VOLUME-III
TECHNICAL SCHEDULES (A to D)
SCHEDULE – A
(See Clause 10.1)
1. The Site
1.1 Site of the Six-Lane project Highway shall include the existing land, buildings,
structures and road works as described in Annex-I of this Schedule-A.
1.2 An inventory of the Site including the land, buildings, structures, road works,
trees and any other immovable property on, or attached to, the Site shall be prepared
jointly by the Authority Representative and the Concessionaire and such inventory
shall form part of the memorandum referred to in Clause 10.3.1 of the Agreement.
1.3 Additional land required for [Toll Plazas, Traffic Aid Posts, Medical Aid Posts and
vehicle rescue posts or for] construction of works specified in the Scope Order
issued under Clause 16.2.3 of this Agreement shall be acquired in accordance
with the provisions of Clause 10.3.6 of this Agreement. Upon acquisition, such land
shall form part of the Site and vest in the Authority.
Chainage Equation
Km Km Km
Km 340.000 Haveri - Hubli
403.400 340+000 403+400
1. Site
The site for Six-Laning shall extend from km 340.000 to km 403.400 of
National Highway no 4 in the state of Karnataka (an index map is at Appendix A-I)
and shall, within the right of way, comprise the land, building, structures and road
works described herein. The left hand side (LHS) corresponds to the direction
moving from Haveri to Hubli and the right hand side (RHS) for Hubli to Haveri side.
The Haveri – Hubli section between km 340.000 to km 403.400 is 63.4 km
long. It has been recently upgraded to 4/6 lanes as part of Golden Quadrilateral.
The total length of the Project Highway is 63.400
km.
2. Land
3. Structures
4. Road Works
(c) The details of existing arch/slab/box pipe culverts are given in Appendix A-III (c)
(f) Details of existing Cattle Passes are given in Appendix A-III (e)
(g) Details of existing Light Vehicular Underpass are given in Appendix A-III (f)
(h) Details of existing Cattle Pass cum Drain are given in Appendix A-III (g)
(f) Details of existing Foot over Bridges are given in Appendix A-III (h)
National Highways Authority of India Schedule A
Span ( No. x CW
S. No. Chainage Location Length (m) Deck width Type of structure
Length) m width
LHS 7X40 280 11.0 13.75 Double cell PSC Girder With Deck continuity
1 345.554
RHS 7X40 280 7.5 11.00 PSC T-Beam Girder
Width of carriageway
S. Existing Design Span (No. x Length
Location Type of Structure
No Chainage Chainage Length m) (m)
Deck width (m) CW (m)
341.898 - Main (LHS) 2X8.175 17.69 11.5 10.5 Two Cell Box
1
341.898 - Main (RHS) 2X8.175 17.69 10.4 9.4 Simply Supported RCC Slab Bridge
361.935 - Main (LHS) 1X7 7.84 11.5 10.5 Single Cell Box
3
361.935 - Main (RHS) 1X7 7.84 11.1 10.1 Simply Supported RCC Slab Drain
362.61 - Main (LHS) 1X6.2 7.04 11.5 10.5 Single Cell Box
4
362.61 - Main (RHS) 1X6.2 7.04 11.5 10.5 Simply Supported RCC Slab Drain
1X9.3+1X8.15+1
382.856 - Main (LHS) 35.79 11.5 10.5 RCC Integral Bridge
X8.1+1X7.9
5
1X9.3+1X8.15+1
382.856 - Main (RHS) 35.79 10.4 7.9 Simply Supported
X8.1+1X7.9
Width of carriageway
S. Existing Design Span (No. x Length
Location Type of Structure
No Chainage Chainage Length m) (m)
Deck width (m) CW (m)
394.832 - Main (LHS) 1X5.85 (Square) 6.84 11.8 11.2 Simply Supported
7
394.832 - Main (RHS) 1X5.85 (Square) 6.84 11.5 10.5 Single Cell Box
397.3 - Main (LHS) 1X10 12.8 13.05 11.8 Single Cell Box + Simple supported
8
397.3 - Main (RHS) 1X10 12.8 13.05 11.8 Single Cell Box + Simple supported
398.597 - Main (LHS) 1X10 10.84 11.5 10.5 Single Cell Box
9
398.597 - Main (RHS) 2X4.75 10.84 8.2 7.6 Simply Supported
401.717 - Main (LHS) 1X6 7.6 11.5 10.5 Single Cell Box
10
401.717 - Main (RHS) 1X6 7.6 11.5 10.5 Single Cell Box
401.864 - Main (LHS) 1X2.85+2X2.815 10.22 11.5 10.5 Three Cell Box
11
401.864 - Main (RHS) 1X2.85+2X2.815 10.22 11.5 10.5 Three Cell Box
(ii) On Service Road
Width of carriageway
S. Existing Design Span (No. x Length
Location Type of Structure
No Chainage Chainage Length m) (m)
Deck width (m) CW (m)
1 355.164 - LHS 2 X 6.1 +1 X 6.25 24.5 11.00 7.50 Simply Supported RCC solid slab
40 378.589 Box 1.5x1.5 15.255 Box 1.5x1.5 16.58 Pipe 1x1.0(dia.) 10 NIL NIL NIL Functional
1x1.0
41 378.968 Box 1.5x1.5 14.195 Box 1.5x1.5 13.955 Pipe 1x1.0(dia) 10.0 Pipe 7.5 Functional
(dia)
Box+ (5.1x1.5), 20.7(B)+0.5 3x1.0
42 379.310 Pipe 3x1.0(dia.) 21.85 Pipe 3x1.0(dia.) 7.5 Pipe 7.5 Functional
Pipe .3x1.0dia. (P) (dia.)
43 381.240 Box 1.5x1.5 16.425 Box 1.5x1.5 15.155 Pipe 1x1.0(dia.) 7.5 NIL NIL NIL Functional
44 382.512 Box 1.5x1.5 15.775 Box 1.5x1.5 13.665 NIL NIL NIL Pipe 1 x 1.0 7.5 Functional
45 383.182 Box 1.5x1.5 14.7 Box 1.5x1.5 14.3 NIL NIL NIL NIL NIL NIL Functional
Box+
2x1.0(dia.), 1.8(B)+12.05
46 383.372 Pipe+ Box 2.25x1.5 16.7 Pipe 2x1.0(dia) 10 NIL NIL NIL Functional
2.25x1.5 (P)+2.45(B)
Box
47 383.716 Box 1.5x1.5 14.9 Box 1.5x1.5 14.81 Pipe 1x1.0(dia.) 10 NIL NIL NIL Functional
0.531(P)+
Pipe+ 2.5x1.5&
48 384.563 Pipe 2x1.0(dia.) 14.222 14.2 Pipe 2x1.0(dia) 17.81 Pipe 2 x 1.0 13.154 Functional
Box 2x1.0(dia.)
(B)
49 386.008 Box 1.5x1.5 14.675 Box 1.5x1.5 14.365 Pipe 1x1.0(dia.) 10 NIL NIL NIL Functional
50 386.569 Box 1.5x1.5 19.253 Pipe 1x1.0(dia) 19.715 NIL NIL NIL Pipe 2 x 1.0(dia) 10.0 Functional
51 386.851 Box 1.5x1.5 17.451 Pipe 1x1.0(dia) 14.7 NIL NIL NIL Pipe 1x1.0(dia) 10.0 Functional
Box+ 1.5x1.5,1x1. Pipe+ 1x1.0(dia.), 0.75(P)+1 1x1.0
52 387.613 13(B)+2.25(P) NIL NIL NIL Pipe 10 Functional
Pipe 0(dia.) Box 1.5x1.5 3.9(B) (dia.)
