Vous êtes sur la page 1sur 2

Well Testing

PE-408
Assignment
Roll no: PE-018
Q): A pressure-buildup test was conducted on a well early in the life of an oil reservoir having the properties summarized ne
Detremine the effective permeability to oil, the original reservoir pressure, and the skin factor.

mu 1 cp
h 22 f
q 500 STB/D
Ct 0.00002 1/psi
phi 0.2
tp 3 day 72 hrs
rw 0.3 f
B 1.3 RB/STB
Horner
Pwf 1150 psia 1920
f(x) = -43.0397570278 ln(x) + 1
1900 pi=1950R²psia
= 0.9999732851
Solution: 1880
Shut-in Time, BHP,pws (tp+∆t)/∆t log[(tp+∆t)/∆t]
1860
(hours) (psia)

Shut-i n bhp, p
1840
0 115 #DIV/0! #DIV/0!

ps i a
1820
2 1794 37 1.5682017241
4 1823 19 1.278753601 1800
8 1850 10 1 1780
1
16 1876 5.5 0.7403626895 1760
24 1890 4 0.6020599913 1740
48 1910 2.5 0.3979400087 1720

Slope m -99 psia/cycle

k 48 Md

pi 1950 psia
73 p @ this ratio

p1hr 1765 psia

s 1.507668559
operties summarized next. The well ws produced at a constant rate of 500 STB/D for 3 days before being shut in.

Horner Plot
Horner Pl ot Logari thmi c (Horner Pl ot)
f(x) = -43.0397570278 ln(x) + 1949.4530529023
R² = 0.9999732851

10 100

Horner time ratio

Vous aimerez peut-être aussi