Chenab Engineering Works and Foundries Pvt Ltd Faisalabad Prepared By SAA
Estimation of Civil Works for Construction of Sand Plant Department Civil Engg.
Ref Civil-001
Sr. No. Item Description UOM Quantity Item Rate Amount Remarks
SECTION-1 PRELIMINARIES & EARTHWORKS Comparison
1.1 Earth Works AIZ RASULIAN SAJJAD AA Takno Art Remarks
1.1.1 Structural excavation in soil above sub soil water level M3 675 750 700 707 495.16 350
for levelling and grading of walls and columns
foundation as shown in drawings and specifications and
as per approval of the engineer.
1.1.2 Structural backfill in foundation and under floor with M3 400 400 350 353 329 283
approved suitable excavated soil from BOQ item 1.1.1
including breaking clods, dressing watering,
compacting mechanically in layers not exceeding
225mm thick depth to 95% modification proctor dry
density (MPD) from any lead and any lift compacted as
per specification and as per approval of the engineer.
1.1.3 Structural fill in foundation and under floor with M3 200 1200 1000 706 695 530
approved suitable borrowed soil including breaking
clods, dressing watering, compacting mechanically in
layers not exceeding 225mm thick depth to 95%
modification proctor dry density (MPD) from any lead
and any lift compacted as per specification and as per
approval of the engineer.
a) Reinforcing steel bars of grade 60 (min. 60,000 psi yield Ton 16.5 150000 115000 125000 113800 115000
strength)
2.3 Structural Concrete
2.3.1 Provide and lay structural cement concrete of 3000 psi
cylinder crushing strength at 28-days using OPC,
Chenab sand and Sargodha crush stone including
formwork and its removal, placing, compacting,
finishing and curing complete in all respects (including
screening and washing of stone aggregate) but
excluding the cost of reinforcement as per
specifications.
28.31257
Column1
Cost Estimate for Construction of Sand Plant & Pre Fabric
Type of Work
Civil Works for
Total Cost 38
Contingencies 10%
Gross Cost 41.8
Column4
Remarks
based on available information and
all types of materials necessary for
construction
from MS Izhar
From Chenab Team
From Chenab Team
From Chenab Team
From Chenab Team
Fast Cables and others