Vous êtes sur la page 1sur 77

installation Instructions Bullefin 378320

Revision B
Tv~e
202680
Ground Mount Assembly
and T Y P ~2030304 Antenna Kit
#
ANDREW,
for 3.7-Meter Earth Station Antennas
Section I
Type 202680-( ) Ground Mount Assembly
1.0 Introduction 2.3 Carefully raise entire ground mount assembly and
I.IType 202680-( ) Ground Mount Assembly is a galva- attach to corresponding foundation anchor bolts using 314
nized steel elevation-over-azimuth pedestal mount opti- in. flat washers and nuts. Note: Ground mount positioning
mized for geostationary satellite applicatons in the Ku fre- on foundation is dependent upon predetermined azimuth
quency band. The elevationlazimuth mount design simpli- viewing requirements.
fies installation and minimizes foundation requirements
while enabling horizon-to-horizon coverage from any 2.4 Position and mount 203112 azimuth strut weldment to
worldwide location. ground mount assembly as shown using 314 by 1-112 in.
bolts, lock washers and nuts. Note: Mounting position of
1.2 The ground mount assembly enables 180" positioning azimuth strut weldment is dependent upon predetermined
for selected azimuth viewing. Azimuth range coverage is azimuth range requirements as shown in Figure 1-1, top
plus or minus 90" divided into three 120" continuous view.
ranges with 30" overlap. Elevation adjustment is continu-
ous from 0" to 90". 2.5 Loosely install supplied 112 by 1-112 in. setscrews in
azimuth and elevation strut supports; 314 by 2 in. A-325
Read the Instructions bolts, flat washers and nuts in ground mount angle assem-
Thoroughly Before Assembly blies; and 314 by 3-314 in. bolt, lock washer and nut in
azimuth strut weldment for future use. Note: Type 202951
2.0 Ground Mount Assembly azimuthlelevation strut kit is required and is supplied as
2.1 The following major assemblies are required to install part of 203030-( ) antenna kit.
the 3.7-meter ground mount. Check all assemblies before
beginning installation. Refer to parts list for detailed Type 202680-( ) Ground Mount Assembly
description. Parts List

Type No. Description Qty. Type No. Description Qty.

202680-( ) Ground Mount Assembly 1 Azimuth Strut Weldment 1


203112 Azimuth Strut Weldment 1 Hardware Kit, consists of:
202850 Hardware Kit 1 314" Lock Washer 8*
314" Hex Nut 17*
2.2 Refer to Figure 1-1. Carefully remove 202680-( ) 112 x 1-112" Set Screw 7*
ground mount assembly from packing crate. Securely 314" x 2" Bolt and Nut Assembly 3*
attach cranelhoist as shown using nylon sling. Note: Use 314" x 3-314" Hex Head Bolt 1
of a I-ton minimum capacity crane or hoist will be required 314" Flat Washer II*
for proper ground mount installation. 314" x 1-112 Hex Head Bolt 7*

Caution: Ensure brake assembly hardware is securely *Includes spare(s).


tightened (40-45 ft-lbs) before raising ground mount
assembly to prevent disengagement of panning frame
weldment from square tube weldment. Do not attempt
t o loosen brake assembly hardware during ground
mount assembly or while making azimuthlelevation
adjustments.
Bulletin 378258
Installation Instructions
Earth Station
Antenna Pointing
for 3.6- Thru 9.3-Meter Earth Station ~ 5 t e n n a s

1.0 Introduction 2.2 Some transponder signal may be observed above the
noise signal as shown in Figure 2.
1.1 This document provides adjustment information re-
quired during installation of the Earth Station Antenna
System. In addition, these same procedures are applica-
ble as a follow-on to any corrective maintenance where
readjustment and/or component replacement necessitates
checking and/or reestablishing system settings and adjust-
ments as well as antenna pointing information. Refer to
applicable motor drive installation drawings for further
information.

2.0 Acquiring A Satellite

2.1 While viewing the spectrum analyzer screen, a pure


noise signal as shown in Figure 1 will probably be
observed.

