ACERO TRABES SOTANO RECUBRIMIENTO

TRABE EJE E VARILLAS #6 + 4#3 0.04


PIEZAS VARIILAS #6 ML/PZA TOTAL
12 30.01 360.12
6 3.46 20.76
8 6.75 54

PIEZAS VARIILAS #3
4.00 30.01 120.04 ml LONGITUD DE TRABE (m)

ESTRIBOS #3 SECCION 30 x 70
PIEZAS ML/PZA TOTAL
150 1.34 201.60 ml

TRABE ml ESTRIBOS ml SUBTOTAL ml


VARILLA #6 434.88 434.88
VARILLA #3 120.04 201.60 321.64

ACERO TRABES SOTANO RECUBRIMIENTO


TRABE EJE F y H VARILLAS #6 + 4#3 0.04
PIEZAS VARIILAS #6 ML/PZA TOTAL
12 30.01 360.12
4 3.46 13.84
4 6.75 27

PIEZAS VARIILAS #3
4.00 30.01 120.04 ml LONGITUD DE TRABE (m)

ESTRIBOS #3 SECCION 30 x 70
PIEZAS ML/PZA TOTAL
150 1.34 201.60 ml

TRABE ml ESTRIBOS ml SUBTOTAL ml


VARILLA #6 400.96 400.96
VARILLA #3 120.04 201.60 321.64

ACERO TRABES SOTANO RECUBRIMIENTO


TRABE EJE L VARILLAS #6 + 4#3 0.04
PIEZAS VARIILAS #6 ML/PZA TOTAL
6 15.47 92.82
4 3.46 13.84
2 6.75 13.5

PIEZAS VARIILAS #3
4.00 15.47 61.88 ml LONGITUD DE TRABE (m)

ESTRIBOS #3 SECCION 30 x 70
PIEZAS ML/PZA TOTAL
103 1.34 138.47 ml

TRABE ml ESTRIBOS ml SUBTOTAL ml


VARILLA #6 120.16 120.16
VARILLA #3 61.88 138.47 200.35

ACERO TRABES SOTANO RECUBRIMIENTO


TRABE EJE Q VARILLAS #8 + 4#3 0.04
PIEZAS VARIILAS #8 ML/PZA TOTAL
4 15.47 61.88
6 3.46 20.76
5 6.75 33.75

PIEZAS VARIILAS #3
4.00 15.47 61.88 ml LONGITUD DE TRABE (m)

ESTRIBOS #4 SECCION 30 x 70
PIEZAS ML/PZA TOTAL
78 1.34 104.19 ml

TRABE ml ESTRIBOS ml SUBTOTAL ml


VARILLA #8 116.39 116.39
VARILLA #4 104.19 104.19
VARILLA #3 61.88 61.88

ACERO TRABES SOTANO RECUBRIMIENTO


TRABE T-2 VARILLAS #6 + 4#3 0.04
PIEZAS VARIILAS #6 ML/PZA TOTAL
6.00 2.97 17.82 ml
PIEZAS VARIILAS #3
4.00 2.97 11.88 ml LONGITUD DE TRABE (m)
ESTRIBOS #3 SECCION 30 x 70
PIEZAS ML/PZA TOTAL
15 1.34 20.44 ml
TRABE ml ESTRIBOS ml SUBTOTAL ml
VARILLA #6 17.82 17.82
VARILLA #4 0.00
VARILLA #3 11.88 20.44 11.88

ACERO TRABES SOTANO RECUBRIMIENTO


TRABE T-3 VARILLAS #6 + 4#3 0.04
PIEZAS VARIILAS #6 ML/PZA TOTAL
6.00 7.69 46.14 ml
PIEZAS VARIILAS #3
4.00 7.69 30.76 ml LONGITUD DE TRABE (m)
ESTRIBOS #3 SECCION 30 x 70
PIEZAS ML/PZA TOTAL
39 1.34 52.06 ml

TRABE ml ESTRIBOS ml SUBTOTAL ml


VARILLA #6 46.14 46.14
VARILLA #4 0.00
VARILLA #3 30.76 52.06 30.76

ACERO TRABES SOTANO RECUBRIMIENTO


TRABE EJE 7 VARILLAS #6 + 4#3 0.04
PIEZAS VARIILAS #6 ML/PZA TOTAL
12 40.07 480.84
4 1.64 6.56
6 2.52 15.12

PIEZAS VARIILAS #3
4.00 40.07 160.28 ml LONGITUD DE TRABE (m)

