BUSINESS CASE
This form should be completed in consultation with IT Projects and Consulting Services.
Business Representative
The person who has the responsibility
for the business processes associated
Alastair Whittome 15/11/06
with the proposal.
Sponsor:
The person who will sponsor the
proposal and has ultimate
David Henchliffe 15/11/06
responsibility for the project.
IT Review
IT Services Manager:
Endorses the project from a technical Mark Rosser
perspective.
TRAC
Notes
1. The purpose of this proposal is to request IT Capital funds and is to be used for all capital expenditure
requests, including software and hardware.
2. In the first instance, to determine the feasibility of the proposal, the Business Representative should contact
the IT Projects & Consulting Team, who will work with the Business Representative to prepare this document.
Revision History
Rev Date By Description
1.0 15/11/06 A Whittome Final version for BAGG & TRAC submission / approval
Document References
Ref Document Description
<Business Request Document>
Page 1 of 12
Executive Summary
TODAY
In today’s environment, most users are using Core Applications rather than the web-based eBusiness suite of
products for key requisitioning, receipting and order tracking activities.
Data flows one way, with no access for suppliers to provide input.
Enforcing Policy compliance presents a major issue due to an inability to embed this within Core Applications
processes.
The inability to enforce compliance through system smarts results in the requirement for manual intervention on
many orders, the re-keying of information, and “un-clean” data being held within our systems that requires
cleansing in order to support strategic sourcing / supplier cost control activities.
POST-IMPLEMENTATION
iProcurement will act as an “intelligent shop front” for all requisitioning, receipting and order tracking across the
business.
Direct electronic procurement links between Santos and key suppliers will be enabled.
Through these systems, we can embed policy, methodology, and many beneficial “smarts” to add value for all
users, and significantly reduce the requirements for manual intervention in the procurement process and reduce
time consuming data cleansing activity required for strategic sourcing / supplier cost control activities.
Policy enforcement will greatly reduce risk exposure for Santos in the use of non-approved suppliers /
contractors and will enable Santos to extract maximum value from contracting arrangements already negotiated.
The project will expose Santos to the use of smart form technology within Oracle – the future “intelligence
builder” within Oracle eBusiness suite to match business processes.
The project will provide a potential basis for the re-engineering of contract development and management within
Santos – and will support a “cradle to grave” within one system philosophy for all procurement.
It also aligns with agreed IT strategy of web-delivered business applications, leveraging core systems to all of
Santos, and is an enabler to the department continuing to support Santos wide growth and acquisitions without
the need for organisational change or major expansion – positioning us well for the future.
The expected cost of the project is $165,000 which will be recovered within a 1 year period post go-live.
Page 2 of 12
1 PURPOSE AND BUSINESS OBJECTIVES
To reduce risk in the procurement process through the use of iProcurement module for requisitioning within
Oracle.
To increase on time delivery performance of materials to Santos
To reduce cost from our procurement processes.
To increase value from our Contracting Arrangements through Purchasing Policy Enforcement.
To increase agility in our Business through the use of technology and the removal of non-value add activities
that slow Santos today.
To provide total visibility into the procurement cycle to requisitioner’s.
1.2 STAKEHOLDERS
Key Users Affected:
Key Deliverables:
Provide seamless delivery of order information through the requisition to pay cycle.
Provide a single point for requisitioning through Oracle iProcurement that is so easy to use you would never
choose to go elsewhere [NB: Requisitioning via Maximo and its interface will continue as normal]
Provide Procurement Policy Enforcement capability whilst providing flexibility to support varied business
requirements.
Provide transparent on-line visibility to the requisition to pay process.
Template the requisitioning process to support Commodity and Spend Analysis tools
Utilise smart form technology as a tool to manage information collation, embed templates and workflow
requests to the correct buyer 1st time
In Scope:
Roll-out of Oracle iProcurement to Santos – utilising smart form capability, and multi-stores functionality
Evaluation of correct electronic interface to be used between Santos & its suppliers (punch-out / EDI / Oracle
exchange) and its implementation with two strategic suppliers
Page 3 of 12
2 SUCCESS CRITERIA
The success of this Project will be measured by the following key Criteria.
