.4619 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0577 Jam
Berlanjut ke halaman
I. ASUMSI
1 Perbaikan pasangan batu dengan alat bantu
2 Lokasi pekerjaan : sepanjang jalan dalam kontrak
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Perbandingan Pasir & Semen : - Volume Semen Sm 20 %
: - Volume Pasir Ps 80 %
7 Perbandingan Batu & Mortar :
- Batu Bt 60 %
- Mortar (campuran semen & pasir) Mr 40 %
8 Berat Jenis Bahan :
- Pasangan Batu Dengan Mortar D1 2.40 ton/M3
- Batu D2 1.60 ton/M3
- Adukan (mortar) D3 1.80 ton/M3
- Pasir D4 1.67 ton/M3
- Semen Portland D5 1.44 ton/M3
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00 Liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4)
- Memuat T1 5.00 menit
- Mengaduk T2 3.00 menit
- Menuang T3 1.00 menit
- Menunggu, dll. T4 1.00 menit
Ts1 10.00 menit
Berlanjut ke halaman
3. TENAGA
Produksi Pas. Batu yang menentukan ( Prod. C. Mixer ) Q1 2.49 M3/Jam
Produksi Pasangan Batu dalam 1 hari = Tk x Q1 Qt 17.43 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.5006 jam
- Tukang = (Tk x Tb) : Qt (L02) 1.5017 jam
- Pekerja = (Tk x P) : Qt (L01) 6.0069 jam
Rp. 758,719.14 / M3
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : setempat2 atau menerus di sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 KM
5 Tebal lapis agregat padat t 0.15 M
6 Berat isi padat Bip 1.81 -
7 Jam kerja efektif per-hari Tk 7.00 jam
8 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 28.00 %
- Agregat Pecah Mesin 5 - 10 & 10 - 2 5-10&10-20 42.00 %
- Pasir Urug PU 30.00 %
9 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
Faktor kehilangan - Agregat A Fh 1.05
1. BAHAN
- Agregat Klas A = 1 M3 x (Bip/Bil) x Fh (M26) ### M3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus :
- Memuat dan lain-lain Ts1 0.45 menit
Berlanjut ke halaman
TENAGA
Produksi menentukan : WHEEL LOADER Q1 141.10 M3/jam
Produksi agregat / hari = Tk x Q1 Qt 987.70 M3
Kebutuhan tenaga :
- Pekerja P 15.00 orang
- Mandor M 2.00 orang
3. Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.1063 jam
- Mandor = (Tk x M) : Qt (L03) 0.0142 jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : setempat2 di sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 KM
5 Tebal lapis agregat padat t 0.15 M
6 Berat isi padat Bip 1.81 -
7 Jam kerja efektif per-hari Tk 7.00 jam
8 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 18.00 %
- Agregat Pecah Mesin 5 - 10 & 10 - 2 5-10&10-20 18.00 %
- Sirtu St 64.00 %
9 Berat volume agregat (lepas) Bil 1.51
- Agregat B Fh 1.05
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus : Ts1
- Memuat dan lain-lain T1 0.50 menit
Berlanjut ke halaman
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 126.99 M3/jam
Produksi agregat / hari = Tk x Q1 Qt 888.93 M3
Kebutuhan tenaga :
- Pekerja P 15.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.1181 jam
- Mandor = (Tk x M) : Qt (L03) 0.0079 jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : setempat2 di sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.73 KM
5 Tebal lapis agregat padat t 0.15 M
6 Berat isi padat Bip 1.81 -
7 Jam kerja efektif per-hari Tk 7.00 jam
8 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 18.00 %
- Agregat Pecah Mesin 5 - 10 & 10 - 2 5-10&10-20 18.00 %
- Sirtu St 64.00 %
9 Berat volume agregat (lepas) Bil 1.51
- Agregat B Fh 1.05
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus : Ts1
- Memuat dan lain-lain T1 0.50 menit
Berlanjut ke halaman
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 126.99 M3/jam
Produksi agregat / hari = Tk x Q1 Qt 888.93 M3
Kebutuhan tenaga :
- Pekerja P 12.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0945 jam
- Mandor = (Tk x M) : Qt (L03) 0.0079 jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7 KM
5 Tebal lapis Agregat padat t 0.15 M
6 Berat isi padat Bip 1.81 -
7 Jam kerja efektif per-hari Tk 7.00 Jam
8 Berat volume agregat (lepas) Bil 1.51
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Muat T1 1.00 menit
Berlanjut ke halaman
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 52.97 M3 / Jam
Produksi Agregat / hari = Tk x Q1 Qt 370.80 M3
Kebutuhan tenaga :
- Pekerja P 12.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.2265 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0189 Jam
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar CTB (agregat, semen dan air) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 KM