ESTRIBOS #3 SECCION 30 x 70
PIEZAS ML/PZA TOTAL
201 1.34 269.01 ml

TRABE ml ESTRIBOS ml SUBTOTAL ml


VARILLA #6 502.52 502.52
VARILLA #3 160.28 269.01 429.29

ACERO TRABES SOTANO RECUBRIMIENTO


TRABE EJE 10 VARILLAS #6 + 4#3 0.04
PIEZAS VARIILAS #6 ML/PZA TOTAL
12 34.35 412.2
4 2.65 10.6
6 3.82 22.92
4 2.52 10.08
PIEZAS VARIILAS #3
4.00 34.35 137.40 ml LONGITUD DE TRABE (m)

ESTRIBOS #3 SECCION 30 x 70
PIEZAS ML/PZA TOTAL
172 1.34 230.68 ml

TRABE ml ESTRIBOS ml SUBTOTAL ml


VARILLA #6 455.80 455.80
VARILLA #3 137.40 230.68 368.08

ACERO TRABES SOTANO RECUBRIMIENTO


TRABE EJE 21 y 23 VARILLAS #6 + 4#3 0.04
PIEZAS VARIILAS #6 ML/PZA TOTAL
6 26.10 156.6
4 2.43 9.72
6 3.82 22.92

PIEZAS VARIILAS #3
4.00 26.10 104.40 ml LONGITUD DE TRABE (m)

ESTRIBOS #3 SECCION 30 x 70
PIEZAS ML/PZA TOTAL
131 1.34 175.41 ml

TRABE ml ESTRIBOS ml SUBTOTAL ml


VARILLA #6 189.24 189.24
VARILLA #3 104.40 175.41 279.81

ACERO TRABES SOTANO RECUBRIMIENTO


TRABE EJE 14 VARILLAS #6 + 4#3 0.04
PIEZAS VARIILAS #6 ML/PZA TOTAL
6 14.85 89.1
4 1.65 6.6
2 3.7 7.4

PIEZAS VARIILAS #3
4.00 14.85 59.40 ml LONGITUD DE TRABE (m)

ESTRIBOS #3 SECCION 30 x 70
PIEZAS ML/PZA TOTAL
75 1.34 100.03 ml

TRABE ml ESTRIBOS ml SUBTOTAL ml


VARILLA #6 103.10 103.10
VARILLA #3 59.40 100.03 159.43

ACERO TRABES SOTANO RECUBRIMIENTO


TRABE EJE 2 VARILLAS #6 + 4#3 0.04
PIEZAS VARIILAS #6 ML/PZA TOTAL
6 18.80 112.8
4 1.65 6.6
4 3.21 12.84

PIEZAS VARIILAS #3
4.00 18.80 75.20 ml LONGITUD DE TRABE (m)

ESTRIBOS #3 SECCION 30 x 70
PIEZAS ML/PZA TOTAL
94 1.34 126.50 ml

TRABE ml ESTRIBOS ml SUBTOTAL ml


VARILLA #6 132.24 132.24
VARILLA #3 75.20 126.50 201.70

ACERO TRABES SOTANO RECUBRIMIENTO


TRABE EJE 27 VARILLAS #6 + 4#3 0.04
PIEZAS VARIILAS #6 ML/PZA TOTAL
6 21.10 126.6
2 3.95 7.9
2 1.71 3.42
2 3.21 6.42
2 3.11 6.22
PIEZAS VARIILAS #3
4.00 21.10 84.40 ml LONGITUD DE TRABE (m)

ESTRIBOS #3 SECCION 30 x 70
PIEZAS ML/PZA TOTAL
106 1.34 141.91 ml
TRABE ml ESTRIBOS ml SUBTOTAL ml
VARILLA #6 150.56 150.56
VARILLA #3 84.40 141.91 226.31

ACERO TRABES SOTANO RECUBRIMIENTO


TRABE EJE 8 VARILLAS #8 + 4#3 0.04
PIEZAS VARIILAS #8 ML/PZA TOTAL
4 8.66 34.64
2 2.84 5.68
8 2.92 23.36

PIEZAS VARIILAS #3
4.00 8.66 34.64 ml LONGITUD DE TRABE (m)