This project will be the first use of smart forms functionality within the Oracle eBusiness suite at Santos. This is
a key functionality that is being used by Oracle to deliver flexibility and therefore value to businesses. Future
releases of Oracle will further enhance this capability without undoing any work already completed. This project
is therefore positioning Santos well for future enhancement and development of our Oracle systems.
Current gaps / risks in our systems which can be addressed through the implementation of iProcurement are
detailed in the following table:
Non-compliance with Santos spec Users cannot find the correct item Shopping categories can be used to
product purchasing / too many to requisition enable users to navigate easily to
items requisitions fall into Buyer the item they require, also ensuring
pool that are catalogued and on that specific specifications and
contract standards are adhered to
Increased costs in both process and Provision of correct information Use of templates will ensure that
unit cost through the lack of correct causes delays in the procurement users are forced to supply important
data available without cleansing. process, increased costs in the information to support both policy,
process and potentially in their unit and reporting requirements without
cost. This also has the flow on data cleansing activities
effect of mass data cleansing being
required to support Strategic
Sourcing decisions.
Page 4 of 12
Risk / Gap Issue Addressed By
There are many situations where an To purchase low value low risk Ability to punch out to supplier
integrated catalogue search would goods, Santos has to catalogue catalogues, enabling on line
be beneficial to Santos, especially these internally which adds cost, purchasing through suppliers
for low value low risk items but also time delays, and off-contract spend systems without leaving Santos’s
for items where specifications is a consequence. systems.
change rapidly eg electrical items.
Requisitions are processed Some users will be raising Ability for users to save re-usable
incorrectly, leading to failures in requisitions on a regular basis, lists and view all of their
system processes and / or non- some wont – the use of templates transactions in one place
contract purchases being effected and re-usable lists is desired
Unable to search supplier & Santos Slow process, duplicated efforts, Ability to search both Santos and
catalogue’s simultaneously misaligned data, increased costs. supplier catalogues at same time
Due to the un-friendly nature of Core requisitioning systems and Automated step-through requisition
Core Apps, this encourages non- processes are not complied with. process
compliant purchasing, leading to
vast in-efficiencies in the procure to
pay cycle (= cost) and non-contract
spend which could result in
increased risk through poor
quality / non-controlled supply
To quantify the effects of the project and its change the following details are noted for information:
Key processes directly affected - both upstream and Requisitioning, Purchase Order Tracking,
downstream Cataloguing Integration
Page 5 of 12
4 BUSINESS PROCESS CHANGE
This project will be a driver for significant business process change. The key process change can be
summarised into 3 key segments:
User change
Procurement & Logistics Change
Key supplier integration Change
A key deliverable of the project is to make this requisitioning environment the only way anyone would want to
requisition goods or services within Santos through its ease of use.
The user change’s will therefore be primarily driven through mass communication during roll-out, supported by
appropriate documentation and / or presentations / training sessions for specific user groups.
It should be noted that although all employee’s are able to requisition goods and services, in reality a smaller
pool of staff actually process these and these will be targeted with specific training as opposed to mass
communications.
Changes within Procurement & Logistics will be major - especially with regard to data set up, use of smart form
technology, data integrity / cleansing and the mapping of systems to process, these changes will be handled via
workshops and dedicated support within the department.
Key supplier integration change will consider the use of on line catalogues, sharing data electronically and
exploring the full potential of eBusiness solutions.
5 OPTIONS CONSIDERED
Page 6 of 12
6 VALUE ANALYSIS
REVISED LIKELIHOOD
LIKELIHOOD
REVISED IMPACT
IMPACT
STRATEGY
RISK MITIGATION
Business value will be derived in many areas from this project. In terms of this Business Case submittal only
some very clear tangible results have been included to substantiate the project financially, and the estimated
financial benefits listed are very conservative in size. That said the payback on the project would still be
between 6 months - 1 year maximum.