5 Jam kerja efektif per-hari Tk 7.0 jam
6 Tebal Lapis CTB t 0.25 m
7 Kadar Semen Minimum (Spesifikasi) Ks 110.00 Kg/M3
8 Ukuran Agregat Maksimum Ag 37 mm
9 Berat isi padat Bip 1.81 -
10 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
11 Perbandingan Camp. : Semen Sm 7.0 Kg/M3
: Agregat Kasar Kr 93.0 Kg/M3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus Ts1
- Muat T1 0.55 menit
- Lain lain T2 1.00 menit
Ts1 1.55 menit
Berlanjut ke hal. b
Berlanjut ke hal. b
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q2 Qt 92.96 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1506 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.3012 jam
- Pekerja = (Tk x P) : Qt (L01) 1.0542 jam
Rp. 732,249.63 / M3
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar CTSB (agregat, semen dan air) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 KM
5 Jam kerja efektif per-hari Tk 7.0 jam
6 Tebal Lapis CTSB t 0.25 m
7 Kadar Semen Minimum (Spesifikasi) Ks 85.00 Kg/M3
8 Ukuran Agregat Maksimum Ag 37 mm
9 Berat isi padat Bip 1.81 -
10 Berat Isi Agregat (lepas) Bil 1.51 ton/m3
11 Perbandingan Camp. : Semen Sm 6.0 Kg/M3
: Agregat Kasar Kr 94.0 Kg/M3
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus Ts1
- Muat T1 0.55 menit
- Lain lain T2 1.00 menit
Ts1 1.55 menit
Berlanjut ke hal. b
ITEM PEMBAYARAN NO. : SKh.1.10.1.(9) Analisa Skh-
JENIS PEKERJAAN : Lapis Pondasi Agregat Semen Kelas B (CTSB)
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SA
Berlanjut ke hal. b
ITEM PEMBAYARAN NO. : SKh.1.10.1.(9)
JENIS PEKERJAAN : Lapis Pondasi Agregat Semen Kelas B (CTSB)
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SA
No. U RAIAN KODE KOEF. SATUAN
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q2 Qt 92.96 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1506 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.3012 jam
- Pekerja = (Tk x P) : Qt (L01) 1.0542 jam
Rp. 651,523.06 / M3
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7 KM
5 Tebal Lapis Hotmix padat untuk patching t 0.05 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilangan material : - Agregat Fh1 1.10 -
- Aspal Fh2 1.05 -
8 Komposisi campuran AC - BC :
- Coarse Agregat CA 55.70 %
- Fine Agregat FA 37.50 %
- Fraksi Filler FF 1.00 %
- Asphalt minimum 6 % As 5.80 %
9 Berat jenis bahan :
,- AC-BC D1 2.30 ton / M3
- Coarse Agregat & Fine Agregat D2 1.80 ton / M3
- Fraksi Filler D3 2.00 ton / M3
- Asphalt D4 1.03 ton / M3
10 Jarak stock pile ke cold bin l 100.00 m
11 Faktor kembang Fk 1.20
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Kecepatan maju (ke bin) Vf 15.00 km/jam
Kecepatan kembali (ke stock pile) Vr 20.00 km/jam
Waktu Siklus Ts1
- Muat = l x 60 + l x 60 T1 0.70 menit
- Lain lain 1000 x Vf 1000 x Vr T2 0.75 menit
Ts1 1.45 menit
Berlanjut ke halaman
3. TENAGA
Produksi menentukan : AMP Q6 18.04 M3 / Jam
Produksi ATB / hari = Tk x Q6 Qt 126.30 M3
Kebutuhan tenaga :
- Pekerja P 14.00 orang
- Mandor M 2.00 orang
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 0.7759 Jam
- Mandor = (Tk x M) / Qt (L03) 0.1108 Jam
Berlanjut ke halaman
I. ASUMSI
1 Menggunakan buruh dan alat (semi mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 KM
4 Jam kerja efektif per-hari Tk 7.00 jam
5 Batasan Spesifikasi :
- Ukuran Agregat Nominal Maksimum Sa 19.00 MM
- Kadar Aspal terhadap berat total campuran As 7.00 %
- Tebal nominal padat untuk patching t 0.04 M
6 Berat Jenis Bahan :
- Campuran Aspal Dingin (diambil) D1 2.01 Ton/M3
- Aspal (diambil) D2 1.00 Ton/M3
- Agregat (diambil) D3 1.60 Ton/M3
7 Faktor kembang campuran Fk 1.20
1. BAHAN
1.a. Agregat Halus = {(100% - As) x 1M3 x D1} : D3 (M04) 1.1683 M3
1.b. Aspal Emulsi = {As x 1M3 x D1} x 1000 (M31) 140.700 Kg
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : Ts1
- Memuat T1 0.50 menit
- Mengaduk T2 1.00 menit
- Menuang T3 0.30 menit
- Tunggu, dll. T4 0.20 menit
Ts1 2.00 menit
Berlanjut ke halaman
3. TENAGA
Produksi menentukan (Produksi Concrete Mixer) Q1 10.375 M3/Jam
Produksi Campuran dalam 1 hari = Tk x Q1 Qt 72.63 M3
Kebutuhan tenaga : - Mandor M 2.00 orang
- Pekerja P 12.00 orang
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1928 jam
- Pekerja = (Tk x P) : Qt (L01) 1.1566 jam
Rp. 2,063,916.73 / M3
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7 KM
5 Tebal rata2 Lapen t 0.055 M
6 Jam kerja efektif per-hari Tk 7.00 Jam
