Académique Documents
Professionnel Documents
Culture Documents
End Date Duration Start Date in Number Form 43132.00 Use this number for the Minimum Bound of the Horizontal Axis to set the beginning of the chart.
43306.00
These cells will be automatically calculated based on These cells require manual input so the calculated cells
the inputs on other cells. have data to work with.
Duration
Task Name Start Date End Date (Days)
Ta sk Si x
1.75 5.25 25%
Ta s k Seven
4.90 2.10 70%
Tas k Ei ght
0.90 5.10 15%
Tas k Ni ne
2.40 1.60 60%
Ta sk Ten
3.90 2.10 65%
Ta sk El even
1.50 4.50 25%
Ta s k Twelve
1.50 3.50 30% Ta s k Thi rte en
Key: Calculate
cells will be automatically calculated based on the These cells require manual input so the calculated
s on other cells. cells have data to work with.
of the chart.
8/29/16 9/3/16
Duration
Task Name Start Date End Date (Days)
Tas k Si x
1.75 5.25 25%
Ta s k Seven
4.90 2.10 70%
Ta s k Ei ght
0.90 5.10 15%
Ta s k Ni ne
2.40 1.60 60%
Ta sk Ten
3.90 2.10 65%
Tas k El even
1.50 4.50 25%
Ta sk Twel ve
1.50 3.50 30% Ta s k Thi rte en
Key: Calculate
cells will be automatically calculated based on the These cells require manual input so the calculated
s on other cells. cells have data to work with.
g of the chart.
8/29/16 9/3/16
Task Name Start Date End Date Duration Start Date in Number Form 43132.00 Use this number for the Minimum Bound of the Horizontal Axis to set the beginning of the chart.
43306.00
These cells will be automatically calculated based on the These cells require manual input so the calculated cells
inputs on other cells. have data to work with.