Tangible:
Page 7 of 12
Deferred headcount additions in purchasing & business systems to support order placement / strategic
sourcing spend analysis work (2006 has seen a 26% increase in procurement volume).
Reduced costs in relation to managing the Santos catalogue for suppliers we integrate with.
Reduced risk of plant failure / downtime due to non-compliant products being ordered through Policy
enforcement & on-contract spend control
Reduced time for requisitioning across the business
Reduced processing time for order placement and follow up through seamless connectivity with suppliers
Capability for Santos to manage supplier lists on-line
Provision of a very simple requisitioning tool with in-built “smarts” for all requisitioner’s within Santos
Enabling the use of web-based Oracle modules rather than Core Apps
Enabling the use of supplier catalogues rather than all catalogued by Santos – adding value through agility,
and reduced transactional costs & workloads internally
Exposure and use of smart form technology within Oracle – the future “intelligence builder” within Oracle
eBusiness suite to match business processes.
Provides a potential basis for the re-engineering of contract development and management within Santos –
and will support a “cradle to grave” within one system philosophy for all procurement.
Aligns with agreed IT strategy of web-delivered business applications, leveraging core systems to all of
Santos
An enabler to the department continuing to support Santos wide growth & acquisitions without the need for
organisational change or major expansion – positioning us well for the future
6.3 COST
Low end estimate: $ 136,230
High end estimate: $ 172,080
Page 8 of 12
7 IMPLEMENTATION TIMING
It is anticipated that the project will commence in earnest in February 2007, some pre-work will be completed
prior to year end however no capital costs will be incurred in 2006.
8 COSTS SECTION
8.1 INFRASTRUCTURE COSTS
Training environment in place for ongoing training for suppliers will be required, IT believe current
infrastructure & applications can be utilised to support this without the need for investment.
Anticipated costs relate primarily to travel and expenses, these have been costed as follows:
Return flights (once per destination) to Moomba, Ballera, Jackson, Mereenie, Pt Bonython, Brisbane, Roma &
Perth – est @ $350 e/way for 3 people:
Return flights (once to two destinations) to Melbourne / Sydney / Brisbane (depends on suppliers) – est. flights @
$450 e/way + cabs for 3 people
Costs for the preparation of WorkReady training modules have also been included at a total cost of $14,000
Page 9 of 12
8.4 OPERATIONAL
Nil – in fact reduced post go-live.
Steering Committee: David Henchliffe, Mark Rosser, Alastair Whittome, Mahree Waldeck
Will meet monthly to discuss progress at standing Procurement / IT services
review meeting.
Ad Hoc Project Members: Targeted requistioner’s from the business – some high volume users, some low
volume
Page 10 of 12
Appendix A Financial Working Sheet
Software
Licence Costs 0 0 0
Software Development Costs 0 0 0
Other 0 0 0
Benefits:
Increased profit (per annum) $840,000 $420,000 $140,000
Workings for increased profit :
Annual spend on materials $ 560,000,000
Annual spend on services $ 940,000,000
Page 11 of 12
Appendix B Functional Opportunities Available:
Functionality Benefit
i-Procurement
Web-Shopping Interface Familiar interface leverages user expereince with consumer sites
Automated step-through requistion process
Online stores organize content
Powerful search engine
B
Information templates
Complete Catalog & Content Management Content access from Oracle Purchasing
Blanket purchase agreements
Quotations
Item master
Web-based supplier catalog loading
Punhcout to external web stores or content hubs
Transparent Punchout to remote web stores without leaving
iProcurement
Off-catalog buying
Pre-built Oracle exchange supplier content
Easy to use Sign-On and Home Page User friendly Home page
Organization specific purchasing policies
User preferences and personalisation