53 387.820 Box 1.5x1.5 16.55 Box 1.5x1.5 14.355 NIL NIL NIL Pipe 1x1.0(dia.) 10 Functional
54 388.679 Box 1.5x1.5 20.6 Box 1.5x1.5 18 NIL NIL NIL Pipe 1x1.0(dia.) 7.5 Functional
55 389.106 Pipe 2x1.0(dia.) 14.95 Box 2.25x1.5 15.3 Pipe 2x1.0(dia.) 10 Pipe 2x1.0(dia.) 7.5 Functional
Main Carriageway Service roads
Left Right Left Right
S. Chainage
size (Span x size (Span x Size (Span Size (Span x Remarks
No. (km) Length Length Length
Type Height), Length (m) Type Height), Type x Height), Type Height),(No x
(m) (m) (m)
No x Dia) (No x Dia) (No x Dia) Dia)
56 389.296 Box 1.5x1.5 15.89 Box 1.5x1.5 16.625 Pipe 1x1.0(dia.) 10 Pipe 1x1.0(dia.) 7.5 Functional
57 389.657 Box 1.5x1.5 17.477 Box 1.5x1.5 17.6 Pipe 1x1.0(dia.) 10 Pipe 1x1.0(dia) 7.50 Functional
Pipe+ 2x1.0(dia), 2.65(P)+1
58 389.844 Pipe 2x1.0(dia.) 14.8 Pipe 1x1.0(dia.) 10 Pipe 2x1.0(dia.) 7.5 Functional
Box 2.22x1.5 4.55(B)
Box+ 1.5x1.5, 1.0(B)+13
59 390.441 Box 1.5x1.5 14.8 Pipe 1x1.0(dia.) 12.5 NIL NIL NIL Functional
Pipe 1x1.0(dia.) .7(P)
Pipe+ 2x1.0(dia.), 0.763(P)+ 2x1.0
60 391.233 Pipe 2x1.0(dia.) 14.05 Pipe 2x1.0(dia.) 10 Pipe 10 Functional
Box 2.2x1.5 14.487(B) (dia.)
Box+ 18.62(B)+4.68 Pipe+ 9.5(P)+13.
61 392.065 5.25x1.5 5.25x1.5 NIL NIL NIL NIL NIL NIL Not Functional, Blocked
Pipe (P) Box 975(B)
Not Functional, SR above
2x1.0 Invert Level of CD, No CD
62 392.906 Pipe 2x1.0(dia) 20.0 Pipe 2x1.0(dia) 20.0 NIL NIL NIL Pipe 10.0
(dia) on service Road, Enough
cushion is available.
Not Functional, SR above
Pipe+ 2x1.0(dia.),2.2 0.847(P)+ Invert Level of CD, No CD
63 393.395 Pipe 2x1.0(dia.) 16.4 NIL NIL NIL Box 2.25x1.5 12.697
Box 5x1.5 16.185(B) on service Road, Enough
cushion is available.
Not Functional, SR above
Pipe+ 1x1.0(dia), 12.35(P)+1.68 Invert Level of CD, No CD
64 395.790 Box 1.5x1.5 19.45 NIL NIL NIL Box 1.5x1.5 12.9
Box 1.5x1.5 (B) on service Road, Enough
cushion is available.
Box + 2.5x1.5 , 10.385(B)+12.
65 396.207 Box 2.5x1.5 22.102 NIL NIL NIL Box 2.5x1.5 11.225 Functional
Pipe 2x1.0(dia) 755(P)
Main Carriageway Service roads
Left Right Left Right
S. Chainage
size (Span x size (Span x Size (Span Size (Span x Remarks
No. (km) Length Length Length
Type Height), Length (m) Type Height), Type x Height), Type Height),(No x
(m) (m) (m)
No x Dia) (No x Dia) (No x Dia) Dia)
Box+ 2.21x 6.495(B)+12.3
66 396.409 Pipe+ 1.5(B), 08(P)+ Box 2.21x1.5 18.94 NIL NIL NIL Box 2.21x1.5 13.03 Functional
Box 2x1.0 (dia) 0.442(B)
67 396.449 Box 1.5x1.5 16.9 Box 1.5x1.5 19.6 NIL NIL NIL Box 1.5x1.5 12.45 Functional
2.25x Not Functional, Blocked,
Box+ 15.87(B)+
68 398.902 1.5(B), Pipe 2x1.0(dia) 17.28 NIL NIL NIL NIL NIL NIL Enough cushion is
Pipe 1.58(P)
2x1.0 (dia) available.
69 399.154 Box 1.5x1.5 17.28 Box 1.5x1.5 16.8 NIL NIL NIL NIL NIL NIL Functional
70 399.199 Box 1.5x1.5 17.565 Box 1.5x1.5 16.54 NIL NIL NIL NIL NIL NIL Functional
Box+ 4x1.5, 3x1.0 14.85(P)+ 2x1.0
71 399.319 Box 4x1.5 17.7 NIL NIL NIL Pipe 7.5 Functional
Pipe (dia) 2.1(B) (dia)
72 399.902 Box 1.5x1.5 14.304 Box 1.5x1.5 11.917 NIL NIL NIL NIL NIL NIL Functional
73 401.131 Pipe 1x1.0(dia) 12.5 Pipe 1x1.0(dia) 12.5 NIL NIL NIL NIL NIL NIL Functional
74 402.576 Box 2.75x2.45 17.02 Box 2.75x2.45 14.09 NIL NIL NIL NIL NIL NIL Functional
75 403.035 Pipe 2x1.2(dia) 22.500 Pipe 2x1.2(dia) 26.39 NIL NIL NIL NIL NIL NIL Functional
Note :
1. LSR -Left service road
2. RSR -Right service road
3. MCW-Main Carriageway
4. LMCW-Left Main Carriageway
5. RMCW-Right Main Carriageway
6. B-Box
7. P-Pipe
National Highways Authority of India Schedule A
Note * - Structure does not exists at mentioned location, but separate tendering process for the construction of these structures is already in advanced stage.
Six laning and Strengthening of Km. 340.000 to Km. 403.400 A-1
Haveri-Hubli section of NH-4 in the state of Karnataka
The Site includes the following Flyovers:
Width of carriageway
S. Existing Design Type of Span (No. x
Location Length (m) Type of Structure
No Chainage Chainage Structure Length m) Deck width
CW (m)
(m)
Nil
Appendix A-III (e)
Details of Cattle Crossing/ Pedestrian
Underpass
Details of LVUP
The Site includes the following
LVUP:
Design Width of carriageway
S. Existing Type of Span (No. x Length
Chainage Location Type of Structure
No Chainage (Km) Structure Length m) (m) Deck width (m) CW (m)
(Km)
Main 1 x 10.50 RCC Box cell type
346.510 * - LVUP 10.50 14.0 10.5
(LHS) structure
1
Main 1 x 10.50 RCC Box cell type
346.510 * - LVUP 10.50 14.0 10.5
(RHS) structure
Main 1 x 10.50 RCC Box cell type
358.550 * - LVUP 10.50 14.0 10.5
(LHS) structure
2
Main 1 x 10.50 RCC Box cell type
358.550 * - LVUP 10.50 14.0 10.5
(RHS) structure
Note * - Structure does not exists at mentioned location, but separate tendering process for the construction of these structures is already
in advanced stage.
Appendix A-III (g)
Details of Cattle Pass cum
Drain
Width of
Existing Design carriageway
S. Span (No. x Length
Chainage Chainage Location Type of Structure Type of Structure
No Length m) (m) Deck width CW
(Km) (Km)
(m) (m)
342.778 - Main (LHS) Cattle pass cum drain 1X5 9.600 13.75 11.0 RCC Box cell type structure
1
342.778 - Main (RHS) Cattle pass cum drain 1X5 9.600 13.75 11.0 RCC Box cell type structure
353.256 - Main (LHS) Cattle pass cum drain 1X6.25 10.850 13.75 11.0 RCC Box cell type structure
2
353.256 - Main (RHS) Cattle pass cum drain 1X6.25 10.850 13.75 11.0 RCC Box cell type structure
369.646 - Main (LHS) Cattle pass cum drain 1X6.25 10.850 13.75 11.0 RCC Box cell type structure
3
369.646 - Main (RHS) Cattle pass cum drain 1X6.25 10.850 13.75 11.0 RCC Box cell type structure
377.710 - Main (LHS) Cattle pass cum drain 1X5 9.600 13.75 11.0 RCC Box cell type structure
4
377.710 - Main (RHS) Cattle pass cum drain 1X5 9.600 13.75 11.0 RCC Box cell type structure
395.490 - Main (LHS) Cattle pass cum drain 1X5 7.660 17.3 11.0 RCC Box cell type structure
5
395.490 - Main (RHS) Cattle pass cum drain 1X5 7.660 17.97 11.0 RCC Box cell type structure
National Highways Authority of India Schedule A
Appendix A-III (h)
1 362+770*
2 391+850*
3 395+910*
4 397+570*
Note * - Structure does not exists at mentioned location, but separate tendering process
for the construction of these structures is already in advanced stage.
Road Works
(a) Details of existing Service Roads are given in Appendix A-IV (a)
(b) The carriageway width for the reach is generally 7.0 m with 1.5 m wide paved
shoulder and 2.0 m wide earthen shoulder for either side traffic. The width of
median is generally 5.0 m (4.5 m raised and 2x0.25 m kerb shyness) and 2.0 m (1.5
m raised and 2x0.25 m Kerb shyness) at grade separated structures.