Figure 2. Minimum Transponder Signal


on Spectrum Analyzer
2.3 Manually move the antenna in azimuth (scanning
back-and-forth) to achieve the maximum (greatest ampli-
tude) transponder signals. Scan in one direction until the
amplitude continues to diminish and then scan in the
opposite direction until the same condition occurs. Return
to the position yielding the greatest amplitude. The maxi-
mum azimuth excursion from the original setting should
not exceed +I .5degrees or the antenna may begin to
access a different satellite. With the antenna positioned in
azimuth such that the transponder signals are maximized,
follow the same procedure manually moving the antenna
in elevation (scanning up and down) to further maximize
-
the transponder signals. Repeat this procedure alternating
Figure 1. Pure Noise Signal on Spectrum Analyzer between the azimuth and elevation excursions of the
antenna to peak the transponder signal amplitude. A
transponder signal amplitude of 30 dB or more from peak
to average noise signal indicates the antenna is receiving
the signal on the main beam. A transponder signal ampli-
tude less than 30 dB indicates the antenna is receiving the
signal on a side lobe of the main beam.
AZIMUTH AXlS
(WEST)
- ELEVATION AXIS
(DOWN)
UOMUTH
AXIS
IWES11

I
AZtMUTII
Ax15
IEAS11

\ \ \ \ \ \ I I I I-\\\\\\\\\HWIY
t
AZIMUTH AXlS
(EAST)

Figure 3. Antenna Radiation Pattern Topographical Diagram With Plan View


2.4 With the antenna peaked on a side lobe in azimuth 2.7 If the antenna is aligned in azimuth and elevation (sig-
andlor elevation (refer to Figure 3, position A), move the nal maximized) and 24 transponder signals (12 horizontal
antenna in azimuth while observing the spectrum analyzer and 12 vertical) are noted, the polarization adjustment is
screen. set incorrectly and must be modified. If 12 transponder
signals are noted, they may or may not be the properly
2.5 If the signal amplitude diminishes and does not polarized signals. Therefore, 24 transponder signals must
increase (position B) to the level noted when the antenna be visually noted in order to determine the proper polariza-
was peaked on the side lobe, the antenna is moving away tion setting.
from the main beam; reverse the direction of antenna
movement. From the original side lobe position (position 2.8 Rotate the feed assembly clockwise until 24 transpon-
A), the signal amplitude should now diminish to a null der signals are noted and of approximately equal amplitude
point at position C (minimum amplitude showing only sig- as shown in Figure 4. Note: It is more accurate and visual-
nal noise) and then symmetrically increase again to the ly easier to minimize the alternate set of transponder sig-
same level at position D as noted at position A. At the null nals rather than maximizing the transponder set of interest.
point (position C), the antenna is aligned with the alternate
(elevation) axis. If the antenna was peaked on a side lobe
in azimuth, it was appropriately aligned with the elevation
axis; proceed with paragraph 2.6. If the antenna was
peaked on a side lobe in elevation, it was appropriately
aligned with the azimuth axis; proceed with paragraph 2.6
moving the antenna in azimuth rather than elevation.

2.6 Move the antenna in elevation while observing the


spectrum analyzer screen. If the signal amplitude increas-
es, decreases and then increases again but to a lesser
value, the antenna is moving in the wrong direction;
reverse the direction of antenna movement. From the orig-
inal null point (position C), the signal level should increase
and decrease alternately but with increasing amplitude
until the transponder signal increases to a level of at least
30 dB at which time the antenna is receiving the transpon-
der signals on the main beam. Continue to manually peak
the signal to a maximum level using the azimuth and ele-
vation adjustments. Figure 4. Polarization at 45" from Optimum Setting
2.9 With all 24 transponder signals of approximately equal illustrates partial minimizing of the alternate transponder
amplitude appearing on the spectrum analyzer screen as signals.
shown in Figure 4, determine the specific antenna system
and satellite parameters noted in paragraph 2.8. Rotate 2.10 Figure 6 illustrates full minimizing of the alternate sig-
the feed assembly as required until the appropriate (odd nals; the desired result.
or even) transponder signals are maximized. Figure 5

Figure 5. Maximizing Odd Transponders Figure 6. Optimum Polarization Setting

Andrew Corporation
10500 West 153rd Street
Telephone: 708-349-3300
FAX (U.S.A.): 1-800-349-5444
.
Customer Service, 24 hours: U.S.A. Canada Mexico: 1-800-255-1479
U.K.: 0800 250055. Republic of Ireland: 1 800 535358
Prinled in U.S.A. 6/92
Orland Park, lL U.S.A. 60462 Internet: http://www.andrew.com Other Europe: +44 1592 782612 Copyright Q 1998 by Andrew Corporalion
- NOTICE are the property of ANDREW CORPORAVON A11 lnforrnat~oncontalned hereln wh~ch IS not known
These draw~ngs ond spec~f~catlons
generally In the field of ANDREW shall be conf~dent~al except t o any extent t o whtch ~t IS estoblrshed t o have been known prev~ouslyfrom sources
other than ANDREW These drawlngs and s p e c ~ f ~ c a t ~ om
w ~ t h o u twr~ttenperrnlsslon
n sa y n o t be reproduced, copled or used as the basls for the manufocture or sale of opporatus

Ln APPLICATION R E V I S I O N S
Ln NEXT ASSY USED ON MF REV DESCRIPTION DATE APPROVED
Ln
D R E L TO PRODUCTIOII 30APR91 MJ
m
-

