ho 12.38
Profundidad
Tiempo Tiempo Profundidad Recuperacion
. Abat.(m) h/ho
Minutos (minutos) (m) (m)
(m)
0 0 10.60 0.00 0.00 0 15.16 0.00
1 1 10.69 0.09 0.01 1 14.60 4.00
2 1 10.78 0.18 0.01 2 13.15 2.55
3 1 10.86 0.26 0.02 3 12.80 2.20
4 1 10.92 0.32 0.03 4 12.30 1.70
5 1 10.98 0.38 0.03 5 11.90 1.30
6 1 11.06 0.46 0.04 6 11.50 0.90
7 1 11.10 0.50 0.04 7 11.30 0.70
8 1 11.16 0.56 0.05 8 11.10 0.50
9 1 11.21 0.61 0.05 9 10.90 0.30
10 1 11.26 0.66 0.05 10 10.80 0.20
15 5 11.45 0.85 0.04 12 10.75 0.15
20 5 11.65 1.05 0.08 14 10.70 0.10
25 5 11.83 1.23 0.10 17 10.67 0.07
30 5 12.08 1.48 0.12 20 10.66 0.06
40 10 12.31 1.71 0.14 30 10.65 0.05
50 10 12.58 1.98 0.16 40 10.62 0.02
60 10 12.81 2.21 0.18
90 30 13.05 2.45 0.20
120 30 13.30 2.70 0.22
150 30 13.50 2.90 0.23
210 60 13.69 3.09 0.25
270 60 13.85 3.25 0.26
330 60 14.10 3.50 0.28
390 60 14.30 3.70 0.30
450 60 14.47 3.87 0.31
510 60 14.68 4.08 0.33
570 60 14.80 4.20 0.34
630 60 14.94 4.34 0.35
690 60 14.99 4.39 0.35
750 60 15.02 4.42 0.36
810 60 15.05 4.45 0.36
870 60 15.10 4.50 0.36
930 60 15.12 4.52 0.37
990 60 15.12 4.52 0.37
1,050 60 15.13 4.53 0.37
1,110 60 15.13 4.53 0.37
1,170 60 15.14 4.54 0.37
1,230 60 15.15 4.55 0.37
1,290 60 15.15 4.55 0.37
1,350 60 15.15 4.55 0.37
1,410 60 15.16 4.56 0.37
POZO TUBULAR DE 115 M - 15" Ø - HABILITACION URBANA MUNICIPAL
PROYECTO :
HABILITACION URBANA PROYECTO URBANIZACION TIERRAS DEL SOL PUCALLPA-UCAYALI
CURVA DE ABATIMIENTO
TIEMPO DE ABATIMIENTO
1 10 Minutos 100 1000
0.00
10.00
ABATIMIENTO (M)
20.00
30.00
40.00
50.00
POZO TUBULAR DE 115 M - 15" Ø - HABILITACION URBANA MUNICIPAL
PRUEBA DE RENDIMIENTO A CAUDAL CONSTANTE
CURVA DE RECUPERACION
TIEMPO DE RECUPERACION
1 10 Minutos 100 1000
0.00
RECUPERACION (M)
2.00
4.00
6.00
8.00
10.00
12.00
14.00
16.00
18.00
20.00
22.00
24.00
DATOS:
Q 2160.00
FORMULA:
T = 131.78 m²/dia r= √((2.25∗T∗t)/S)
Δs 3 to = 0.8000 dia DATOS:
∏ 3.1415926536 r2 = 13.46 m² T = 131.78029288
to = 0.0416666
APLICACIÓN APLICACIÓN S = 1.76E+01