Wider carriageway has been provided at the location of Toll Plaza and other
structures. The section has some 3 lane stretches, as given in Appendix A-IV (b)
(d) Details of Toll Plaza, Highway Control Center are given in Appendix A-IV (d)
(e) Details of Busbays and Truck Laybyes are given in Appendix A-IV(e)
Appendix A-IV (a)
Details of Existing Service
4.0 m wide Service Road Roads
L.H.S. R.H.S.
Sl. No.
From To Length (m) From To Length (m)
1 340.000 341.776 1776 342.560 342.770 210
2 343.075 344.440 1365 346.148 346.480 332
3 345.850 352.217 6367 354.780 355.140 360
4 354.640 354.920 280 359.700 361.925 2225
5 355.240 355.720 480 362.920 363.540 620
6 358.326 359.300 974 363.640 364.520 880
7 360.982 361.925 943 364.520 367.260 2740
8 365.300 365.500 200 369.515 371.480 1965
9 366.160 369.640 3480 378.812 379.425 613
10 371.340 378.230 6890 380.100 381.100 1000
11 378.940 382.518 3578 381.140 382.520 1380
12 386.340 386.525 185 383.000 384.575 1575
13 392.542 392.760 218 388.600 390.970 2370
14 393.750 394.660 910 393.300 393.900 600
15 394.900 397.000 2100 394.900 398.340 3440
16 397.500 398.400 900 398.900 399.980 1080
17 398.700 400.600 1900
Total 32546 Total 21390
5.5 m wide Service Road
1 356.400 357.200 800 356.440 357.000 560
2 357.200 357.420 220 - - -
Total 1020 Total 560
7.0 m wide Service Road
1 342.375 343.075 700 340.100 341.360 1260
2 352.800 354.640 1840 341.560 341.600 40
3 354.920 354.980 60 355.700 356.420 720
4 355.175 355.240 65 362.875 362.920 45
5 355.720 356.400 680 374.450 375.180 730
6 362.900 365.300 2400 375.200* 377.350* 2150*
369.600* 371.500* 900* 380.140 380.500 400
7 378.230 378.940 710 380.500* 381.150* 650*
8 383.180 386.340 3160 384.575 388.600 4025
9 388.580 392.360 3780 390.970 393.300 2330
10 394.700* 394.900* 200* 391.900* 392.200* 300*
11 400.600 401.700 1100
12 401.920 402.450 530
Total 16125 Total 12650
Note * - Service Roads does not exists at mentioned location, but separate tendering
process for the construction is already in advanced stage.
Appendix A-IV (b)
Details of 3 lane Carriageway
(LHS) Chainage L
S No
From to
1 340.340 340.410
2 340.890 340.950
3 341.880 341.930
4 342.760 342.790
5 344.800 345.412
6 345.412 345.695
7 345.695 346.050
8 346.110 346.175
9 346.220* 346.680*
10 350.860 350.890
11 353.240 353.270
12 355.017 355.035
13 355.146 355.152
14 356.220 356.420
15 357.600* 358.425*
16 363.075 363.900
17 364.040* 364.760*
18 367.280 367.296
19 368.240 368.260
20 368.764 368.785
21 369.634 369.660
22 374.895 374.940
23 377.697 377.723
24 378.400* 379.140*
25 379.427 379.443
26 382.827 382.886
27 384.065* 384.875*
28 385.400 385.900
29 386.530 386.550
30 388.685 388.705
31 389.665 389.678
32 390.500* 391.425*
33 392.180 392.220
34 392.320 392.340
35 392.340 392.460
36 392.940 392.962
37 394.040 394.060
38 394.815 394.830
39 396.990 397.010
40 397.282 397.320
41 398.570 398.605
42 400.774 401.425
43 401.710 401.730
44 401.855 401.877
45 402.500 402.700
Details of 3 lane Carriageway (RHS)
1 340.917 RHS R
2 343.09 LHS L
3 344.37 LHS M
4 344.37 RHS M
5 345.175 RHS M
LHS &
6 346.5 M
RHS
7 347.621 LHS M
8 348.025 RHS M
9 348.402 LHS M
10 348.402 RHS M
11 352.257 LHS L
12 353.15 LHS L
13 354.078 LHS M
14 354.078 RHS M
15 354.777 LHS M
16 354.777 RHS M
LHS &
17 356.333 M
RHS
18 356.85 LHS M
19 357.185 LHS M
20 360.985 RHS R
21 361.302 LHS L
22 361.39 LHS L
23 361.9 LHS M
24 362.82 RHS M
LHS &
25 363.56 M
RHS
Sl. Connected Junction
Chainage Side Village
No. to Type
26 364 LHS LSSR T Jakkanakatti
27 364.275 LHS MCW T Filling Station
28 364.444 LHS MCW T Gangibhavi
29 364.444 RHS MCW T Shiggoan Town
30 364.73 LHS MCW T Hotel
31 365.308 LHS MCW T College
32 367.1 RHS RSSR T Mugali
33 367.7 RHS MCW T Kamanahalli
34 367.75 LHS LSSR T Kamanahalli
35 369.1 LHS LSSR T Dhundasi
36 369.647 RHS RSSR T Gotagudi
37 371.447 RHS MCW T Mankatti
38 371.447 LHS MCW T Madli
39 374.472 LHS MCW T Syadambi
Vehicular
40 374.925 RHS RSSR Kadahalli
Crossing
41 375.473 LHS MCW T Adavi Somapur
42 376.89 LHS LSSR T Honnapur
43 377.448 RHS MCW T Neeralgi
44 378.825 RHS MCW T Thimmapur
45 379.5 LHS LSSR T Belligatti
46 382.236 LHS MCW T Jigalur
47 382.236 RHS MCW T Jigalur
48 382.53 RHS MCW T Kunkoor
49 384.55 LHS MCW T Filling Station/Tadas
50 384.55 RHS MCW T Ramankoppa
51 384.741 LHS LSSR T Gayatri Temple
Vehicular
52 385.64 LHS LSSR Tadas / Sirisi
Crossing
53 386.04 RHS MCW T Hotel Yatri Nivas
54 386.352 LHS LSSR T Thirumalakoppa
55 388.17 RHS RSSR T Agadi
56 388.698 LHS LSSR T Palikoppa
Sl. Connected Junction
Chainage Side Village
No. to Type
57 390.451 LHS LSSR T Surasettikoppa
58 391 LHS LSSR T Varur
59 391 LHS RSSR T Varur
60 391.216 RHS MCW T Komplikoppa
61 391.76 RHS RSSR T Navagrahteerth
62 391.85 LHS LSSR T VRL HQ
Vehicular
63 392.6 RHS RSSR Chabbi
Crossing
64 392.6 LHS LSSR T Ashram
65 393.115 LHS MCW T Bommasamudra
66 394.985 LHS MCW T Kaveri Daba
67 395.315 RHS MCW T Pale
68 395.942 LHS MCW T Belagali
69 395.942 RHS MCW T Sherewada
70 397.52 LHS MCW T Kuradikeri
71 397.535 RHS MCW T Nulvi
72 399.205 RHS RSSR T Adargunchi
73 399.45 LHS LSSR T Budrasingi
74 400.015 LHS MCW T Budrasingi
75 400.015 RHS MCW T Adargunchi Extn
Vehicular
76 400.85 LHS RSSR Kundugol
Crossing
77 402.2 RHS RSSR T Navatha Transport
78 403.079 LHS MCW T Gabbur Village
Appendix A-IV (d)
Details of Existing Toll
S.No
Plaza
De
tail
s of
Hi
gh
wa
y
Co
ntr
ol
Str
uct
ure
Nil
Appendix A-IV (e)
The total number of bus bays and truck lay byes on the Project Highway is
noted below:
Environmental Clearances
As per above said MOEF EIA Notification the Environmental Clearance is not required for
this project due to the existing Right of Way is sufficient in range of 60-67m, so that
further additional land acquisition not required.
The project road section does not fall near any wild life sanctuary and protected forest.
Hence clearance is not required as per MOEF guidelines.
The project road section does not fall in the vicinity of regulated area of protected monument
of archaeological site & remains declared as of national importance under the Ancient
Monuments and Archaeological Sites and Remains Act, 1958. Hence no clearance is required
from The Competent Authority, NCT of Delhi, Archaeological Survey of India.
