Project
Shell Project No: HP-3000-QAT
Project Document Number: T- 4.234.578
2MH127
Tag/Item Number(s):
N/A
Unit(s):
ASU
PCWBS:
T-4.234.578 Rev. B
LINDE ENGINEERING
5887
Page 2 of 8
Page 2 of 8
QATAR SHELL GTL PROJECT (PEARL)
C2 AIR SEPARATION UNITS CONSTRUCTION
25.06.08
FB
EO
AG
RFC
14.05.08
FB
AB
AG
CCI
02.02.08
IU
UA/MC
ZG
ICC
31.01.08
BR
UA/MC
ZG
IFR
27.01.08
SB
UA/MC
ZG
IIR
Date
Description
GAMA
Rev.
No.
Project
Rev
No.
Status
Document Title:
LINDE ENGINEERING
AG
Contractor
GAM
ITP
QAC
GTL
027
Org.
Code
Doc.
Type
Disc.
Code
Geogr.
Area
Seq.
No
Rev.
No
T-4.234.578 Rev. B
LOC 470
Vendor Code
Rev No: B
Page 3 of 8
Q A T A R
1.0
Before pre-casting,
bottom surface
preparation
Doc. Title
Doc No
GAM-ITP-QAC-GTL-027 Rev. E
b) Cleanliness
d. Length of bars
2.0
b) Preservation of
rebar
T-4.234.578 Rev. B
25.06.08
a) Level
a. Material
a) Re bar Work
Date:
Visual Inspection
Site
Engineer
R
R
As per drawings
Visual Inspection
Visual
As per specification
As per Drawing
As per drawing
Test Certificate
As per drawing
QA/QC
INSPECTOR
&
Site Engineer
GAM-QCR-QAC-GTL-014
e. Hook
f. Bending
g. Reinforcement surface
Visual
GAM-QCR-QAC-GTL-014
DEP 34.19.20.31
Visual
I
Site Engineer
Visual Inspection
Page 4 of 8
ACI
Q A T A R
Doc. Title
Doc No
GAM-ITP-QAC-GTL-027 Rev. E
Date:
25.06.08
a. Cleanliness
d. Chamfer
e. Form oil
STANDARD
DRAWINGS
ACI 117, 301, AND 347
;T.13.377.360E
QC & Site
Engineer
Visual
GAM-QCR-QAC-GTL-006
GAM-QCR-QAC-GTL010/012/013/014
Wax spray
Visual
f. Dimension checked
As Per Drawing
GAM-QCR-QAC-GTL-014
Visual
GAM-QCR-QAC-GTL-011
As per LS 443-01
Test Certificate
VISUAL
a)
4.0
5.0
Cleaning of form
work and rebar
T-4.234.578 Rev. B
Material
As per drawings
;T.13.377.360E
Site Engineer
& QA/QC
INSPECTOR
T-13.376.358 DEP34.19.20.31
Site Engineer
Page 5 of 8
Q A T A R
Doc. Title
Doc No
GAM-ITP-QAC-GTL-027 Rev. E
PRECAST
Concreting
7.0
Curing
8.0
c) Concrete compaction
Date:
25.06.08
T-13.376.358 DEP34.19.20.31
;T.13.377.360E
BS 8110 (T.4.132.872)
T-13.376.358 DEP34.19.20.31
;T.13.377.360E
T-13.376.358 DEP34.19.20.31
;T.13.377.360E
Site Engineer
& QA/QC
INSPECTOR
d) Concrete Finish
Curing Data Sheet contains
1) Date of pour
2) End of Curing
3) Acknowledgment of water
placement daily
T-13.376.358 DEP34.19.20.31;
T.13.377.360E
Site Engineer
T-13.376.358 DEP34.19.20.31
;T.13.377.360E
Site Engineer
2) Bolt positions
c. Proper repair
d. Surface preparation
& Release
T-4.234.578 Rev. B
VISUAL
By Vibrators
VISUAL
VISUAL
GAM-QCR-QAC-GTL-015
GAM-QCR-QAC-GTL-015
I
Visual inspection
b. Authorization to repair
Repair of Concrete
As Per Drawing
a. Identification of repair
9.0
GAM-QCR-QAC-GTL 009/010/012/014
1) External Dimensions
T-13.376.358
DEP-34.19.20.31
;T.13.377.360E
QA/QC
Inspector &
Site Engineer
Visual inspection
As per approved
Repair procedure
GAM-QCR-QAC-GTL-010
Visual inspection
As per Manufacturers
recommendation
GAM-QCR-QAC-GTL-031
Page 6 of 8
Q A T A R
Doc. Title
Doc No
GAM-ITP-QAC-GTL-027 Rev. E
25.06.08
a. Ground condition
T-13.376.490
Compliance with
Compaction &level
Requirements
Visual
Drawings
GAM-QCR-QAC-GTL-006
c. Surface inspection
T-13.376.358 DEP34.19.20.31&
T.13.377.360E
Visual
S
S
Visual
GAM-QCR-QAC-GTL-013
d. Cleaning of foundation
10.0
Date:
Lean Concrete
f. Thickness
T-13.376.358
DEP-34.19.20.31
50 mm Minimum
GAM-QCR-QAC-GTL-013
g. Curing
Visual
GAM-QCR-QAC-GTL-031
RFC Drawing
Visual
RFC Drawing
GAM-QCR-QAC-GTL-011
RFC Drawing
After Completion of Curing
Period with GAM-QCRQAC-GTL-015
I
W
h. Coating
Level
QCI
Plumb
11.0
Orientation
Installation
Anchor Bolts
Location
Transportation for installation
T-4.234.578 Rev. B
Site Engineer
As Per RFC Drawing
As Per RFC Drawing & DEP34.19.20.31
Page 7 of 8
Q A T A R
Doc. Title
Doc No
GAM-ITP-QAC-GTL-027 Rev. E
Temperature
Testing
a) Fresh concrete
Slump Test
Frequency – 1 Test for 1 mix
T-13.376.358
DEP-34.19.20.31
T-13.376.358
DEP-34.19.20.31
Date:
Laboratory
Laboratory/
Supplier
12.0
T-4.234.578 Rev. B
GAM-QCR-QAC-GTL-017
I
S
Lab Report
GAM-QCR-QAC-GTL-017
S/R
S/R
Laboratory
Report/Supplier GAMQCR-QAC-GTL-020
S/R
Water Absorption
Maximum 4% at 28
And 48 days
Laboratory
Report/Supplier GAMQCR-QAC-GTL-019
Laboratory
Report/Supplier GAMQCR-QAC-GTL-018
Laboratory
Report/Supplier
Volume of permeable voids
Maximum 4% at 28
And 48 days
Laboratory
Report/Supplier
Laboratory
Report/Supplier
Maximum 0.10% by
Weight of cement
Chloride content
b) Hardened
concrete
25.06.08
Sulphate content
T-13.376.358
DEP-34.19.20.31
Laboratory
Maximum 4% by
Weight of cement
Page 8 of 8