7 Faktor kehilanganmaterial : - Agregat Fh1 1.10 -
- Aspal Fh2 1.05 -
8 Komposisi campuran Lapen (spesifikasi) :
- Agregat Pokok Ak 133.00 Kg/M2
- Agregat Pengunci Ap 25.00 Kg/M2
- Aspal : - Paska Agregat Pokok As1 5.20 Kg/M2
As2 94.55 Kg/M3
9 Berat jenis bahan :
- Agregat D1 1.80 ton / M3
- Aspal D2 1.01 ton / M3
1. BAHAN
1.a. Agregat Kasar = {(Ak/1000 : t M3) x Fh1} : D1 (M03) 1.4778 M3
1.b. Agregat Pengunci = {(Ap/1000 : t M3) x Fh1} : D1 (M04) 0.2778 M3
1.c. Aspal = {(As : t M3) x Fh2} (M10) 99.2727 Kg
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus Ts1
- Memuat, menuang, kembali T1 0.45 menit
Berlanjut ke halaman
3. TENAGA
Produksi menentukan (Produksi Wheel Loader) Q1 117.58 M3/Jam
Produksi Lapen / hari = Q1 x Tk Qt 823.08 M3
Kebutuhan tenaga :
- Pekerja P 18.00 orang
- Mandor M 2.00 orang
Koefisien Tenaga / M3 :
- Pekerja = (Tk x P) / Qt (L01) 0.1531 Jam
- Mandor = (Tk x M) / Qt (L03) 0.0170 Jam
Berlanjut ke halaman
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Jarak rata-rata Base Camp ke lokasi pekerjaan L 8.7 KM
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor kehilangan bahan Fh 1.10 -
6 Komposisi campuran :
- Aspal AC - 10 atau AC - 20 As 87.00 %
- Minyak Fluk / Pencair K 13.00 %
7 Berat jenis bahan :
- Aspal AC - 10 atau AC - 20 D1 1.03 Kg / Ltr
- Minyak Fluk / Minyak Tanah (Kerosene) D2 0.80 Kg / Ltr
8 Bahan dasar (aspal & minyak pencair) semuanya
diterima dilokasi pekerjaan
1. BAHAN
Untuk mendapatkan 1 liter Lapis resap Pengikat
diperlukan : (1 liter x Fh) Pc 1.10 liter
Berlanjut ke halaman
3. TENAGA
Produksi menentukan : ASPHALT SPRAYER Q1 3,012.90 liter
Produksi / hari = Tk x Q1 Qt 21,090.30 liter
Kebutuhan tenaga :
- Pekerja P 8.00 orang
- Mandor M 1.00 orang
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 KM
5 Jam kerja efektif per-hari Tk 7.0 jam
6 Tebal Lapis perkerasan beton padat t 0.30 m
7 Kadar Semen Minimum (Spesifikasi) Ks 365 Kg/M3
8 Ukuran Agregat Maksimum Ag 19 mm
9 Perbandingan Air/Semen Maksimum (Spesifikasi) Wcr 0.50 -
10 Perbandingan Camp. : Semen Sm 360.0 Kg/M3
: Pasir Ps 791.0 Kg/M3
: Agregat Kasar Kr 1,077.0 Kg/M3
11 Berat Jenis Material :
- Beton D1 2.20 T/M3
- Semen D2 1.25 T/M3
- Pasir D3 1.30 T/M3
- Agregat Kasar D4 1.40 T/M3
II. URUTAN KERJA
1 Semen, pasir, batu kerikil dan air dicampur dan diaduk
menjadi beton dengan menggunakan Batching Plant
2 Perkerasan beton lama yang rusak dibongkar & dibersihkan
3 Pemasangan bekesting dan tulangan anyaman tunggal
4 Beton di-cor ke dalam bekisting dengan manual/mekanik
5 Beton setelah setting langsung digrooving dengan merata
III. PEMAKAIAN BAHAN, ALAT DAN TENAGA
Bahan untuk 1 m2 perkerasan beton t = 30 cm
1. BAHAN
1.a. Semen (PC) = Sm x 1.025 (M12) 369.000 Kg
1.b. Pasir Beton = (Ps/1000 : D3) x 1.025 (M01a) 0.6237 M3
1.c. Agregat Kasar = (Kr/1000 : D4) x 1.025 (M03) 0.7885 M3
1.d. Baja Tulangan Polos (M39a) 45.0000 Kg
1.e. Joint Sealent (M94) 0.9900 Kg
1.f. Cat Anti Karat (M95) 0.0200 Kg
1.g. Expansion Cap (M96) 0.1700 M2
1.h. Polytene 125 mikron (M97) 0.3281 Kg
1.i. Curing Compound (M98) 0.6525 Ltr
1.j. Formwork Plate 0.5700 M2
1.l. Paku (M18) 0.350 Kg
1.m. Additive (M67a) 0.8568 Ltr
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.85 -
Faktor efisiensi alat Fa 0.83 -
Waktu Siklus Ts1
- Muat T1 0.55 menit
- Lain lain T2 1.00 menit
Ts1 1.55 menit
Berlanjut ke hal. b
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q2 Qt 139.44 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1004 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.2008 jam
- Pekerja = (Tk x P) : Qt (L01) 1.1044 jam
Rp. 1,783,127.32 / M2
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 KM
5 Jam kerja efektif per-hari Tk 7.0 jam
6 Tebal Lapis pondasi bawah beton kurus t 0.10 m
7 Kadar Semen Minimum (Spesifikasi) Ks 250 Kg/M3
8 Ukuran Agregat Maksimum Ag 19 mm
9 Perbandingan Air/Semen Maksimum (Spesifikasi) Wcr 0.60 -
10 Perbandingan Camp. : Semen Sm 280.0 Kg/M3
: Pasir Ps 633.0 Kg/M3
: Agregat Kasar Kr 1,207.0 Kg/M3
11 Berat Jenis Material :
- Beton D1 2.20 T/M3
- Semen D2 1.25 T/M3
- Pasir D3 1.30 T/M3
- Agregat Kasar D4 1.40 T/M3
Berlanjut ke hal. b
Berlanjut ke hal. b
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q2 Qt 139.44 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.1004 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.2008 jam
- Pekerja = (Tk x P) : Qt (L01) 1.0040 jam
Rp. 1,208,419.80 / M3