National Highways Authority of India Schedule B
SCHEDULE - B
(See Clause 2.1)
2 Six-Laning
1. Width of Carriageway
1.1 The carriageway shall be 10.5 m wide (excluding 0.5 m wide paved portion of median)
on either side of the median. Provided that the width shall be adjusted to fit into
appropriate plans and cross sections developed in accordance with Schedule D to
accommodate all the features of Six-Laning described herein. The fact that different types
of cross sections need to be developed in different segments of the project length is
illustrated in an indicative manner in Appendix B-I.
1.2 Except as otherwise provided in this agreement, the width of the paved carriageway shall
conform to clause 1.1 above.
1.3 Other Features of Six-laning
1.3.1 Entry/Exit Ramps
Entry/Exit Ramps for entering into or exiting from the six lane carriageway shall be
provided at locations indicated in Appendix B-II.
1.3.2 Service roads
Service roads shall be provided in lengths indicated in Appendix B-III.
1.3.3 Flyovers/ Interchanges
Flyovers/Interchanges shall be provided as indicated in Appendix B-
IV
1.3.4 Vehicular Under passes/ Light Vehicular Under passes
Vehicular underpasses (VUP) and Light Vehicular Underpasses of different spans and
minimum vertical clearance shall be provided at locations indicated in Appendix B-V.
1.3.5 Pedestrian/Cattle underpasses
Pedestrian/Cattle underpasses (PUP/CUP) of different spans and minimum vertical
clearance shall be provided at locations indicated in Appendix B-VI.
1.3.6 Culverts
Culverts as listed in Appendix B-VII shall be provided, widened, reconstructed, or
extended.
1.3.7 Minor bridges
Minor bridges as listed in Appendix B-VIII shall be provided, widened, reconstructed,
or extended.
1.3.8 Major bridges
Major bridges as listed in Appendix B-IX shall be provided, widened, reconstructed, or
extended
1.3.9 Bridges not required to be widened
The bridges listed in Appendix B-X shall not be
widened
1.3.10 At grade junctions
At-grade junctions shall be provided at the intersection of service roads and all
intersecting roads. Existing At grade junction and median opening on the main highway
at the locations given in Appendix B-XI shall be closed.
1.3.11 Road Over Bridges
Road Over Bridges as listed in Appendix B-XII shall be provided, widened,
reconstructed, or extended.
1.3.12 Overpasses
Overpasses at locations as listed in Appendix B-XIII shall be
provided.
1.3.13 Drainage
Drainage measures shall be provided as given in Appendix B-
XIV.
1.3.14 Retaining Structures
Retaining structures at high embankment are listed as given in Appendix B-
XV
1.3.15 Median Width
Existing median shall be maintained as it is. Median shall be widened to 12m from
ch. 401+570 to ch. 401+630 to accommodate the structure components of interchange.
1.3.16 Median Openings
Median Openings shall be provided as given in Appendix B-
XVI
1.3.17 Slope Protection works
The Side slope shall be protected by using suitable slope protection measures
wherever required along the present highway.
1.3.18 Corrosion Protection for Reinforcement
Corrosion Protection for reinforcement shall confirm to the requirement of IRC SP:
80- 2008 “Guidelines for Corrosion Prevention, Monitoring and Remedial Measures for
Concrete Bridge Structures”.
1.3.19 Utilities
Provision for accommodating utilities shall be made both over as well as underground
wherever required.
1.3.20 Rainwater Harvesting
As per Ministry of Environment and Forests Notification, New Delhi dated 14.01.1997
(as amended on 13.01.1998, 05.01.1999 & 6.11.2000), the construction of Rain water
harvesting structure is mandatory in and around Water Crisis area, notified by the Central
Ground Water Board.
1.3.21 Use of Fly Ash / Pond Ash for Embankment
For use of Pond Ash for embankment construction, MOEF guidelines should be
followed.
1.3.22 Right of way
The proposed right of way is listed in Appendix B-
XVII
2. Project Facilities
Project facilities shall be constructed in conformity with Annex-I of Schedule-
C.
3. Specifications and Standards
The Project Highway shall be constructed in conformity with the Specifications
and Standards specified in Annex-I of Schedule-D.
Appendix B-I
(a) Typical Cross Sections Schedule
Total
TCS
Description Length Reference
Type
(km)
Six-lane Divided Highway with Service roads Refer Fig 2.7, Clause
1 and with raised median of 5.5m in 4 lanes to 6 45.097 2.17 of IRC: SP:87-
laning project. 2013
Six-lane Existing Flyover/Underpass
Approach cross section + existing median+
Refer Below Typical
2 existing crash barrier on both sides + 7m 4.760
Cross Section
paved service Road + 2.0m Lined inner
longitudinal drain after service road
Six lane Underpass with 10.5m carriageway
and 2m paved shoulder + 5.5m median + 0.5m Refer Below Typical
3 6.415
Crash barrier on both sides + 7m service road Cross Section
+ 2m drain cum footpath on both sides
Four VUPs and Two LVUPs along with their
approaches are being tendered as different
3* contract. Operation, Maintenance and 4.255 -
improvement would be under current scope of
work
Six Lane divided highway with 10.5m Refer Fig 2.6, Clause
4 carriageway and 1.5m paved shoulder and 2m 0.820 2.17 of IRC: SP:87-
earthen shoulder + earthen drain on both sides. 2013
Six-lane cross section for minor bridge with
4.5 m raised median with 15.8m deck width
for each main carriageway with RCC crash Refer Below Typical
5 0.123
barrier and foot path + 10.8m wide deck width Cross Section
for service road on both sides with Footpath
and RCC crash barrier.
Refer Below Typical
6 Major bridge 0.280
Cross Section
Toll Plaza
7 Length of toll plaza with rigid pavement. 1.650
approaches
Total Length 63.400
Note: 1. Kerb shyness shall be provided as per IRC: SP 87-2013 for 6 laning standards.
2. Hard (Paved) Shoulders (PS) & Soft (Earthen) Shoulders (ES) besides Main carriageway & service
road shall be provided in all the cross-sections as per Schedule-‘D’.
3. Median Drains wherever required shall be provided with RCC
4. Drain cum retaining wall shall be provided wherever TCS 1 doesn’t fit with in Proposed ROW.
National Highways Authority of India Schedule B
Appendix B-II
Exit/Entry Ramps
LHS RHS
Sl No.
Entry Exit Entry Exit
1 340.100 340.100
2 341.760 341.760 341.760 341.760
3 345.100 345.100
4 346.250 346.250
5 347.800 347.800 347.800 347.800
6 348.840 348.840 348.840 348.840
7 351.700 351.700
8 353.350 353.350
9 354.700 354.700 354.700 354.700
10 355.740 355.740 355.740 355.740
11 356.800 356.800 356.800 356.800
12 358.100 358.100 358.100 358.100
13 358.900 358.900 358.900 358.900
14 363.040 363.040 363.040 363.040
15 364.900 364.900 364.900 364.900
16 370.600 370.600 370.600 370.600
17 371.900 371.900 371.900 371.900
18 374.400 374.400 374.400 374.400
19 375.400 375.400 375.400 375.400
20 378.200 378.200 378.200 378.200
21 380.040 380.040 380.040 380.040
22 384.000 384.000 384.000 384.000
23 386.000 386.000 386.000 386.000
24 390.200 390.200 390.200 390.200
25 393.300 393.300 393.300 393.300
26 398.800 398.800 398.800 398.800
27 403.000 403.000
Additional Entry exit ramps may be provided at Commercial Complex where access permission
is provided by competent government authority. The Location for may be finalized as per site
conditions with approval of the Independent Engineer.
L.H.S. R.H.S.
Sl.
No. Length Length
From To From To
(m) (m)
1 340.000 345.100 5100 340.000 345.100 5100
2 346.200 351.700 5500 346.200 351.700 5500
3 353.450 369.600 16150 353.450 375.200 8475
4 369.600* 371.500* 1900* 375.200* 377.350* 2150*
5 371.500 394.700 23200 377.350 380.500 3150
6 394.700* 394.900* 200* 380.500* 381.150* 650*
7 394.900 403.000 8100 381.150 391.900 10750
8 391.900* 392.200* 300*
9 392.200 403.000 10800
Total 60150 60150
Note* : The Service road sections in Sl. No.4,6,8 is to be done by different contract.
However, the Operation, Maintenance and Improvement shall be within the scope of
concessionaire during their entire concession period.
Appendix B-IV
Flyovers
Flyovers of different spans and minimum vertical clearance shall be provided at locations
indicated below:
(a) Details of New Flyovers
S. Existing Design Span VC Proposed Deck Width * Crossing Location
No Chainage Chainage arrangement (m)
Km Km (no x length) LHS (m) RHS (m)
Nil
*: The total width excludes the clear gap between two super structures, which will be dictated by the roadway alignment
#: Minimum clear span between the inner faces of substructure normal to the existing cross road.