Ccl

0
Z

3.6/3,7M S P L I T R E F L E C T O R
3.6M: 223100-0
3.7Mi 2 0 9 2 9 2 - 0
I N S T A L L A T I O I V INSTRUCTIOIVS

REVISION
STATUS
OF
SHEETS
- - - -
REVISIOIV - - -

SHEET Nn, 1 2 3 4 5 6 7
MATERIAL Fl N l S H

UNLESS OTHEWISE SPECIFIED DRAWN


T M M 13MAR91 ANDREW CORPORATION
DIMENSIONS ARE 2701 Moyh~llRood
IN INCHES CHECKE~
-- 21SEP89
JENhIINGS - Denton, Texas LJ i A 76208
-APPDENGRG MJT 30APR91 3,6/3,7M SPLIT
1 PLACE DECIMALS f
2 PLACE DECIMALS f
1
03
APPD ENGRG
REFLECTOR
3 PLACE DECIMALS f 010 APPD MFG I N S T A L L A T I O I I INSTRUCTIOIIS
ANGLE f 0 5'
APPD Q C SIZE FSCM NO DWG NO

-ALL SURFACES-SIMILAR TO A 84147 239555


COMMERCIAL TOL
APPLY TO STOCK SIZES SUPERSEDES DWG OF
. a 8 7 6 5 4 3 k- 239318 ("11 1 1
NOTES: ( u ~ ~ eiuramrr
~rs rr~crroj TENSIWING PROCEWRESi i - ~ P S
Y~IIOVMI FIEV~S~ONS
I n m IY 0- YO w -9 "F 20.1 Ic" OC~CIIPTIO*I 0.x LPS"O(*D
2 DI-D~S -I wmc -DIG I LUBRICATE TH~~CLIS WITH rim: var <ITCH r a ro a m u s r a j c r ~ o m
~ WT
I *marroar- mM 7,. %-leal
~ L L O YV ~ YNDC*
I ~ L L I WAS** REL TO PRODUCTION ZbAUG05 WF
E U r F R COltHTCTlOllC A R C O M R T T T O , TlG*TEH BOLTS YmlL SURFICFI M E l O l K D A (\OOED NOTE 4 . CAD 8 VAS ESOSONI
iiHO WTS lYLE SNUG. I?. TLIL ITFOR1 OF XIISON USING IRDINMl SPUD VltNCK
DO HOT PROCEED YI1H STEPS 3 L 4 BCLOY UmLIS 1°C CMICCIION I S TIM&. IF
ECH 0029.37 C L ~ ~ SAS 1BJ*NoT ?.':
PAB
Smrr MC LOOSENED AFTER STEPS 3 AND I . OSICD
I &NO SPLLCT VIIH NCY MID- B I 1 12. P/N 207912 VAS 207911. CHG STEP 2 TC. RF
VIPC REPEiiT ALL STEPS. ECH DD37.35 CLASS C bAPRO4 DAT
-
FIG C -
r16 D
1 Y*R WTI MD FHDP w BOLTS "IT" I T R A ~ G Y T LIME ITL F ~ G U R CC. BZrOIlF liTTCI)
TENSIONING TFNflONlNG
READ THE INSTRUCTlOIl: THOROUGHLY BEFORE ASSEMBLY. F O L L O V THE r l l O t l F H WLIIP FUIITWEI) W I T H LXTIIA LWB YRLWCY OP mYLD. V 4 M C H U H l l l NUTI
NOYFD 113 TYPH <I10.*11'> $EL ,!CARE D
SEQUENCES FOR PPOP'F A j l ' E U B L I AND OPEPATION

THIS VARNING INDlC&TES THAT F A l L l l R E TO FOLLOV THE PROPER


PROCEDURE AT THIS POINT COULD RESULT I N DAMAGE TO THE
ANTENNA AWO/OR OTHER PPOPERTI AND POSSIBLE INJURY TO -C T -F P .I
CAUT1oN PERSONNEL AFTER ALIGNING C L E V I S ASSEMBLIES IITEHS 2. 31. 32. 3 3 K 3 4 ) AND
C L E V I S ON JACK ASSEMBLIES [ITEM 3 5 K 3 6 ) TIGHTEN HARDVARE (ITEMS
4. 6.. 7 8 -~2 5 ) PER
- 11-325
~-~TENSIONING
- PROCEDURES.
- - ~ - JACK ASSEMBLY
~ - - O T E- H
~
36) I S USED FOR THE E L E V A T I O N JACK ON 3 7 HETRE APPLICATIONS V l i H
A SThNDARD ENCLOSURE. JACK ASSEMBLY (ITEM 3 5 1 AS HOWN I S USED
THl: ILIDICATES INFORHATION THAT
SHOULll BE PEAD BEFORE PROCEEDING
FOR A L L OTHER TYPICAL APPLICATIONS SEE CALLOUT .

