Tank 1170x660 1
Flashing 2200 4
Flashing 1020 2
¾ M to F elbow ¾ 1
- Sheet floor and sides of bund (ensure joins of floor sheets are on centre of floor joist and leave a
5mm gap to weld between them to ensure penetration) pic 4
- Weld out bund and frame (stitch weld under side of floor pan first) pic 7
- Fit swaged 50x50 pegs to frame using setting tool and weld out pic 8
- Clean spatter and remove any sharp edged ready for paint
- Cut floor mesh to suit and fit hold down brackets/screws pic 8
-assemble portals on jig table (ensure to mark top centre on noses whilst on jig) Refer to drawing pic
10
- Once bund has dried, set up bund on stands and make level (must have level base to start)
- Fit portals to base and level up portals and fit temporary 30x30 braces pic 11
- Clamp 75x50RHS to side of portal uprights to ensure sides are straight in line pic 12
- Screw off portals to pegs
- Fit first 2 roof sheets together on ground, then lift up and fit to top of portals (ensure the join is
centred in portals and there is 150 mm of overhang on front and back) pic 13
- Remove temporary bracing
- Fit roller door tracks/guide (cut roller door tracks 50mm lower to topside of rubber bump stop than
the door opening) eg- if door opening is 2000mm, cut track at 1950 from bump stop.
- Fit roller door bracket (1910mm to underside of bracket and centred on post) pic 14
- Fit roller door -REFER TO Roller door PROCEDURE
- fit locking mechanism too door, metal stops and plastic guide inserts.
- Transfer marks from plastic guide to tracks while door is in a closed position.
Mark out holes, then drill out and finish off with die grinder.
- Attach locking arms. Ensure door locks and unlocks with keys at least 3 times.
- Hang keys on inside of shed on a screw so they won’t be lost
- trim excess pipe from roller door axle
- finish roof sheets and screw off
- Fit gable sheets to rear and front of shed (they should be cut first using the templates and nibbler) pic
15