S. Existing De
No Chainage Cha
(Km) (K
1 348.400 348
2 354.095 354
3 364.500* 364+
4 371.472 371
5 378.845* 378+
6 384.600* 384+
7 390.950* 390+
Main
340.917 340.917 2X10
(LHS)
Main
340.917 340.917 2X10
(RHS)
Retained structure / Rehabilitation Details
Structure Span Deck
S. Arrangement Width
No. / Design Location
No Repairs
Chainage Chainage
(km) (No. x Length m) (m)
* Cleaning of Underpass.
* Repairs of any
Main damaged component, if
374.91 374.91 1X10 12.25
(LHS) any.
* Repairing/replacement of the
2 Crash barrier/railing and wearing
* Cleaning of Underpass.
* Repairs of any
Main damaged component, if
374.91 374.91 1X10 12.25
(RHS) any.
* Repairing/replacement of the
Crash barrier/railing and wearing
* Cleaning of Underpass.
* Repairs of any
Main damaged component, if
385.614 385.614 2X10 12.25
(LHS) any.
* Repairing/replacement of the
3 Crash barrier/railing and wearing
* Cleaning of Underpass.
* Repairs of any
Main damaged component, if
385.614 385.614 2X10 12.25
(RHS) any.
* Repairing/replacement of the
Crash barrier/railing and wearing
* Cleaning of Underpass.
* Repairs of any
Main damaged component, if
392.2 392.2 1X10 12.25
(LHS) any.
* Repairing/replacement of the
4 Crash barrier/railing and wearing
* Cleaning of Underpass.
* Repairs of any
Main damaged component, if
392.2 392.2 1X10 12.25
(RHS) any.
* Repairing/replacement of the
Crash barrier/railing and wearing
* Cleaning of Underpass.
* Repairs of any
Main damaged component, if
400.835 400.835 1X10 12.25
(LHS) any.
* Repairing/replacement of the
Crash barrier/railing and wearing
5
* Cleaning of Underpass.
coat.
* Repairs of any
Main damaged component, if
400.835 400.835 1X10 12.25
(RHS) any.
* Repairing/replacement of the
Crash barrier/railing and wearing
coat.
# Necessary repairs as mentioned to existing structure shall be carried out but not limited to,
in consultation with Independent Engineer.
Light Vehicular Underpasses
LVUP of different spans and minimum vertical clearance shall be provided at location
indicated below.
(a) Details of New LVUP
S. Existing Design Clear Vertical
Proposed Deck Width*
No Chainage Chainage Span# Clearance
(Km) (Km) (m) (m) LHS (m) RHS (m)
1 344.350 344+350 1 x 10.50 4.5 14.00 14.00
2 346.510* 346+510* 1 x 10.50 4.5 14.00 14.00
3 358.550* 358+550* 1 x 10.50 4.5 14.00 14.00
4 400.000 400.000 1 x 10.50 4.5 14.00 14.00
Note* : The above mentioned LVUPs is to be done by different contract. However, the
Operation, Maintenance and Improvement shall be within the scope of
concessionaire during their entire concession period.
Note : The span arrangement is minimum and the same shall be finalized in consultation
with NHAI/IE. Any change in span arrangement shall not be treated as change
of scope.
Appendix B-VI
Pedestrian Underpass of different spans and minimum vertical clearance shall be provided
at location indicated below.
(a) Details of New Pedestrian/ Cattle Underpasses
Existing Design
Vertical Proposed Deck Width*
S. Chainage Chainage Clear
Clearance
No Span# (m)
(m)
(Km) (Km) LHS (m) RHS (m)
*: The total width excludes the clear gap between two super structures, which will be dictated by the roadway alignment
#: Minimum clear span between the inner faces of substructure normal to the existing cross road.
Main
* Cleaning of Underpass.
346.148 346+148 (LHS)
1 x 3.0 13.75 * Repairs of any damaged component, if
any.
1 * Repairing/replacement of
Main
* Cleaning of Underpass.
346.148 346+148 (RHS)
1 x 3.0 13.75 * Repairs of any damaged component, if
any.
* Repairing/replacement of
Main * Cleaning of Underpass.
350.880 350+880 1 x 3.0 13.75 * Repairs of any damaged component, if
(LHS) any.
2 * Repairing/replacement of
* Total width of Deck after widening shall not be less than specified in table.
# Necessary repairs to existing structures shall be carried out as mentioned above but not limited to, in consultation
with Independent Engineer
(d) Cattle Underpasse cum drain to be Retained
(e)
Retained structure / Rehabilitation Details
Design
Structure Span Deck
S. Chainage
No. / (km) Location Arrangement Width
No Repairs#
Chainage (No. x Length
(m)
m)
* Cleaning of Underpass.
342.778 342+778
Main
1X5 13.75
* Repairs of any damaged component, if any.
(LHS) * Repairing/replacement of the Crash
1 barrier/railing and wearing coat.
* Cleaning of Underpass.
342.778 342+778
Main
1X5 13.75
* Repairs of any damaged component, if any.
(RHS) * Repairing/replacement of the Crash
barrier/railing and wearing coat.
* Cleaning of Underpass.
Main *
353.256 353+256 1X5 13.75 Repairs of any damaged component, if any.
(LHS) * Repairing/replacement of the Crash
2 barrier/railing and wearing coat.
* Cleaning of Underpass.
Main *
353.256 353+256 1X5 13.75 Repairs of any damaged component, if any.
(RHS) * Repairing/replacement of the Crash
barrier/railing and wearing coat.
* Cleaning of Underpass.
Main *
369.646 369+646 1X5 13.75 Repairs of any damaged component, if any.
(LHS) * Repairing/replacement of the Crash
3 barrier/railing and wearing coat.
* Cleaning of Underpass.
369.646 369+646
Main
1X5 13.75
* Repairs of any damaged component, if any.
(RHS) * Repairing/replacement of the Crash
barrier/railing and wearing coat.
* Cleaning of Underpass.
377.71 377+710
Main
1X5 13.75
* Repairs of any damaged component, if any.
(LHS) * Repairing/replacement of the Crash
4 barrier/railing and wearing coat.
* Cleaning of Underpass.
Main *
377.71 377+710 1X5 13.75 Repairs of any damaged component, if any.
(RHS) * Repairing/replacement of the Crash
barrier/railing and wearing coat.
* Cleaning of Underpass.
Main *
395.49 395+49 1X5 17.3 Repairs of any damaged component, if any.
(LHS) * Repairing/replacement of the Crash
5 barrier/railing and wearing coat.
* Cleaning of Underpass.
Main *
395.49 395+49 1X5 17.97 Repairs of any damaged component, if any.
(RHS) * Repairing/replacement of the Crash
barrier/railing and wearing coat.