GREISE THRUST PADS L PANNING FRAME SUPPORT PLATE SURFACE


CAREFULLY REHOVC XLL F A P T - FFOH SHIPPING BOXES THE CONTENTS
SHOULD CORRESPObID V l i Y THC ?APT? L I S T , a N r DAMAGE OR SHORTAGE
V l L L PREVENT SATI;F*':TORf *I:EIIBLI. INSTALLATION. AND OPERATION
OF THE ANTENNA

A
CAUTION:
BEFORE BEGINNING. :HUT OFF RF POWER

;:RhJ,",E, ~T;y~d~p;;~~so";T;:"EG.Bo';y'cR:NOUgH; : : CiR;'


EXPOSURE TO PCDIO FREUUENC~ENERGY THC ANTENNA MUST
BE TURNED OFF BEFORE ENTERING THE AREA I N FRONT OF THE
REFLECTOR AUQ NEAF FEED
w
I + -- 239106 ('1 ) ] 1

-
8 7 6 5 4 3
FlrVlEloNs
NOTES. (u- omm*u rprmnio)
I 1-UI-UDRUD- YI ZC+S RW -mO* OATE ] -"OW
L -m- -7 I Y n m REL TO PRODUCTION 29AUGBq VF
L-DUIOUl~".I)?UI
3 /WD ITEM ea. pm m7911 REV
a DELETED PIOX
SHEET 2 DCN. DOO327(B) ,my9L M,
A QTY (8) OF ITEMS 17 AND 19 ARE FOR 3 7 METRE ANTENNA FOUNDATIONS AND
QTY <8) OF ITEMS 15 AND 2 1 ARE FOR 4 5 / 4 6 METRE ANTENNA FOUNDATIONS
B HUDlFlED
VELDMENT
NOTE 6H WAS AZIMUTH STRUT
REVISED SHEET 2
DCN 0 0 0 9 7 7 < 8 > 20DE-5 S C & ~ J ~
C ITEM 2 WAS P / N 2 0 4 7 5 4
D DCN 0 0 1 2 6 4 < 8 ) l m m 9 7 ?b!&:

6 LUBRICATE ALL A 3 2 5 BOLT THREADS PRIOR TO ASSEMBLY

1 GROUND MOUNT ASSEMBLY


L
A) SEE FIGURE 1: CAREFULLY REMOVE P / N 208800 GROUND MOUNT ASSEMBLY FROM LOOSELY INSTALL SUPPLIED 0.875x2.25 IN. A - 3 2 5 BOLTS, FLATWASHERS AND
PACKING CRATE LEAVING STEEL STRAPPING INTACT TO PRECLUDE DISENGAGMENT NUTS FOR 4.5/4.6M ANTENNAS I N ELEVATION SUPPORT ANGLE ASSEMBLY OR
OF PANNING FRAME FROM SQUARE TUBE WELDMENT DURING GROUND MOUNT IN- 0.75x2.00 IN. A - 3 2 5 BOLTS. FLATWASHER AND NUTS FOR 3.7M ANTENNAS. THIS
STALLATION. SECURELY ATTACH CRANE/HOIST AS SHOWN USING NYLON SLING. HARDWARE ALONG WITH THE UPPER ELEVATION STRUT HARDWARE W I L L BE
N U E USE OF A 1 TON MINIMUM CAPACITY CRANE OR HOIST WILL BE REQUIRED ATTACHED TO THE ANTENNA AND TIGHTENED TO THE A 3 2 5 TENSIONING
FOR PROPER GROUND MOUNT INSTALLATION. PROCEDURE AT TIME OF ANTENNA INSTALLATION.

c 1 B>
t ENSURE BRAKE ASSEMBLY HARDWARE I S SECURELY TIGHTENED (40-45
FT-LBS) BEFORE RAISING GROUND MOUNT ASSEMBLY TO PREVENT DISENGAGE-
Z F PANNING FRAME WELDMENT FROM FROM SQUARE TUBE WELDMENT.