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.7 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Perbandingan Pasir & Semen : - Volume Semen Sm 25 %
: - Volume Pasir Ps 75 %
7 Perbandingan Batu & Mortar :
- Batu Bt 65 %
- Mortar (campuran semen & pasir) Mr 35 %
8 Berat Jenis Bahan :
- Pasangan Batu Dengan Mortar D1 2.40 ton/M3
- Batu D2 1.60 ton/M3
- Adukan (mortar) D3 1.80 ton/M3
- Pasir D4 1.30 ton/M3
- Semen Portland D5 1.44 ton/M3
1. BAHAN
1.a. Batu -----> {(Bt x D1 x 1 M3) : D2} x 1.20 (M02) 1.1700 M3
1.b. Semen ----> Sm x {(Mr x D1 x 1 M3} : D3} x 1.05 (M12) 0.1225 M3
x {D5 x (1000)} (M12) 176.00 Kg
1.c. Pasir -----> Ps x {(Mr x D1 x 1 M3) : D4} x 1.05 (M01) 0.5088 M3
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 8.00 menit
- Mengaduk T2 4.00 menit
- Menuang T3 3.00 menit
- Tunggu, dll. T4 2.00 menit
Ts 17.00 menit
Berlanjut ke hal. b
3. TENAGA
Produksi menetukan : Produksi Concrete Mxer Q1 1.465 M3/Jam
Produksi Pasangan Batu dengan Mortar / hari = Tk x Q1 Qt 10.25 M3
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Batu Tb 2.00 orang
- Pekerja P 8.00 orang
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.6827 jam
- Tukang = (Tk x Tb) : Qt (L02) 1.3655 jam
- Pekerja = (Tk x P) : Qt (L01) 5.4618 jam
Rp. 814,693.91 / M3
1 ASUMSI
a Memotong rumput/tanaman yang mempunyai ketinggian >10 Cm
dari permukaan tanah pada lokasi yang dijinkan
b Memotong tanaman liar pada lokasi yang tidak dijinkan yang
dilakukan dengan alat potong tanaman
c Dilaksanakan setiap saat selama periode pelaksanaan
d Asumsi 1 kali pemotongan rumput/tanaman dengan panjang jalan L 1,000.00 M
e Jam kerja efektif per hari Tk 7 jam
2 PERALATAN
- Flat Bed Truck dengan kapasitas efektif (E11) Vef 6.00 Ton
- Waktu siklus Ts 160.00 Menit
- Waktu tempuh T1 90.00 Menit
- Waktu tunggu dan lain - lain T2 70.00 Menit
Kapasitas produksi = (Vefx60)/(VpxTs) Q2 0.4500 Km/Jam
Koefisien Alat = 1 : Q2 (E11) 2.222 Jam
Rp. 3,694,232.83
1 ASUMSI
a Memotong rumput/tanaman yang mempunyai ketinggian >10 Cm
dari permukaan tanah pada lokasi yang dijinkan
b Memotong tanaman liar pada lokasi yang tidak dijinkan yang
dilakukan dengan alat potong tanaman
c Dilaksanakan setiap saat selama periode pelaksanaan
d Asumsi 1 kali pemotongan rumput/tanaman dengan panjang L 1,000.00 M
e Jam kerja efektif per hari Tk 7 jam
2 PERALATAN
a - Mobil Pick Up (E57) Vef 2.00 Ton
- Waktu siklus Ts 90.00 Menit
- Waktu tempuh T1 60.00 Menit
- Waktu tunggu dan lain - lain T2 30.00 Menit
Kapasitas produksi = (Vefx60)/(VpxTs) Q2 0.3333 Km/Jam
Koefisien Alat = 1 : Q2 (E11) 0.001 Jam
3. TENAGA
Volume pemotongan rumput : L x 4 meter Qt 4,000.00 M2
- Volume pembersihan dalam 1 Km Rumija Vp 4.00 Ton
Kebutuhan tenaga : - Mandor M 1.00 orang
- Pekerja P 12.00 orang
Koefisien Tenaga / M2 :
- Mandor = (Tk x M) : Qt (L03) 0.0018 jam
- Pekerja = (Tk x P) : Qt (L01) 0.0210 jam
Rp. 393.53
1 ASUMSI
a Pembersihan drainase dari endapan/sedimentasi dan benda
hanyutan yang menganggu aliran air drainase.
b Pembersihan dilaksanakan dengan cara manual dengan peralatan
sekop, cangkul dan sejenisnya, selama periode pelaksanaan
c Material hasil pembersihan dibuang pada lokasi yang ditentukan
dengan kendaraan flat bed truck
d Asumsi pembersihan drainase dengan panjang L 1,000.00 Ln.M
e Jam kerja efektif per hari Tk 7 jam
2 PERALATAN
a - Mobil Pick Up (E57) Vef 2.00 Ton
- Waktu siklus Ts 90.00 Menit
- Waktu tempuh T1 60.00 Menit
- Waktu tunggu dan lain - lain T2 30.00 Menit
Kapasitas produksi = (Vefx60)/(VpxTs) Q2 0.2222 Km/Jam
Koefisien Alat = 1 : Q2 (E11) 0.002 Jam
3. TENAGA
Volume pembersihan drainase 3 x L meter Qt 3,000.00 Ln.M
- Volume pembersihan dalam 1000 meter saluran samping Vp 6.00 Ton
Kebutuhan tenaga : - Mandor M 1.00 orang
- Pekerja P 12.00 orang
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.0023 jam
- Pekerja = (Tk x P) : Qt (L01) 0.0280 jam
Rp. 55,498.00
1 ASUMSI
a Pembersihan dan perbaikan rel pengaman termasuk pemasangan
kembali dengan benar dan kokoh
b Rel pengaman yang rusak dan tidak terpasang dengan benar,
diperbaiki dan dipasang kembali hingga berfungsi baik
c Rel pengaman yang kotor dibersihkan dan di cat kembali
apabila diperlukan
d Asumsi pembersihan dan perbaikan dengan panjang L 10.00 Ln.M
e Jam kerja efektif per hari Tk 7 jam
2 PEMAKAIAN BAHAN, ALAT DAN TENAGA
2a BAHAN
- Cat galvanis M95 1.00 Kg
- Baut dan perlengkapannya Bt 10.00 Unit