ESTRIBOS #4 SECCION 30 x 70
PIEZAS ML/PZA TOTAL
44 1.34 58.56 ml

TRABE ml ESTRIBOS ml SUBTOTAL ml


VARILLA #8 63.68 63.68
VARILLA #4 58.56 58.56
VARILLA #3 34.64 34.64

KG
VARILLA #8 715.78 KG
VARILLA #6 5855.53
8208.00
VARILLA #4 162.09
VARILLA #3 1474.60
RIMIENTO GANCHO
0.04 0.10
0.05

TUD DE TRABE (m) 29.89

kg/ml TOTAL DE kg
2.25 978.48
0.56 179.16

RIMIENTO GANCHO
0.04 0.10
0.05

TUD DE TRABE (m) 29.89

kg/ml TOTAL DE kg
2.25 902.16
0.56 179.16

RIMIENTO GANCHO
0.04 0.10
0.05
TUD DE TRABE (m) 15.35

kg/ml TOTAL DE kg
2.25 270.36
0.56 111.59

RIMIENTO GANCHO
0.04 0.10
0.05

TUD DE TRABE (m) 15.35

kg/ml TOTAL DE kg
3.975 462.65
0.996 103.77
0.557 34.47

RIMIENTO GANCHO
0.04 0.10
0.05

TUD DE TRABE (m) 2.85


kg/ml TOTAL DE kg
3.975 70.83
0.996 0.00
0.557 6.62

RIMIENTO GANCHO
0.04 0.10
0.05

TUD DE TRABE (m) 7.57

kg/ml TOTAL DE kg
3.975 183.41
0.996 0.00
0.557 17.13

RIMIENTO GANCHO
0.04 0.10
0.05

TUD DE TRABE (m) 39.95

kg/ml TOTAL DE kg
2.25 1130.67
0.56 239.11

RIMIENTO GANCHO
0.04 0.10
0.05

TUD DE TRABE (m) 34.23

kg/ml TOTAL DE kg
2.25 1025.55
0.56 205.02

RIMIENTO GANCHO
0.04 0.10
0.05

TUD DE TRABE (m) 25.98

kg/ml TOTAL DE kg
2.25 425.79
0.56 155.85

RIMIENTO GANCHO
0.04 0.10
0.05
TUD DE TRABE (m) 14.73

kg/ml TOTAL DE kg
2.25 231.98
0.56 88.80

RIMIENTO GANCHO
0.04 0.10
0.05

TUD DE TRABE (m) 18.68

kg/ml TOTAL DE kg
2.25 297.54
0.56 112.34

RIMIENTO GANCHO
0.04 0.10
0.05

TUD DE TRABE (m) 20.98


kg/ml TOTAL DE kg
2.25 338.76
0.56 126.05

RIMIENTO GANCHO
0.04 0.10
0.05

TUD DE TRABE (m) 8.54

kg/ml TOTAL DE kg
3.975 253.13
0.996 58.32
0.557 19.29
ACERO TRABES NIVEL PLANTA BAJA RECUBRIMIENTO
TRABE EJE E VARILLAS #6 Y #8 + 4#3 0.05
PIEZAS VARIILAS #6 ML/PZA TOTAL
4 2.10 8.4 ml

PIEZAS VARIILAS #4
4 2.10 8.4 ml

LONGITUD DE TRABE (m)

ESTRIBOS #3 SECCION 30 x 70
PIEZAS ML/PZA TOTAL
22 0.70 15.40 ml

TRABE ml ESTRIBOS ml SUBTOTAL ml


VARILLA #6 8.40 8.40
VARILLA #4 8.40 8.40
VARILLA #3 0.00 15.40 15.40

ACERO TRABES NIVEL PLANTA BAJA RECUBRIMIENTO


TRABE EJE F y H VARILLAS #6 Y #8 + 4#3 0.04
PIEZAS VARIILAS #8 ML/PZA TOTAL
2 3.64 7.28 ml

PIEZAS VARIILAS #6
6 9.22 55.32 ml
3 8.23 24.69 ml
3 8.34 25.02 ml
3 15.00 45 ml
3 17.32 51.96 ml
4 5.48 21.92 ml
4 6.75 27 ml
2 2.79 5.58 ml
3 3.81 11.43 ml

PIEZAS VARIILAS #3
4.00 30.55 122.20 ml LONGITUD DE TRABE (m)
ESTRIBOS #3 SECCION 30 x 70
PIEZAS ML/PZA TOTAL
153 1.34 205.22 ml

TRABE ml ESTRIBOS ml SUBTOTAL ml


VARILLA #8 7.28 7.28
VARILLA #6 267.92 267.92
VARILLA #3 122.20 205.22 327.42

ACERO TRABES NIVEL PLANTA BAJA RECUBRIMIENTO


TRABE EJE L VARILLAS #6+ 4#3 0.04
PIEZAS VARIILAS #6 ML/PZA TOTAL
3 3.64 10.92 ml
3 9.22 27.66 ml
2 7.77 15.54 ml
2 5.48 10.96 ml
2 1.47 2.94 ml
2 8.95 17.9 ml
3 8.24 24.72 ml

PIEZAS VARIILAS #3
4.00 15.65 62.60 ml LONGITUD DE TRABE (m)