# Necessary repairs to existing structures shall be carried out as mentioned above but not limited to, in consultation
with Independent Engineer
National Highways Authority of India Schedule B
Appendix B-VII
Culverts
A Widening/New Construction Scheme for Culverts on Main Carriageway
The following culverts on Main Carriageway shall be widened/new construction as per the applicable
TCS
Design Type of Structure Span Arrangement
Existing Existing Design Recommendation
Sr.No. CD Existing Proposed Existing Proposed
CD No. Chainage Chainage
No. LHS RHS LHS RHS LHS RHS LHS RHS LHS RHS
1 - 340.238 - 340.238 Box Pipe Box Pipe Widening Widening 2.5x1.5 2x1.0 2.5x1.5 2x1.0
2 - 343.103 - 343.103 Box Box Box Box Widening Widening 1.5x1.5 1.5x1.5 1.5x1.5 1.5x1.5
3 - 343.808 - 343.808 Pipe Pipe Pipe Pipe Widening Widening 2x1.0 2x1.0 2x1.0 2x1.0
4 - 344.526 - 344.526 Box Box Box Box Widening Widening 6x1.5 4 x 1.5 6x1.5 4 x 1.5
5 - 344.852 - 344.852 Box Pipe Box Pipe Widening Widening (3.5+1.75+3.5)X1.5 5x1.2 (3.5+1.75+3.5)X1.5 5x1.2
6 - 345.853 - 345.853 Pipe Pipe Pipe Pipe Widening Widening 3x1.0 3x1.0 3x1.0 3x1.0
7 - 347.009 - 347.009 Box Pipe Box Pipe Widening Widening 2.5x1.5 2X1.0 2.5x1.5 2X1.0
8 - 347.414 - 347.414 Box Pipe Box Pipe Widening Widening 2.5x1.5 2X1.0 2.5x1.5 2X1.0
9 - 349.292 - 349.292 Box Box Box Box Widening Widening 1.5x1.5 1.5x1.5 1.5x1.5 1.5x1.5
10 - 351.498 - 351.498 Box Box Box Box Widening Widening 1.5x1.5 1.5x1.5 1.5x1.5 1.5x1.5
11 - 351.756 - 351.756 Box Box Box Box Widening Widening 1.5x1.5 1.5x1.5 1.5x1.5 1.5x1.5
12 - 359.360 - 359.360 Box Box Box Box Widening Widening 2.75x1.5 2.75x1.5 2.75x1.5 2.75x1.5
13 - 359.461 - 359.461 Box Box Box Box Widening Widening 4.0x1.5 4.0x1.5 4.0x1.5 4.0x1.5
2.5x
14 - 360.521 - 360.521 Box Box Box Box Widening Widening 2.5x1.5 2.5x1.5 2.5x1.5
1.5
15 - 361.496 - 361.496 Box Box Box Box Widening Widening 1.5x1.5 1.5x1.5 1.5x1.5 1.5x1.5
16 - 362.110 - 362.110 Box Box Box Box Widening Widening 1.5x1.5 1.5x1.5 1.5x1.5 1.5x1.5
17 - 362.340 - 362.340 Box Pipe Box Pipe Widening Widening 2.5x1.5 2x1.0 2.5x1.5 2x1.0
18 - 365.689 - 365.689 Box Box Box Box Widening Widening 1.5x1.5 1.5x1.5 1.5x1.5 1.5x1.5
19 - 366.104 - 366.104 Box Box Box Box Widening Widening 1.5x1.5 1.5x1.5 1.5x1.5 1.5x1.5
20 - 366.717 - 366.717 Box Box Box Box Widening Widening 1.5x1.5 1.5x1.5 1.5x1.5 1.5x1.5
21 - 367.267 - 367.267 Box Box Box Box Widening Widening 1.5x1.5 1.5x1.5 1.5x1.5 1.5x1.5
Six laning and Strengthening of Km. 340.000 to Km. 403.400 B-1
Haveri-Hubli section of NH-4 in the state of Karnataka
Design Type of Structure Span Arrangement
Existing Existing Design Recommendation
Sr.No. CD Existing Proposed Existing Proposed
CD No. Chainage Chainage
No. LHS RHS LHS RHS LHS RHS LHS RHS LHS RHS
22 - 368.277 - 368.277 Box Box Box Box Widening Widening 1.5x1.5 1.5x1.5 1.5x1.5 1.5x1.5
23 - 369.153 - 369.153 Box Box Box Box Widening Widening 1.5x1.5 1.5x1.5 1.5x1.5 1.5x1.5
24 - 369.788 - 369.788 Box Box Box Box Widening Widening 1.5x1.5 1.5x1.5 1.5x1.5 1.5x1.5
25 - 370.080 - 370.080 Box Box Box Box Widening Widening 4.0x1.5 4.0x1.5 4.0x1.5 4.0x1.5
26 - 370.391 - 370.391 Box Box Box Box Widening Widening 1.5x1.5 1.5x1.5 1.5x1.5 1.5x1.5
27 - 371.997 - 371.997 Box Pipe Box Pipe Widening Widening 2.7x1.5 2x1.0 2.7x1.5 2x1.0
28 - 377.558 - 377.558 Box Pipe Box Pipe Widening Widening 3.2x1.5 2x1.0 3.2x1.5 2x1.0
29 - 377.883 - 377.883 Box Pipe Box Pipe Widening Widening (3.3x1.5) 4x1.2 (3.3x1.5) 4x1.2
30 - 379.310 - 379.310 Box Pipe Box Pipe Widening Widening (5.1x1.5) 3x1.0 (5.1x1.5) 3x1.0
31 - 381.240 - 381.240 Box Box Box Box Widening Widening 1.5x1.5 1.5x1.5 1.5x1.5 1.5x1.5
32 - 382.512 - 382.512 Box Box Box Box Widening Widening 1.5x1.5 1.5x1.5 1.5x1.5 1.5x1.5
33 - 383.182 - 383.182 Box Box Box Box Widening Widening 1.5x1.5 1.5x1.5 1.5x1.5 1.5x1.5
34 - 383.372 - 383.372 Box Box Box Box Widening Widening 2.25x1.5 2.25x1.5 2.25x1.5 2.25x1.5
35 - 383.716 - 383.716 Box Box Box Box Widening Widening 1.5x1.5 1.5x1.5 1.5x1.5 1.5x1.5
36 - 386.569 - 386.569 Box Pipe Box Pipe Widening Widening 1.5x1.5 1x1.0 1.5x1.5 1x1.0
37 - 386.851 - 386.851 Box Pipe Box Pipe Widening Widening 1.5x1.5 1x1.0 1.5x1.5 1x1.0
38 - 387.613 - 387.613 Box Box Box Box Widening Widening 1.5x1.5 1.5x1.5 1.5x1.5 1.5x1.5
39 - 387.820 - 387.820 Box Box Box Box Widening Widening 1.5x1.5 1.5x1.5 1.5x1.5 1.5x1.5
40 - 388.679 - 388.679 Box Box Box Box Widening Widening 1.5x1.5 1.5x1.5 1.5x1.5 1.5x1.5
41 - 389.106 - 389.106 Pipe Box Pipe Box Widening Widening 2x1.0 2.25x1.5 2x1.0 2.25x1.5
42 - 389.296 - 389.296 Box Box Box Box Widening Widening 1.5x1.5 1.5x1.5 1.5x1.5 1.5x1.5
43 - 389.657 - 389.657 Box Box Box Box Widening Widening 1.5x1.5 1.5x1.5 1.5x1.5 1.5x1.5
44 - 389.844 - 389.844 Pipe Box Pipe Box Widening Widening 2x1.0 2.22x1.5 2x1.0 2.22x1.5
45 - 392.065 - 392.065 Box Box Box Box Widening Widening 5.25x1.5 5.25x1.5 5.25x1.5 5.25x1.5
46 - 392.906 - 392.906 Pipe Pipe Pipe Pipe Widening Widening 2x1.0 2x1.0 2x1.0 2x1.0
47 - 393.395 - 393.395 Pipe Box Pipe Box Widening Widening 2x1.0 2.25x1.5 2x1.0 2.25x1.5
Design Type of Structure Span Arrangement
Existing Existing Design Recommendation
Sr.No. CD Existing Proposed Existing Proposed
CD No. Chainage Chainage
No. LHS RHS LHS RHS LHS RHS LHS RHS LHS RHS
48 - 395.790 - 395.790 Pipe Box Pipe Box Widening Widening 1x1.0 1.5x1.5 1x1.0 1.5x1.5
49 - 396.207 - 396.207 Box Box Box Box Widening Widening 2.5x1.5 2.5x1.5 2.5x1.5 2.5x1.5
50 - 396.409 - 396.409 Box Box Box Box Widening Widening 2.21x1.5 2.21x1.5 2.21x1.5 2.21x1.5
51 - 396.449 - 396.449 Box Box Box Box Widening Widening 1.5x1.5 1.5x1.5 1.5x1.5 1.5x1.5
52 - 398.902 - 398.902 Box Pipe Box Pipe Widening Widening 2.25x1.5 2x1.0 2.25x1.5 2x1.0
53 - 399.154 - 399.154 Box Box Box Box Widening Widening 1.5x1.5 1.5x1.5 1.5x1.5 1.5x1.5
54 - 399.199 - 399.199 Box Box Box Box Widening Widening 1.5x1.5 1.5x1.5 1.5x1.5 1.5x1.5
55 - 399.319 - 399.319 Box Pipe Box Pipe Widening Widening 4x1.5 3x1.0 4x1.5 3x1.0
56 - 399.902 - 399.902 Box Box Box Box Widening Widening 1.5x1.5 1.5x1.5 1.5x1.5 1.5x1.5
57 - 401.131 - 401.131 Pipe Pipe Pipe Pipe Widening Widening 1x1.0 1x1.0 1x1.0 1x1.0
58 - 402.576 - 402.576 Box Box Box Box Widening Widening 2.75x2.45 2.75x2.45 2.75x2.45 2.75x2.45
59 - 403.035 - 403.035 Pipe Pipe Pipe Pipe Widening Widening 2x1.2 2x1.2 2x1.2 2x1.2
# 1. Necessary repairs to existing structures shall be carried out in consultation with Independent Engineer.
2. Necessary Widening, repairs and rehabilitation as per requirement for all the existing culverts on the project highway, whether listed and specified exclusively in schedules or not,
shall constitute within the scope of the project.