- Mortar (campuran semen & pasir) - Semen M12 15.00 Kg
- Pasir M01 0.12 M3
2b ALAT
- Alat bantu sekop, linggis dsb. 1.00 Ls
3. TENAGA
Volume pembersihan dan perbaikan rel pengaman Qt 10.00 Ln.M
Rp. 29,895.80
1 ASUMSI
a Pembersihan dan perbaikan patok/rambu termasuk pemasangan
kembali dengan benar dan kokoh
b Patok/Rambu yang rusak dan tidak terpasang dengan benar,
diperbaiki dan dipasang kembali hingga berfungsi baik
c Patok/Rambu yang kotor dibersihkan dan di cat kembali
apabila diperlukan
d Asumsi pembersihan dan perbaikan patok/rambu L 1.00 Buah
e Jam kerja efektif per hari Tk 7 jam
2b ALAT
- Alat bantu sekop, linggis dsb. 1.00 Ls
3. TENAGA
Volume pembersihan dan perbaikan patok/rambu Qt 1.00 Buah
Rp. 88,803.00
Analisa Skh-10.1.1
KETERANGAN
PROYEK :
No. PAKET KONTRAK
NAMA PAKET
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
JUMLAH HARGA TE
B. BAHAN
Faktor Konversi
masuk dalam
waktu siklus
disesuaikan dgn
lapangan
JUMLAH HARGA B
C. PERALATAN
Analisa Skh-10.1.1
KETERANGAN
Analisa Skh-10.1.2
KETERANGAN
PROYEK :
No. PAKET KONTRAK
NAMA PAKET
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
JUMLAH HARGA TE
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) Jam 0.0094
2. Dump Truck (E09) Jam 0.1155
3. Motor Grader (E13) Jam 0.0040
3. Tandem (E17) Jam 0.0161
4. Water Tanker (E23) Jam 0.0070
5. Alat Bantu Ls 1.0000
Analisa Skh-10.1.2
KETERANGAN
Panduan
Lump Sump
Analisa Skh-10.1.2
KETERANGAN
PROYEK :
No. PAKET KONTRAK
NAMA PAKET
A. TENAGA
JUMLAH HARGA TE
B. BAHAN
Lepas
JUMLAH HARGA B
C. PERALATAN
Analisa Skh-10.1.3
KETERANGAN
Analisa Skh-10.1.4
KETERANGAN
PROYEK :
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
MATA PEMBAYARAN NO. : SKh.1.10.1.(4)
JENIS PEKERJAAN : Lapis Pondasi Agregat Klas A
SATUAN PEMBAYARAN : M3
A. TENAGA
JUMLAH HARGA TE
B. BAHAN
JUMLAH HARGA B
C. PERALATAN
Analisa Skh-10.1.4
KETERANGAN
Lump Sum
Analisa Skh-10.1.5
KETERANGAN
PROYEK :
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
MATA PEMBAYARAN NO. : SKh.1.10.1.(5)
JENIS PEKERJAAN : Lapis Pondasi Agregat Klas B
SATUAN PEMBAYARAN : M3
A. TENAGA
JUMLAH HARGA TE
B. BAHAN
JUMLAH HARGA B
C. PERALATAN
Analisa Skh-10.1.5
KETERANGAN
Lump Sum
Analisa Skh-10.1.6
KETERANGAN
PROYEK :
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
MATA PEMBAYARAN NO. : SKh.1.10.1.(6)
JENIS PEKERJAAN : Lapis Pondasi Agregat Klas S
SATUAN PEMBAYARAN : M3
A. TENAGA
1. Pekerja Biasa (L01) jam 0.0945
2. Mandor (L03) jam 0.0079
JUMLAH HARGA TE
B. BAHAN
JUMLAH HARGA B
C. PERALATAN
Analisa Skh-10.1.6
KETERANGAN
Lump Sum
Analisa Skh-10.1.7
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO. : SKh.1.10.1.(7)
JENIS PEKERJAAN : Agregat Utk. Perkerasan Tanpa Penutup Asp
SATUAN PEMBAYARAN : M3
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
JUMLAH HARGA TE
B. BAHAN
JUMLAH HARGA B
C. PERALATAN
Analisa Skh-10.1.7
KETERANGAN
Lump Sum
Analisa Skh-10.1.8
FORMULIR STANDAR UNTUK
URAIAN ANALISA HARGA SATUAN PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KETERANGAN PROYEK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO. : SKh.1.10.1.(8)
JENIS PEKERJAAN : Lapis Pondasi Agregat Semen Kelas A
SATUAN PEMBAYARAN : M3
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
1. Pekerja (L01) jam 1.0542
Berdasarkan 2. Tukang (L02) jam 0.3012
JMF & sesuai 3. Mandor (L03) jam 0.1506
dgn Spesifikasi
JUMLAH HARGA TE
B. BAHAN
1. Semen (PC) = (M12) Kg 112.7500
JUMLAH HARGA B
C. PERALATAN
1 Wheel Loader E15 jam 0.0244
2 Batching Plant E53 jam 0.0753
3 Dump Truck E09 jam 0.1581
4 Vibrator Roller E55 jam 0.0065
5 Water Tank Truck E23 jam 0.0422
6 Screed Paver E54 jam 0.0127
7 Alat Bantu Ls 1.0000
8
Analisa Skh-10.1.8
KETERANGAN
945
Analisa Skh-10.1.8
KETERANGAN
Analisa Skh-10.1.9
FORMULIR STANDAR UNTUK
URAIAN ANALISA HARGA SATUAN PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KETERANGAN PROYEK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO. : SKh.1.10.1.(9)
JENIS PEKERJAAN : Lapis Pondasi Agregat Semen Kelas B
SATUAN PEMBAYARAN : M3
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
1. Pekerja (L01) jam 1.0542
Berdasarkan 2. Tukang (L02) jam 0.3012
JMF & sesuai 3. Mandor (L03) jam 0.1506
dgn Spesifikasi
JUMLAH HARGA TE
B. BAHAN
1. Semen (PC) = (M12) Kg 87.1250
C. PERALATAN
1 Wheel Loader E15 jam 0.0244
2 Batching Plant E53 jam 0.0753
3 Dump Truck E08 jam 0.1581
4 Vibrator Roller E55 jam 0.0065
5 Water Tank Truck E23 jam 0.0422
6 Screed Paver E54 jam 0.0096
