POZO TUBULAR DE 115 M - 15" Ø - HABILITACION URBANA MUNICIPAL

PRUEBA DE RENDIMIENTO A CAUDAL CONSTANTE

PROYECTO : HABILITACION URBANA PROYECTO URBANIZACION TIERRAS DEL SOL PUCALLPA-UCAYALI

Q = 396 GPM = 25 Lt/sg = 2,160 m3/dia RPM= 1000

NIVEL ESTATICO 10.60


HORA INICIO 1:30 PM FECHA : 22-01-12

HORA FINAL 2:30 PM FECHA : 14-06-12

ho 12.38

Profundidad
Tiempo Tiempo Profundidad Recuperacion
. Abat.(m) h/ho
Minutos (minutos) (m) (m)
(m)
0 0 10.60 0.00 0.00 0 15.16 0.00
1 1 10.69 0.09 0.01 1 14.60 4.00
2 1 10.78 0.18 0.01 2 13.15 2.55
3 1 10.86 0.26 0.02 3 12.80 2.20
4 1 10.92 0.32 0.03 4 12.30 1.70
5 1 10.98 0.38 0.03 5 11.90 1.30
6 1 11.06 0.46 0.04 6 11.50 0.90
7 1 11.10 0.50 0.04 7 11.30 0.70
8 1 11.16 0.56 0.05 8 11.10 0.50
9 1 11.21 0.61 0.05 9 10.90 0.30
10 1 11.26 0.66 0.05 10 10.80 0.20
15 5 11.45 0.85 0.04 12 10.75 0.15
20 5 11.65 1.05 0.08 14 10.70 0.10
25 5 11.83 1.23 0.10 17 10.67 0.07
30 5 12.08 1.48 0.12 20 10.66 0.06
40 10 12.31 1.71 0.14 30 10.65 0.05
50 10 12.58 1.98 0.16 40 10.62 0.02
60 10 12.81 2.21 0.18
90 30 13.05 2.45 0.20
120 30 13.30 2.70 0.22
150 30 13.50 2.90 0.23
210 60 13.69 3.09 0.25
270 60 13.85 3.25 0.26
330 60 14.10 3.50 0.28
390 60 14.30 3.70 0.30
450 60 14.47 3.87 0.31
510 60 14.68 4.08 0.33
570 60 14.80 4.20 0.34
630 60 14.94 4.34 0.35
690 60 14.99 4.39 0.35
750 60 15.02 4.42 0.36
810 60 15.05 4.45 0.36
870 60 15.10 4.50 0.36
930 60 15.12 4.52 0.37
990 60 15.12 4.52 0.37
1,050 60 15.13 4.53 0.37
1,110 60 15.13 4.53 0.37
1,170 60 15.14 4.54 0.37
1,230 60 15.15 4.55 0.37
1,290 60 15.15 4.55 0.37
1,350 60 15.15 4.55 0.37
1,410 60 15.16 4.56 0.37
POZO TUBULAR DE 115 M - 15" Ø - HABILITACION URBANA MUNICIPAL

PRUEBA DE RENDIMIENTO A CAUDAL CONSTANTE

PROYECTO :
HABILITACION URBANA PROYECTO URBANIZACION TIERRAS DEL SOL PUCALLPA-UCAYALI

Q = 396 GPM = 25 Lt/sg = 2,160 m3/dia RPM= 1000

CURVA DE ABATIMIENTO

TIEMPO DE ABATIMIENTO
1 10 Minutos 100 1000
0.00

f(x) = 0.6789257605 ln(x)


f(x) = 0.6789257605 - 0.6486719145
ln(x) - 0.6486719145
R² = 0.9546513305
R² = 0.9546513305

10.00
ABATIMIENTO (M)

20.00

30.00

40.00

50.00
POZO TUBULAR DE 115 M - 15" Ø - HABILITACION URBANA MUNICIPAL
PRUEBA DE RENDIMIENTO A CAUDAL CONSTANTE

PROYECTO : HABILITACION URBANA PROYECTO URBANIZACION TIERRAS DEL SOL-PUCALLPA-UCAYALI

Q = 396 GPM = 25 Lt/sg = 2,160 m3/dia RPM= 1000

CURVA DE RECUPERACION

TIEMPO DE RECUPERACION
1 10 Minutos 100 1000
0.00
RECUPERACION (M)

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

18.00

20.00

22.00

24.00

CALCULO DE PARAMETROS DE HIDRODINAMICA

CALCULO DEL COEFICIENTE DE


RADIO DE INFLUENCIA
TRANSMISIVIDAD
(R)
(T)
FORMULA: FORMULA: FORMULA:
T 2.3*Q/4*∏*Δs S = 2.25 *T*to/r2

DATOS:
Q 2160.00
FORMULA:
T = 131.78 m²/dia r= √((2.25∗T∗t)/S)
Δs 3 to = 0.8000 dia DATOS:
∏ 3.1415926536 r2 = 13.46 m² T = 131.78029288
to = 0.0416666
APLICACIÓN APLICACIÓN S = 1.76E+01

T 131.78 S = 17.6281604626 APLICACIÓN


S = 1.76E+01 R = 1
RESUMEN DE PERMEABILIDAD
MICAELA BASTIDAS 9.52 E - 04
PALMERAS 4.23 E - 04
CORPAC 8.68 E - 05
COLINAS 2.34 E - 04
CESAR VALLEJO 6.88 E - 05
HABILITACION URBANA MUNICIPAL 4.45 E - 05
PROMEDIO 3.01 E - 04