3. Cross drainage structures listed in schedules are bare minimum. Actual size and number of such structure may increase based on detailed hydraulic study. Any such changes does not
constitute change of scope and shall be treated within the scope of work.
4.The width of the culverts to be taken as per the highway cross section requirement and widened accordingly.
Appendix B-VIII
Minor
A New Construction of Minor Bridges Bridges
Nil
B Rehabilitation/Repair/Widening of Existing Minor Bridges on Main Carriageway
Note:
# 1. If any cross drainage structure found to be inadequate in the detailed hydraulic studies, additional vents/ spans shall need to be provided. This does not constitute any
change of scope, moreover any change in length observed shall also not constitute any change of scope.
2. If existing structure have RCC railing on either side of carriageway, the same shall need to be replaced with RCC Crash barrier. This does not constitute any change of
scope.
3. If any existing structure during detailed investigations is found structurally unsafe to cater design loads as per current applicable code, the same shall need to be
reconstructed / rehabilitated to make it safe to carry design loads. This does not constitute any change of scope.
4. Necessary pedestrian crossing arrangements up to 5m wide shall be made under minor bridges to facilitate pedestrian and cattle crossing during dry season.
5. Necessary repairs to existing structures shall be carried out as mentioned above but not limited to, in consultation with Independent Engineer
C Rehabilitation/Repair/Widening of Existing Minor Bridges on Service Road
Existing Existing Type of Structure
Sr. Span Details of
Location Side Carriage Total Details of Repair/ Rehabilitation
No. Arrangement Foundation Substru Superstructure Widening
way Width cture
Simply Repair & Rehabilitation measures shall be carried out as -
LHS 2 X 6.1 +1 X Wall per Manual of Specification and shall not be limited to
1 355.164 7.5 11 Open Supported
SR 6.25 (RCC) the following:
RCC solid slab Redecking
RHS Existing wearing coat to be removed and new for 10.2m
2 392.501 7.0 9 1 X 8.9 Raft Wall RCC Integral bituminous WC shall be laid width and
SR
RHS Wall Exposed reinforcement to be repaired. widening
3 394.832 7.0 8.1 1 X 6.1 Open Stone Arch
SR (stone ) Approach slab shall be reconstructed on both sides
RHS Wall
4 401.717 6 7 1 X 4.8 Open Stone Arch Existing pitching on both sides shall be removed
SR (stone )
and new pitching with in proper quadrant shall be
constructed.
RHS Wall
5 401.864
SR
7.0 7.70 1 X 9.5 Open
(stone )
RCC T-Beam Existing drainage spout shall be cleaned and made
functional.
Vegetation from the vent way shall be removed.
# - . If any cross drainage structure found to be inadequate in the detailed hydraulic studies, additional vents/ spans shall need to be provided. This does not constitute any
change of scope, moreover any change in length observed shall also not constitute any change of scope.
Necessary repairs to existing structures shall be carried out as mentioned above but not limited to, in consultation with Independent Engineer.
Note:
# 1. If any cross drainage structure found to be inadequate in the detailed hydraulic studies, additional vents/ spans shall need to be provided. This does not constitute any
change of scope, moreover any change in length observed shall also not constitute any change of scope.
2. If existing structure have RCC railing on either side of carriageway, the same shall need to be replaced with RCC Crash barrier. This does not constitute any change of
scope.
3. If any existing structure during detailed investigations is found structurally unsafe to cater design loads as per current applicable code, the same shall need to be
reconstructed / rehabilitated to make it safe to carry design loads. This does not constitute any change of scope.
4. Necessary pedestrian crossing arrangements up to 5m wide shall be made under minor bridges to facilitate pedestrian and cattle crossing during dry season.
5. Necessary repairs to existing structures shall be carried out as mentioned above but not limited to, in consultation with Independent Engineer
Note:
# 1. . If any cross drainage structure found to be inadequate in the detailed hydraulic studies, additional vents/ spans shall need to be provided. This does not constitute
any change of scope, moreover any change in length observed shall also not constitute any change of scope.
2. Necessary pedestrian crossing arrangements up to 5m wide shall be made under minor bridges to facilitate pedestrian and cattle crossing during dry season.
Appendix B-IX
Major Bridges
Nil
* Final width of Deck after widening shall not be less than 15.2m
# 1. If any cross drainage structure found to be inadequate in the detailed hydraulic studies, additional vents/ spans shall need to be provided. This does not constitute any change
of scope.
2. If existing structure have RCC railing on either side of carriageway, the same shall need to be replaced with RCC Crash barrier. This does not constitute any change of scope.
3. If any existing structure during detailed investigations is found structurally unsafe to cater design loads as per current applicable code, the same shall need to be reconstructed
/ rehabilitated to make it safe to carry design loads. This does not constitute any change of scope.
(b) Details of Major Bridges to be retained with repairs
Location
Span Arrangement
Design Chainage
S. No.
Deck width
Repair and Rehabilitation Measures
(m)
(Km)
Chainage (No. x Length m)
Note ; # 1. .If any cross drainage structure found to be inadequate in the detailed hydraulic studies, additional vents/ spans shall need to be provided. This does not
constitute any change of scope, moreover any change in length observed shall also not constitute any change of scope.
2. If existing structure have RCC railing on either side of carriageway, the same shall need to be replaced with RCC Crash barrier. This does not constitute any
change of scope.
3. If any existing structure during detailed investigations is found structurally unsafe to cater design loads as per current applicable code, the same shall need to
be reconstructed / rehabilitated to make it safe to carry design loads. This does not constitute any change of scope.
4. Necessary repairs to existing structures shall be carried out in consultation with Independent Engineer.
(c) New 3 Lane Bridge parallel to the Existing Major Bridge on Right hand side
# 1. If any cross drainage structure found to be inadequate in the detailed hydraulic studies, additional vents/ spans shall need to be provided.
This does not constitute any change of scope.
National Highways Authority of India Schedule B
Appendix B-X
The major bridge at km 345.573 on Haveri bound carriageway is 2-lane and shall not
be widened.
At-grade Junctions
Sl. Junction
Chainage Side Improvement Tpye
No. Type
1 340.917 RHS X Vehicular Underpass
2 343.09 LHS T Cross road to be connected to service road
3 344.35 LHS T LVUP
4 344.35 RHS T LVUP
5 345.175 RHS T Cross road to be connected to service road
LHS &
6 346.51 X LVUP
RHS
7 347.621 LHS T Cross road to be connected to service road
8 348.025 RHS T Cross road to be connected to service road
LHS &
9 348.4 T Vehicular Underpass
RHS
10 352.257 LHS T Cross road to be connected to service road
11 353.15 LHS T Cross road to be connected to service road
12 354.078 LHS T Cross road to be connected to service road
13 354.078 RHS T Cross road to be connected to service road
14 354.777 LHS T Cross road to be connected to service road
15 354.777 RHS T Cross road to be connected to service road
LHS &
16 356.335 Flyover Flyover
RHS
17 356.85 LHS T Cross road to be connected to service road
18 357.185 LHS T Cross road to be connected to service road
LHS and
19 358.55 LVUP
RHS
20 360.985 RHS T Cross road to be connected to service road
21 361.302 LHS T Cross road to be connected to service road
22 361.39 LHS T Cross road to be connected to service road
23 361.9 LHS T Cross road to be connected to service road
Sl. Junction
Chainage Side Improvement Tpye
No. Type
24 362.82 RHS T Cross road to be connected to service road
LHS &
25 363.573 Flyover Flyover
RHS
26 364 LHS T Cross road to be connected to service road
27 364.275 LHS T Cross road to be connected to service road
28 364.5 LHS T Vehicular Underpass
29 364.5 RHS T Vehicular Underpass
30 364.73 LHS T Cross road to be connected to service road
31 365.308 LHS T Cross road to be connected to service road
32 367.1 RHS T Cross road to be connected to service road
33 367.7 RHS T Cross road to be connected to service road
34 367.75 LHS T Cross road to be connected to service road
35 369.1 LHS T Cross road to be connected to service road
36 369.647 RHS T Cross road to be connected to service road
37 371.472 RHS T Vehicular Underpass
38 371.472 LHS T Vehicular Underpass
39 374.472 LHS T Cross road to be connected to service road
40 374.91 RHS X Vehicular Underpass
41 375.473 LHS T Cross road to be connected to service road
42 376.89 LHS T Cross road to be connected to service road
43 377.448 RHS T Cross road to be connected to service road
44 378.825 RHS T Vehicular Underpass
45 379.5 LHS T Cross road to be connected to service road
46 382.236 LHS T Cross road to be connected to service road
47 382.236 RHS T Cross road to be connected to service road
48 382.53 RHS T Cross road to be connected to service road
49 384.6 LHS T Vehicular Underpass
50 384.6 RHS T Vehicular Underpass
51 384.741 LHS T Cross road to be connected to service road
52 385.614 LHS X Vehicular Underpass
53 386.04 RHS T Cross road to be connected to service road
Sl. Junction
Chainage Side Improvement Tpye
No. Type
54 386.352 LHS T Cross road to be connected to service road
55 388.17 RHS T Cross road to be connected to service road
56 388.698 LHS T Cross road to be connected to service road
57 390.451 LHS T Cross road to be connected to service road
58 390.95 LHS T Vehicular Underpass
59 390.95 RHS T Vehicular Underpass
60 391.216 RHS T Cross road to be connected to service road
61 391.76 RHS T Cross road to be connected to service road
62 391.85 LHS T Cross road to be connected to service road
Vehicular
63 392.6 RHS Vehicular Underpass
Crossing
64 392.6 LHS T Vehicular Underpass
65 393.115 LHS T Cross road to be connected to service road
66 394.985 LHS T Cross road to be connected to service road
67 395.315 RHS T Cross road to be connected to service road
68 395.942 LHS T Cross road to be connected to service road
69 395.942 RHS T Cross road to be connected to service road
70 397.52 LHS T Cross road to be connected to service road
71 397.535 RHS T Cross road to be connected to service road
72 399.205 RHS T Cross road to be connected to service road
73 399.45 LHS T Cross road to be connected to service road
74 400.015 LHS T LVUP
75 400.015 RHS T LVUP
76 400.835 LHS T Vehicular Underpass
77 402.2 RHS T Cross road to be connected to service road
78 403.079 LHS T Cross road to be connected to service road
Note: Improvement of any additional junction shall not be treated as change of scope.