7 Alat Bantu Ls 1.0000
8
KETERANGAN
945
KETERANGAN
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
Rata-rata
A. TENAGA
B. BAHAN
JUMLAH HARGA B
C. PERALATAN
1. Wheel Loader E15 Jam 0.0301
2. AMP E01 Jam 0.0554
3. Genset E12 Jam 0.0554
4. Dump Truck E09 Jam 0.4358
5. Pedestrian Roller E24 Jam 0.1580
6. Alat Bantu Ls 1.0000
JUMLAH HARGA PERA
Analisa Skh-10.1.10
KETERANGAN
Lump Sum
Analisa Skh-10.1.10
KETERANGAN
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK :
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO. : SKh.1.10.1.(11)
JENIS PEKERJAAN : Campuran Aspal Dingin
Analisa Skh-10.1.11 SATUAN PEMBAYARAN : M3
A. TENAGA
JUMLAH HARGA TE
Rata-rata B. BAHAN
diambil
JUMLAH HARGA B
C. PERALATAN
Analisa Skh-10.1.11
KETERANGAN
Melayani 1 buah
molen
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
JUMLAH HARGA B
C. PERALATAN
Analisa Skh-10.1.12
KETERANGAN
Lump Sum
Berlanjut ke halaman berikut
Analisa Skh-10.1.12
KETERANGAN
Analisa Skh-10.1.13
KETERANGAN
PROYEK :
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO. : SKh.1.10.1.(13)
JENIS PEKERJAAN : Residu Bitumen
SATUAN PEMBAYARAN : LITER
100 bagian
15 bagian PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
C. PERALATAN
1. Asphalt Sprayer E03 Jam 0.0003
2. Compresor E05 Jam 0.0003
3. Dump Truck E09 Jam 0.0003
Analisa Skh-10.1.13
KETERANGAN
Analisa Skh-10.1.14
FORMULIR STANDAR UNTUK
URAIAN ANALISA HARGA SATUAN PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KETERANGAN PROYEK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO. : SKh.1.10.1.(14)
JENIS PEKERJAAN : Perkerasan Beton Semen
SATUAN PEMBAYARAN : M3
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
Berdasarkan 1. Pekerja (L01) jam 1.1044
JMF & sesuai 2. Tukang (L02) jam 0.2008
dgn Spesifikasi 3. Mandor (L03) jam 0.1004
JUMLAH HARGA TE
B. BAHAN
1. Semen (M12) Kg 369.0000
2 Pasir (M01a) M3 0.6237
3 Agregat Kasar (M03) M3 0.7885
4 Baja Tulangan Polos (M39a) Kg 45.0000
5 Joint Sealent (M94) Kg 0.9900
6 Cat Anti Karat (M95) Kg 0.0200
7 Expansion Cap (M96) M2 0.1700
8 Polytene 125 mikron (M97) Kg 0.3281
9 Curing Compound (M98) Ltr 0.6525
10 Formwork Plate M2 0.5700
11 Paku (M18) Kg 0.3500
12 Additive (M67a) Ltr 0.8568
JUMLAH HARGA B
Lihat Gambar
C. PERALATAN
1 Wheel Loader E15 jam 0.0244
2 Batching Plant E43 jam 0.0502
3 Truck Mixer E49 jam 0.1952
4 Con. Vibrator E20 jam 0.0502
5 Water Tank Truck E23 jam 0.0422
6 Conc. Paver E42 jam 0.0032
7 Alat Bantu Ls 1.0000
Analisa Skh-10.1.14
KETERANGAN
945
Berlanjut ke hal. berikut.
Analisa Skh-10.1.14
KETERANGAN
Analisa Skh-10.1.15
FORMULIR STANDAR UNTUK
URAIAN ANALISA HARGA SATUAN PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KETERANGAN PROYEK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO. : SKh.1.10.1.(15)
JENIS PEKERJAAN : Lapis Pondasi Bawah Beton Kurus
SATUAN PEMBAYARAN : M3
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
Berdasarkan 1. Pekerja (L01) jam 1.0040
JMF & sesuai 2. Tukang (L02) jam 0.2008
dgn Spesifikasi 3. Mandor (L03) jam 0.1004
JUMLAH HARGA TE
B. BAHAN
1. Semen (M12) Kg 287.0000
2 Pasir (M01a) M3 0.4991
3 Agregat Kasar (M03) M3 0.8837
4 Multiplex 12 mm (M73) Lbr 0.1600
5 Kayu Acuan (M99) M3 0.0960
6 Paku (M18) Kg 0.2500
JUMLAH HARGA B
C. PERALATAN
1 Wheel Loader E15 jam 0.0165
2 Batching Plant E43 jam 0.0502
3 Truck Mixer E49 jam 0.1912
4 Con. Vibrator E20 jam 0.0502
5 Water Tank Truck E23 jam 0.0422
6 Conc. Paver E42 jam 0.0032
7 Alat Bantu Ls 1.0000
Analisa Skh-10.1.15
KETERANGAN
945
Analisa Skh-10.1.15
KETERANGAN
Analisa Skh-10.1.16
KETERANGAN
PROYEK :
No. PAKET KONTRAK
NAMA PAKET
A. TENAGA
JUMLAH HARGA TE
B. BAHAN
Lepas
JUMLAH HARGA B
C. PERALATAN
Analisa Skh-10.1.16
KETERANGAN
Analisa Skh-10.1.17
KETERANGAN
PROYEK
PAKET
NAMA KONTRAK
PROVINSI
ITEM PEMBAYARAN NO. : SKh.1.10.1.(17)
JENIS PEKERJAAN : Pengendalian Tanaman Pada Rumija
SATUAN PEMBAYARAN : LS (untuk setiap Kilometer)
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
C. PERALATAN
Analisa Skh-2.10.a(18)
KETERANGAN
PROYEK
PAKET
NAMA KONTRAK
PROVINSI
ITEM PEMBAYARAN NO. : SKh.2.10.a.(18)
JENIS PEKERJAAN : Pengendalian Tanaman
SATUAN PEMBAYARAN : M2
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
1. Pekerja jam 0.0210
2. Mandor jam 0.0018
B. BAHAN
C. PERALATAN
Analisa Skh-2.10.a(19)
KETERANGAN
PROYEK
PAKET
NAMA KONTRAK
PROVINSI
ITEM PEMBAYARAN NO. : SKh.2.10.a.(19)
JENIS PEKERJAAN : Pembersihan Drainase
SATUAN PEMBAYARAN : Ln.M.
