1 Prefab Work Sq. Feet 400 - 2249.91 400 899,964.00 we constructed a wall of 1m height so as to support the post
The quantity was more as
2 False Ceiling Sq. Feet 115 - 3436.59 115 395,207.85 we have increased the area of false celling work. We have used false celling in the end portion also which was not planned before.
The quantity is less as we
3 Cement Board Sq. Feet 159.29 - 406.87 159.29 64,810.32 didn’t use cement board rather we used false celling in place of this 4 Steel Work Kg 123.89 - 2641 123.89 327,193.49 Contract 2 page 1 Contract 1 page 1 Rate of 5 7’x3’ metal door Pc 11025 - 1 11025 11,025.00 a door is 11025 and per Sq ft is 525 Total - Total 1,698,200.66 Vat - Vat 220,766.09 Grand Total - Grand Total 1,918,966.75