CAREFULLY RAISE ENTIRE GROUND MOUNT ASSEMBLY AND ATTACH TO CORRES-


PONDING FOUNDATION ANCHOR BOLTS USING 0.875 IN. FLATWASHER AND NUTS
LOOSELY INSTALL AZIMUTH AND ELEVATION PIVOTS WITH APPROPRIATE HARD-
WARE AS SHOWN. REMOVE ELEVATION STRUT MECHANICAL STOP BOLT ASSEMBLY.
LOOSEN STRUT SUPPORT SET SCREWS AND INSTALL 202835-2 AZIMUTH AND
3 3 3 8 5 - 5 ELEVATION STRUT ASSEMBLIES I N CORRESPONDING STRUT SUPPORTS
AS SHOVN. TEMPORARILY TIGHTEN A L L ELEVATION STRUT HARDWARE AND REIN-
FOR 4.5/4.6M FOUNDATION AND 0.75 FLATWASHERS AND NUTS FOR 3.7M FOUND- STALL PREVIOUSLY REMOVED MECHANICAL STOP BOLT ASSEMBLY.
ATION. REMOVE STEEL STRAPPING FROM GROUND MOUNT ASSEMBLY. NOTE, GROUND
MOUNT POSITIONING ON FOUNDATION I S DEPENDENT UPON PREDETERMINED ATTACH FORWARD PORTION OF AZIMUTH STRUT ASSEMBLY TO CORRESPONDING HOLE
AZIMUTH VIEWING REQUIREMENTS. TIGHTEN HARDWARE PER A-325 TENSIONING I N AZIMUTH TILLER ARM WELDMENT (ITEM 3) AS SHOWN. SNUG TIGHT JAM NUTS ON
PROCEDURE. AZIMUTH AND ELEVATION STOP COLLAR BOLTS (IT. 22). ALL REMAINING HARDWARE
TIGHTEN PER A - 3 2 5 TENSIONING PROCEDURE.
C) THE GROUND MOUNT ASSEMBLY ENABLES 180' POSITIONING FOR SELECTED
AZIMUTH VIEWING. AZIMUTH RANGE COVERAGE I S *YO' DIVIDED INTO THREE AFTER ANTENNA I S POINTED AT SATELLITE. TIGHTEN ALL AZIMUTH AND ELEVATION
120' CONTINUOUS RANGES WITH 30' OVERLAP. ELEVATION ADJUSTMENT I S SET SCREWS TO 3 5 FT.-LBS.
CONTINUOUS FROM 0 TO YO*.
POSITION AND MOUNT 2 0 4 7 3 7 AZIMUTH TILLER ARM WELDMENT TO GROUND
MOUNT ASSEMBLY AS SHOWN USING 0.75x1.75 IN. A-325 BOLTS AND NUTS.
TIGHTEN HARDWARE PER A - 3 2 5 TENSIONING PROCEDURE. MOUNTING
POSITION OF AZIMUTH TILLER ARM WELDMENT I S DEPENDENT UPON PRE-
DETERMINED AZIMUTH RANGE REQUIREMENTS AS SHOWN I N V I E W 'R' ON
SHEET 3.
D) APPLY SUPPLIED STICK LUBRICANT TO SET SCREW THREADS. LOOSELY INSTALL

STRUT SUPPORTS.
E) POSITION AND MOUNT 2 0 4 7 5 4 ELEVATION SUPPORT ANGLE ASSEMBLY TO GROUND
MOUNT AS SHOWN USING 0.50x1.75 IN. A-325 BOLTS, FLATWASHERS AND NUTS.
TIGHTEN HARDWARE PER A - 3 2 5 TENSIONING PROCEDURE.

TLk3IOAIYG PATE-I I - I P S YmDYLV1L

,-us6 FFLT WCP

'THE INSTALLATION, MAINTENANCE OR REUOVAL OF AN ANTENNA


REQUIRES OUALIFIED, EXPERIENCED PERSONNEL. ANDREV INSTALLATION
INSTRUCTlONS HAVE BEEN VRlTTEN AND ILLUSTRATED FOR SUCH
INSTALLATION PERSONNEL. ANTENNA SYSTEMS SHOULD BE INSPECTED
ONCE A YEAR BY QUALIFIED PERSONNEL TO VERIFY PROPER INSTALL-
ATION, MAINTENANCE AND CONDITlON OF EQUIPMENT. ANDREW DlSCLAIMS
A N I LLlBlLlTY OR RESPONSlBILITY FOR THE RESULTS OF IMPROPER OR

1- PROCESSES PROCEDURESPROCEDURES
AUSA SPECIFICATIONS
R I
CAUTION,
POSITION OF NYLON SLING SHOWN I S REQUIRED
I N ORDER TO PREVENT DISENGAGEMENT OF SQUARE
TUBE FROM PANNING FRAME WHILE LIFTING.