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
C. PERALATAN
Analisa Skh-2.10.a(20a)
KETERANGAN
PROYEK
PAKET
NAMA KONTRAK
PROVINSI
ITEM PEMBAYARAN NO. : SKh.2.10.a.(20a)
JENIS PEKERJAAN : Pembersihan dan Perbaikan Rel Pengaman
SATUAN PEMBAYARAN : Ln.M.
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
1 Cat Galvanis Kg 1.0000
2 Baut dan perlengkapannya Unit 10.0000
3 Semen Kg 15.0000
4 Pasir M3 0.1200
C. PERALATAN
Analisa Skh-2.10.a(20b)
KETERANGAN
PROYEK
PAKET
NAMA KONTRAK
PROVINSI
ITEM PEMBAYARAN NO. : SKh.2.10.a.(20b)
JENIS PEKERJAAN : Pembersihan dan Perbaikan Patok/Rambu
SATUAN PEMBAYARAN Buah
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
1 Cat Galvanis Kg 0.3000
2 Baut dan perlengkapannya Unit 2.0000
3 Semen Kg 5.0000
4 Pasir M3 0.0200
C. PERALATAN
R UNTUK
ASING HARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,714.29 932.76
14,285.71 155.46
251,312.02 2,734.84
346,160.02 39,237.96
0.00 0.00
43,061.02
4,306.10
47,367.13
Kerja dan Peralatan, volume dan/atau ukuran
en untuk menyelesaikan satu satuan pekerjaan
kan Penyedia Jasa tidak dapat diubah kecuali
tentuan dalam Instruksi Kepada Peserta Lelang
bahan habis dipakai dan operator.
ajak yang berkaitan (tetapi tidak termasuk PPN
Analisa Skh-10.1.2
R UNTUK
ASING HARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,714.29 4,949.20
14,285.71 824.87
32,000.00 38,400.00
JUMLAH HARGA BAHAN 38,400.00
189,744.02 1,793.00
346,160.02 39,975.04
254,640.02 1,010.48
166,448.02 2,680.57
196,400.02 1,380.32
0.00 0.00
91,013.48
9,101.35
100,114.82
Kerja dan Peralatan, volume dan/atau ukuran
R UNTUK
ASING HARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,714.29 64,359.48
12,857.14 19,307.84
14,285.71 7,151.05
244,600.00 293,520.00
1,120.00 180,320.00
192,100.00 92,760.14
80,492.12 32,326.15
0.00 0.00
JUMLAH HARGA PERALATAN 32,326.15
689,744.67
68,974.47
758,719.14
R UNTUK
ASING HARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,714.29 1,139.01
14,285.71 202.49
328,426.07 413,360.10
189,744.02 1,344.75
346,160.02 62,203.41
44,643.23 2,351.35
196,400.02 2,760.64
0.00 0.00
483,361.75
48,336.17
531,697.92
Kerja dan Peralatan, volume dan/atau ukuran
R UNTUK
ASING HARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,714.29 1,265.57
14,285.71 112.49
293,725.57 369,685.72
189,744.02 1,494.17
346,160.02 61,338.95
44,643.23 2,351.35
196,400.02 2,760.64
0.00 0.00
439,008.89
43,900.89
482,909.78
Kerja dan Peralatan, volume dan/atau ukuran
en untuk menyelesaikan satu satuan pekerjaan
kan Penyedia Jasa tidak dapat diubah kecuali
tentuan dalam Instruksi Kepada Peserta Lelang
bahan habis dipakai dan operator.