Appendix B-XII
-NIL-
Appendix B-XIII
Overpass
-NIL-
Appendix B-XIV
Drainage
2. Improvement for draining out water at the structure, toll plaza, rest areas, bus
bay/truck lay bye shall be carried out, wherever necessary.
Appendix B-XV
Retaining Structure
Drain cum Retaining wall
shall be provided at all
locations wherever it is
required to Accommodate TCS
1 with in proposed ROW given
in Appendix B-I. These shall be
provided at following locations
as minimum.
RHS
From To Length
341780 343260 1480
343320 343360 40
343500 343600 100
343800 344060 260
344880 344980 100
346800 346860 60
347300 347360 60
347400 347800 400
348860 348900 40
348940 349060 120
349140 351000 1860
351300 351360 60
351460 351500 40
351600 351660 60
351720 351780 60
353320 353500 180
354760 355260 500
355480 355680 200
356760 356860 100
357200 357260 60
357300 357360 60
357740 357860 120
359060 359660 600
360320 360400 80
360440 360960 520
361020 361300 280
361360 361480 120
361940 361980 40
364800 365820 1020
366620 366960 340 366020
367220 367220 0 366440
368120 368820 700 367200
369120 369280 160 368120
369380 369440 60 370100
RHS LHS
From To Length From To Length
369580 370680 1100 371860 371880 20
372300 372380 80 371980 372040 60
372860 373060 200 372260 373080 820
373160 374500 1340 373220 373240 20
376320 376780 460 373580 373720 140
377120 378320 1200 375520 375560 40
379200 379460 260 375760 376100 340
381100 381260 160 376220 376580 360
381440 381620 180 376700 376940 240
382780 384040 1260 377020 377060 40
386500 386640 140 377100 377340 240
387520 387640 120 377400 378320 920
388580 391540 2960 379200 379460 260
392840 393060 220 380220 380240 20
393800 394120 320 380280 380320 40
394320 394560 240 380360 380420 60
394820 395200 380 380460 380480 20
395340 395800 460 381460 381600 140
395940 396360 420 381820 381960 140
396880 397140 260 382780 383140 360
398940 399080 140 383180 383200 20
402180 402300 120 384000 384040 40
402540 402820 280 386520 386780 260
403020 403400 380 386820 386960 140
387860 387920 60
388040 388140 100
388680 389040 360
389660 389720 60
392400 392420 20
392480 392500 20
392920 392940 20
392980 393120 140
393160 393200 40
393280 394200 920
394420 394680 260
394840 394880 40
394940 394980 40
395020 395200 180
395240 395920 680
396020 396600 580
396880 397200 320
RHS LHS
From To Length From To Length
397240 397280 40
397860 398360 500
398440 398460 20
398540 398620 80
398660 398680 20
398880 399080 200
400260 400300 40
402180 402320 140
402500 402540 40
402680 402700 20
PROJECT FACILITIES
1 Project Facilities
The Concessionaire shall construct the Project Facilities in accordance with the provisions
of this Agreement. Such Project Facilities shall include:
(a) Toll plaza;
(i) Ambulance;
1 Project Facilities
The Concessionaire shall construct the Project Facilities described in this Annex-I to
form part of the Six-Lane Project Highway. The Project Facilities shall include:
(a) Toll plaza;
(i) Ambulance;
No new toll plaza shall be constructed. Existing toll plaza shall be upgraded as
per specifications and Schedule D.
Location
Tolling
S. Tolling Existing Design Toll
Section Remarks
No. Section Chainage, Chainage, Lanes
Length, km
Km Km
6+1
1 Haveri - Hubli 63 352.550 352+550 Existing
Lanes
Street Lighting
Pedestrian concrete guard rails shall be provided at LHS and RHS in between MCW and
Service Roads at the following locations as minimum.
Chainage
From To
354750 354850
362700 363100
384850 385400
386000 386500
392400 392800
In addition to the above locations, 200 m guard rail shall be provided at each location of bus
bays/bus shelters.
]Appendix C-IV
Truck Laybyes
-T LL T F T
[ 'F '[F
E L
r i
[E E
Rest Areas
Rest area to be provided at km 353.700 (LHS) and km 402.300 (RHS).
SCHEDULE - D
(See Clause 2.1)
The Concessionaire shall comply with the Specifications and Standards set forth in
Annex- I of this Schedule-D for construction of the Six-Lane Project Highway.
S. Clause
Details of Items Description of Deviation
No. No.
1 2.10 Lateral & Vertical The Lateral & Vertical Clearance for
Clearance for Existing Existing
Vehicular/ Vehicular/ Pedestrian/Cattle
Pedestrian/Cattle Underpasses/Cattle Pass cum Drain shall be
Underpasses/ Cattle kept the same, which is not as per Manual of
Pass cum Drain Specification
2 2.10.2 Vertical Clearance Vertical Clearance for LVUP shall be
provided as specified in Schedule B.
3 2.17 Typical Cross Section Typical Cross Section shall be followed as
specified in Schedule-B.
4 7.19 Proposed Underpasses Modify the sub-clause as below:
Width of Proposed underpasses shall be
provided as specified in Schedule B.
5 7.3 Width of Existing The existing total width as mentioned in
Minor Bridges Schedule A for Minor Bridges, and which are
not proposed for widening in Schedule B
shall be kept the same. This deviates from the
structure configuration specified in Manual
of Specification.
6 7.3 Width of Major Bridge The existing major bridge (km 345.573) on
RHS is having 7.5 m wide carriageway, 1.5
m wide footpath as mentioned in Schedule A,
shall not be widened.
7 7.3 Width of Proposed Proposed width of Minor Bridge shall be as
Minor Bridges specified in Schedule B.
S. Clause
Details of Items Description of Deviation
No. No.
8 7.19 Width of Existing The existing total width as mentioned in
Flyovers/Underpasses Schedule A for Flyovers/Underpass shall be
kept the same which deviates from the
structure configuration specified in Manual
of Specification.
9 10.4.10 Toll Plaza All Lanes of the Toll Plaza shall be provided
with system of payment through Electronic
Toll Collection (ETC) with additional
provision for Manual Toll Collection.
10 11.1 Landscaping and Tree The Landscaping and Tree Plantation as
Plantation mentioned in Clause 2.5 of Schedule “C”
shall not be in the scope of the
concessionaire. This shall be executed by
National Green Highways Mission.
11 - Aggregates Flakiness and Elongation Index of
aggregates
shall be maintained as per standards using
suitable machinery without any additional
cost.