CENTER POSITION
-60' TO +60'

VIEW 'R'

FIGURE 1

MFG INSPECTION TEST


PROCESSES PROCEDURESPROCEDURES

I AUSA S P E C I F I C A T I O N S I
, f

L
n s the property of ANDREW CORPORATION All lnformotlon contamed here~nwh~ch IS not known
These drow~ngs and s p e c ~ f ~ c o t ~ oore

-
NOTICE
generally In the f ~ e l dof ANDREW sholl b~ conf~dentialexcept to ony extent to whlch ~t is established to hove been knuwn previously from sources
W other than ANDREW These drow~ngsond s p e c ~ f ~ c o t ~ omay n s not be reproduced, copled or used as the bosls for the monufocture or sale of opporotus
wlthout wr~ttenpermlsslon

%-i APPLICATION R E V I S I O N S

'NEXT ASSY U S E D ON MF REV DESCRIPTION DATE APPROVED


m
0
' REL T O PHODUCTIOIV 2 l u c i s s WF
m -

cu A ECM (C> 18JULO2 JESS


D 0 3 0 , 2 1
-

0
Z '

-
Y
n

ELEVATIOIV J A C K
3 , 7 / 4 , 6 M

ADAPTOR K I T
INSTALLATIOIV INSTRUCTIONS

REyw:;hl
OF
1
'5HEET
REVISION IA A
A A
CHFFT I 1 2 3 4
MATERIAL FIIdISH

UNLESS OTHEWISE SPECIFIED DRAWN JH D llflCT89 ANDREW CORPORATION


DIMENSIONS ARE
IN INCHES
CHECI\ED t G J 19CICT89- ,["O:"I:O:":
s 76208 A
-APPDENGRG R W b 17CICT89
1 PLACE DECIMALS f i APFD ENGRG EC ,\/ 1 1801T89
7.7 1 GM E L E V A T I C l P d _IAII t A D A F ' T f l F '
- /

2 P L A C E DECIMALS f 03
3 P L A C E DECIMALS + 010 APPD MFG k I T I N S T A L L A T I O I V IIVS TRUCTlOI\J5
A N G L E + 0 5' FSCM NO DWG NO
SIZE
A L L SURFACES
S I M I L
APPD Q C

A A
R TO 64147 239381
COMMERCIAL TOL
APPLY TO STOCK SIZES SCALE CADF FILE NO 2 3 9 3 8 1 , 1 , ~ l 1 OF 4
s ~ ~ ~ ~

+
SUPERSEDES DWG OF
- READ THE IhlSTRUCTIONS THOROUGHLY BEFORE ASSEMBLY, FCILLOW THE
SEQUENCES FOR PRUPER ASSEMBLY AND OPERATION,

THIS WARNIIVIS INDICATES THAT FAILURE TCI FOLLOW THE PRUPER


PRCICEDURE AT THIS POINI- COlJLCl RESULT I N DAMAGE TO THE
ANTENNA AND/CIR OTHER PROPERTY AND POSSIBLE INJURY TO
CAUTION: PERSOIVNEL,

THIS IIVDICATES INFCIRMATICIIV THAT


SHIIULD BE READ BEFORE PROCEEDING,

UNPACKING
CAREFULLY REMOVE A L L PARTS FROM SHIPPING BOXES, THE COIVTENTS
SHOIJLD CCIRRESPOND WITH THE PARTS L I S T , ANY DAMAGE OR SHORTAGE
W I L L PREVENT SATISFACTORY ASSEMBLY, IhISTALLATION, AN11 OPERATION
CIF THE ANTENNA,

' T H E INSTALLATIOIV, MAIIVTENANCE OR REMOVAL OF AN AN-I-ENNA


REQUIRES QUALIFIED, EXPERIENCECI PERSOIVIVEL, ANDREW IIVSTALLATION
IIVSTRUCTIOIVS H A V E BEEN W R I T T E N ANCl ILLUSTRATE11 FUR SUCH
IIVSTALLATIOIV PERSOIVIVEL, ANTEhllVA SYSTEMS SHOULD BE INSPECTED
ONCE A YEAR BY Q U A L I F I E D PERSUhlhlEL TO V E R I F Y PRCIPER I N S T A L L -
ATICIIV, MAINTENANCE AND CONDITION CIF EQUIPMENT, ANDREW DISCLAIMS
ANY L I A B I L I T Y OR RESPOIVSIBILITY FOR THE RESULTS OF IMPRCIPER OR
U N S A F E IIVSTALLATION OR PlAIhlTENANCE PRACTICES,'
TOOI-S RECOMMENDED FOR PROPER I N S T A L L A T I O N

QTY DESCRIPTION
l(EA) DRIVE SOCKETS: 1 1/16, 1 1/4
1(EA> 1/2 BREAKER BAR
1(EA> 1 1/16 SPUD WRENCH
l(EA> 1 1/4 SPUD WRENCH