ajak yang berkaitan (tetapi tidak termasuk PPN
Analisa Skh-10.1.6
R UNTUK
ASING HARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,714.29 1,012.45
14,285.71 112.49
311,054.63 391,496.25
189,744.02 1,494.17
346,160.02 61,338.95
44,643.23 2,351.35
196,400.02 2,760.64
0.00 0.00
460,566.30
46,056.63
506,622.93
Kerja dan Peralatan, volume dan/atau ukuran
R UNTUK
ASING HARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,714.29 2,427.21
14,285.71 269.69
311,054.63 373,265.56
189,744.02 3,582.04
346,160.02 50,930.42
44,643.23 2,351.35
196,400.02 3,943.78
0.00 0.00
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,714.29 11,295.18
12,857.14 3,872.63
14,285.71 2,151.46
1,120.00 126,280.00
328,426.07 413,360.10
189,744.02 4,631.91
469,115.99 35,325.00
346,160.02 54,717.07
262,960.03 1,712.54
196,400.02 8,281.93
317,948.74 4,053.66
0.00 0.00
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,714.29 11,295.18
12,857.14 3,872.63
14,285.71 2,151.46
1,120.00 97,580.00
293,725.57 369,685.72
JUMLAH HARGA BAHAN 467,265.72
189,744.02 4,631.91
469,115.99 35,325.00
346,160.02 54,717.07
262,960.03 1,712.54
196,400.02 8,281.93
317,948.74 3,040.24
0.00 0.00
Analisa Skh-10.1.10
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,714.29 8,313.25
14,285.71 1,583.48
324,180.97 253,799.48
324,180.97 170,870.39
1,100.00 27,830.00
9,600.00 1,411,905.60
189,744.02 5,719.66
4,503,014.09 249,564.64
329,520.02 18,262.56
346,160.02 150,840.27
44,643.23 7,054.04
0.00 0.00
JUMLAH HARGA PERALATAN 425,721.50
2,300,023.70
230,002.37
2,530,026.07
Kerja dan Peralatan, volume dan/atau ukuran
Analisa Skh-10.1.11
PERKIRAAN VOL. PEK. :
TOTAL HARGA :
% THD. BIAYA PROYEK :
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,714.29 12,392.43
14,285.71 2,753.87
324,180.97 378,744.68
9,500.00 1,336,650.00
70,800.05 6,824.10
44,643.23 8,817.54
346,160.02 130,105.30
0.00 0.00
1,876,287.93
187,628.79
2,063,916.73
Kerja dan Peralatan, volume dan/atau ukuran
Analisa Skh-10.1.12
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,714.29 1,640.17
14,285.71 242.99
JUMLAH HARGA TENAGA 1,883.16
324,180.97 569,117.71
324,180.97 0.00
9,600.00 953,018.18
189,744.02 1,613.70
346,160.02 72,049.08
121,520.02 1,431.18
43,227.92 1,551.25
0.00 0.00
1,600,664.26
160,066.43
1,760,730.68
Kerja dan Peralatan, volume dan/atau ukuran
R UNTUK
ASING HARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,714.29 28.45
14,285.71 4.74
33.19
9,600.00 9,462.82
6,500.00 929.50
10,392.32
43,227.92 14.35
114,117.69 37.88
346,160.02 114.89
167.12
10,592.62
1,059.26
11,651.89
Kerja dan Peralatan, volume dan/atau ukuran
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,714.29 11,833.05
12,857.14 2,581.76
14,285.71 1,434.31
JUMLAH HARGA TENAGA 15,849.11
1,120.00 413,280.00
192,100.00 119,807.60
324,180.97 255,622.49
12,000.00 540,000.00
67,500.00 66,825.00
56,000.00 1,120.00
7,500.00 1,275.00
19,250.00 6,316.41
48,500.00 31,646.25
90,000.00 51,300.00
18,000.00 6,300.00
2,500.00 2,142.00
189,744.02 4,631.91
329,074.31 16,519.79
396,080.02 77,303.59
41,220.05 2,069.28
196,400.02 8,281.93
230,434.31 734.48
0.00 0.00
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,714.29 10,757.31
12,857.14 2,581.76
14,285.71 1,434.31
1,120.00 321,440.00
192,100.00 95,876.37
324,180.97 286,477.57
181,500.00 29,040.00
2,500,000.00 240,000.00
18,000.00 4,500.00
189,744.02 3,137.75
329,074.31 16,519.79
396,080.02 75,712.91
41,220.05 2,069.28
196,400.02 8,281.93
230,434.31 734.48
0.00 0.00
R UNTUK
ASING HARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,714.29 58,519.79
12,857.14 17,555.94
14,285.71 9,753.30
244,600.00 286,182.00
1,120.00 197,120.00
241,500.00 122,886.35
70,800.05 48,337.39
196,400.02 276.06
0.00 0.00
740,630.83
74,063.08
814,693.91
Kerja dan Peralatan, volume dan/atau ukuran
en untuk menyelesaikan satu satuan pekerjaan
kan Penyedia Jasa tidak dapat diubah kecuali
tentuan dalam Instruksi Kepada Peserta Lelang
bahan habis dipakai dan operator.
ajak yang berkaitan (tetapi tidak termasuk PPN
Analisa Skh-10.1.17
AR UNTUK
MASING HARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,714.29 180.00
14,285.71 40.00
220.00
0.00
346,160.02 769,244.49
25,000.00 350,000.00
1,119,244.49
1,119,464.49
111,946.45
1,231,410.94
MAKA TOTAL HARGA 3,694,232.83
Analisa Skh-2.10.a(18)
AR UNTUK
MASING HARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,714.29 225.00
14,285.71 25.00
250.00
0.0625
0.00
79,596.00 82.00
25,000.00 25.76
107.76
357.76
35.78
393.53
Analisa Skh-2.10.a(19)
AR UNTUK
MASING HARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,714.29 300.00
14,285.71 33.33
333.33
0.00
79,596.00 119.39
50,000.00 50,000.00
50,119.39
50,452.73
5,045.27
55,498.00
Analisa Skh-2.10.a(20a)
AR UNTUK
MASING HARGA SATUAN
an Rel Pengaman
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,714.29 60,000.00
14,285.71 10,000.00
70,000.00
56,000.00 56,000.00
5,000.00 50,000.00
1,120.00 16,800.00
241,500.00 28,980.00
151,780.00
50,000.00 50,000.00
50,000.00
271,780.00
27,178.00
298,958.00
29,895.80
Analisa Skh-2.10.a(20b)
AR UNTUK
MASING HARGA SATUAN
an Patok/Rambu
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
10,714.29 37,500.00
14,285.71 5,000.00
42,500.00
56,000.00 16,800.00
5,000.00 10,000.00
1,120.00 5,600.00
241,500.00 4,830.00
37,230.00
1,000.00 1,000.00
1,000.00
80,730.00
8,073.00
88,803.00