Académique Documents
Professionnel Documents
Culture Documents
submitted
Engineer's Received Started
NO Drawing numbers drawings to Submitted Other Comments
Name Date date date
Eng.
2
3
4
5
6
7
8
9
10
11
12
Signature Signature of DO
Checked By DGM (WSD)
MONTHLY PROJECT DETAILS RECORDS FOR DRAFTMAN OFFICER
MONTH: YEAR:
No of No of
Name of the Job Drawings Received Date to be drawings Submitted date Engineer's Priority as per Other
No Project Code have to Date submitted name the DGM/Eng comments
submitted
draf
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15