TENSIONING PROCEDURES A - 3 2 5 HARDWARE

USE F E L T MARKER 1
1, L U B R I C A T E BOLT THREADS W I T H STICK WAX (ITEM 6 ) TO REDUCE
F R I C T I O N , DO NOT ALLOW WAX UNDER F L A T WASHER. l-
2. AFTER CONNECTIONS ARE COMPLETED, TIGHTEN B O L T S U N T I L
SURFACES ARE JOINED AND NUTS ARE SNUG, i.e.,FULL EFFORT OF
PERSON USING ORDINARY SPUD WRENCH. DO NOT PROCEED W I T H STEPS 3 & 4
B E L O W UNLESS THE CONNECTION I S F I N A L , I F B O L T S ARE LOOSENED AFTER FIG. A FIG. B
S T E P S 3 AND 4, DISCARD AND REPLACE W I T H NEW HARDWARE AND REPEAT A L L STEPS.
BEFORE AFTER
TENSIONING TENSIONING
3 . MARK NUTS AND END OF B O L T S W I T H STRAIGHT L I N E . SEE FIGURE A,

4 . T I G H T E N NUTS FURTHER W I T H EXTRA LONG WRENCH OR POWER WRENCH U N T I L NUTS


ARE M O V E D 1 / 3 TURN(12Oe*30') FOR BOLT LENGTHS UP TO AND INCLUDING
4 DIAMETERS, SEE FIGURE B j 1 / 2 TURN (180'*30°) FOR B O L T LENGTHS O V E R FIG. C
4 DIAMETERS. SEE FIGURE C.
AFTER
TENSIONING

P A R T S L I S T FOR 221498
3,7/4,6M E L E V A T I O N J A C K
ADAPTOR K I T

QTY I T , NO, PART NO,


1 1 221497 SPACER PLATE
2 2 45980-29 0,625-llUNC x 3,5 LONG BOLT & NUT ASSEMBLY
1 3 45980-15 0,750-10UNC x 1,75 LONG BOLT & NUT ASSEMBLY
1 4 9997-202 0,75 FLATWASHER
2 5 9997-227 0,625 FLATWASHER
1 6 200852 STICK WAX

D I S C A R D N U T S FROM I T E M S 2 AND 3 .
ATTACH SPACER P L A T E ONTO P I V O T BLOCKS OF E L E V A T I O N JACK C L E V I S
ASSEMBLY USING ( 2 ) 0 . 6 2 5 - l l U N C x 3 , 5 LONG HEX BULTS AND FLATWASHERS,
TURQUE PER A - 3 2 5 TENSIONING PROCEDURES, BUT MARK BOLT HEADS AND
SPACER PLATE. (NOTE: DISCARD 5 / 8 NUTS AS THEY ARE NOT REQUIRED)
STEP 2
LOOSELY ATTACH P I V O T BLOCK/SPACER PLATE ASSEMBLY OF E L E V A T I O N JACK
TO ENCLOSURE ASSEMBLY USING (1) 0,750-10UNC x 2.0 LONG HEX BOLT
AND FLATWASHER, (NU]-E: DISCARD NUTS AS THEY ARE NUT REQUIRED)

ALIGhl ELEVATIOhl JACK PER DIMENSION SHOWN TO ENSURE


C L E V I S END OF JACK ROTATES SMOOTHLY WITHIN P I V O T BLOCKS.

STEP 3
-
+ NOTICE' These draw~ngsand spec~f~catlons ore the property of ANDREW CORPORATION All lnformatlan cantamed here~nwhlch IS not known
I generally In the fleld af ANDREW shall be conftdent~alexcept to any extent t o whlch ~t IS established to have been known prevtously from sources
other than ANDREW These draw~nqs and may not be reproduced, copled or used as the basls for the manufacture or sole of apparatus
spec~f~cotlons
w~thoutwr~ttenpermlsslon
m

m APPLICATION REVISIONS
m NEXT A S S Y USED ON MF REV DESCRIPTION DATE APPROVED
m
D - R E L TO PRODUCTIOIV 7APR90 WF
m
CU
A CHANGED 4,6TO 4,5 SLI
- DCN D 0 0 6 , 8 0 ( E > 28APR94 KP,TN
0
Z

z
C)

3,7/4,5M S M A L L
P E D E S T A L MOUNT HOISTIIVG K I T
INSTALLATION INSTRUCTIONS

REVISICIN
STATUS
OF
SHEETS
- - - - - - - - - -
REVISION A - - - - - - -
SHEET N l l . 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
MATERIAL FINISH

-DRAWN
- - lhlOV89
RW -
UNLESS OTHEWISE SPECIFIED
B ANDREW CORPORATIOI\I
2701 M o y h ~ l lRood
DIMENSIONS ARE
IN INCHES
CHECKED KGJ -
- 6APR90 <DREW Denton, T e x a s usA 7aroa
TOLERANCE~ A P ~ DENGRG VPC 21MAR90 3 , 7 / 4 , 5 M SMALL
l P ~ ~
2 P L A C E DECIMALS f
~
03
APPDENGRG
~ ~ R W K~ 5APR90
~ l ~ ~
P E D E S T A Ll MCIUI\IT H n ] S T I N G K I T
~ ~ f

3 P L A C E DECIMALS f
ANGLE f 0 5'
0 1 0 APPD MFG II\ISTALLATION INSTRUCTIOI\IS
SIZE FSCM NO DWG NO
ALL SURFACES
-SIMILAR
APPD QC
TO A 84147 239333
*
COMMERCIAL TOL
A P P L Y TO STOCK SIZES SUPERSEDES DWG OF SCALE NONE ICAD FILE NO E S 0 6 D T l A ISHEET1 of 19
PROD GR 1 6 1 1 1 4
GENERAL
READ THE INSTRUCTIONS THOROUGHLY BEFORE ASSEMBLY. FOLLOW THE
SEQUENCES FOR PROPER ASSEMBLY AAlCl CIPERATIOIV,

THIS WARN1:NG INDICATES THAT F A I L U R E TCI FOLLOW THE PROPER


PROCEDURE AT THIS POI:Nl- COULD RESULT I N DAMAGE TCI THE
ANTENNA AND/OR OTHER PROPERTY AND POSSIBLE INJURY TO
CAUTION: PERSONNEL,

1 T H I S IhIDICATES INFORMATIOhl THAT


SHOULD BE READ BEFORE PROCEEDING,

UIUPACKING
CAREFULLY REMOVE A L L PARTS FRUI"IHIPP1IVG BOXES, THE CCllVTENTS
SHOULD CORRESPOND WITH THE PARTS L I S T , ANY DAMAGE OR SHORTAGE
W I L L PREVENT SATISFACTORY ASSEMBLY, INSTALLATIOIV, AND OPERATICIN
OF THE ANTENNA,

'THE I N S T A L L A T I O N , PlAIlVTENANCE OR REMOVAL OF AN ANTENIVA


REQUIRES QUALIFIED, EXPERIENCED PERSONNEL, ANDREW I N S T A L L A T I O N
IIVSTRUCTICII\IS H A V E BEEN WRITTEAI AAlCl I L L U S T R A T E D FOR SUCH
I N S T A L L A T I O N PERSONNEL, ANTENIVA SYSTEPIS SHCIULD BE INSPECTED
OAICE A YEAR BY Q U A L I F I E D PERSONNEL TO V E R I F Y PROPER I N S T A L L -
ATIOIV, MAIIVTENANCE AND CONDITION OF EQUIPMENT, ANDREW DISCLAIMS
ANY L I A B I L I T Y OR RESPOIVSIBILITY FOR THE RESULTS OF IMPRUPER OR
UAlSAFE I N S T A L L A T I O k I OR MAINTENANCE PRACTICES,'

SIZE FSCM NO.


A 84147 239333
SCALE 'YL/ I 1 SHEET 2 .
FI:~DN,.lES06DT2 t
FIGURE 1
HSVM
0.50-13UNCx3,5LG
HEX BClLT

TClP P L A T E
ASSEMBLY

FLATWASHER

HEX NUT
I N S T A L L I N G 3,7M REFLECTOR ON 3,7M MOUNT

STEP 1:
PCISITICIN LOCATING PATTERN AGAINST MCllJNT PELIESTAL SUPPORT PLATE,
AS SHOWN IhI FIGURE 6,
S T E P 2:
BEFORE ASSEMBLING REFLECTOR, POSITION I T S BOTTOM EDGE AGAINST
LOCATING PATTERN AS SHOWN I N FIGURE 7

INSERT A PIECE OF FOAM FROM REFLECTOR PACKING


CRATE BETWEEN THE RIM OF THE REFLECTOR AND
THE WOODEN STOPS.
CAUTIOI'l:

SIDE V I E W
LOCATING PATTERN

FIGURE 6

FIGURE 7

S T E P 3:
ROIJTE TWO LOhIG hIYLON SLINGS THROUGH 3 CONSECUTIVE HOLES I N
TORSION BOX ASSEMBLY AND CONNECT ENDS USING 5 / 8 " SHACKLE.
ALSCl ROIJTE TWCl ROPE TAG LINES THROIJGH 2 CONSECUTIVE HOLES
Ih1 TORSION BOX ASSEMBLY AS SHOWN I N FIGURE 7,

SIZE FSCM NO.


A 84147 239333
SCALE TYL/ I 1 SHEET 9
FrfpDNnJES06DT9 t

Vous aimerez peut-être aussi