ESTRIBOS #3 SECCION 30 x 70
PIEZAS ML/PZA TOTAL
79 1.34 105.39 ml

TRABE ml ESTRIBOS ml SUBTOTAL ml


VARILLA #8 0.00
VARILLA #6 110.64 110.64
VARILLA #3 62.60 105.39 167.99

ACERO TRABES NIVEL PLANTA BAJA RECUBRIMIENTO


TRABE EJE Q VARILLAS #6 Y #8, #10+ 4#3 0.04
PIEZAS VARIILAS #10 ML/PZA TOTAL
11 3.96 43.56 ml

PIEZAS VARIILAS #8
2 8.58 17.16 ml
3 7.81 23.43 ml
2 1.94 3.88 ml
2 8.30 16.6 ml
3 8.98 26.94 ml
1 3.22 3.22 ml

PIEZAS VARIILAS #6
2 3.64 7.28 ml

PIEZAS VARIILAS #3
4.00 12.95 51.80 ml LONGITUD DE TRABE (m)

ESTRIBOS #3 SECCION 30 x 70
PIEZAS ML/PZA TOTAL
65 1.34 87.30 ml

TRABE ml ESTRIBOS ml SUBTOTAL ml


VARILLA #10 43.56 43.56
VARILLA #8 91.23 91.23
VARILLA #6 7.28 7.28
VARILLA #3 51.80 87.30 139.10

ACERO TRABES NIVEL PLANTA BAJA RECUBRIMIENTO


TRABE T-2 VARILLAS #6 + 4#3 0.04
PIEZAS VARIILAS #6 ML/PZA TOTAL
6.00 2.97 17.82 ml
PIEZAS VARIILAS #3
4.00 2.97 11.88 ml LONGITUD DE TRABE (m)
ESTRIBOS #3 SECCION 30 x 70
PIEZAS ML/PZA TOTAL
15 1.34 20.44 ml

TRABE ml ESTRIBOS ml SUBTOTAL ml


VARILLA #6 17.82 17.82
VARILLA #4 0.00
VARILLA #3 11.88 20.44 11.88

ACERO TRABES NIVEL PLANTA BAJA RECUBRIMIENTO


TRABE T-3 VARILLAS #6 + 4#3 0.04
PIEZAS VARIILAS #6 ML/PZA TOTAL
6.00 7.69 46.14 ml
PIEZAS VARIILAS #3
4.00 7.69 30.76 ml LONGITUD DE TRABE (m)
ESTRIBOS #3 SECCION 30 x 70
PIEZAS ML/PZA TOTAL
39 1.34 52.06 ml

TRABE ml ESTRIBOS ml SUBTOTAL ml


VARILLA #6 46.14 46.14
VARILLA #4 0.00
VARILLA #3 30.76 52.06 30.76

ACERO TRABES NIVEL PLANTA BAJA RECUBRIMIENTO


TRABE EJE 7 VARILLAS #6+ 4#3 0.04
PIEZAS VARIILAS #6 ML/PZA TOTAL
12 40.07 480.84 ml
2 1.71 3.42 ml
2 3.4 6.8 ml
2 3.20 6.4 ml
2 3.11 6.22 ml
6 2.57 15.42 ml

PIEZAS VARIILAS #3
4.00 40.07 160.28 ml LONGITUD DE TRABE (m)

ESTRIBOS #3 SECCION 30 x 70
PIEZAS ML/PZA TOTAL
201 1.34 269.01 ml

TRABE ml ESTRIBOS ml SUBTOTAL ml


VARILLA #8 0.00
VARILLA #6 519.10 519.10
VARILLA #3 160.28 269.01 429.29

ACERO TRABES NIVEL PLANTA BAJA RECUBRIMIENTO


TRABE EJE 10 VARILLAS #6+ 4#3 0.04
PIEZAS VARIILAS #6 ML/PZA TOTAL
12 34.35 412.2 ml
2 1.71 3.42 ml
2 2.69 5.38 ml
2 3.81 7.62 ml
2 3.20 6.4 ml
2 3.11 6.22 ml
4 2.57 10.28 ml
PIEZAS VARIILAS #3
4.00 34.35 137.40 ml LONGITUD DE TRABE (m)

ESTRIBOS #3 SECCION 30 x 70
PIEZAS ML/PZA TOTAL
172 1.34 230.68 ml

TRABE ml ESTRIBOS ml SUBTOTAL ml


VARILLA #8 0.00
VARILLA #6 451.52 451.52
VARILLA #3 137.40 230.68 368.08

ACERO TRABES NIVEL PLANTA BAJA RECUBRIMIENTO


TRABE EJE 21 y 23 VARILLAS #6+ 4#3 0.04
PIEZAS VARIILAS #6 ML/PZA TOTAL
6 26.10 156.6 ml
2 3.81 7.62 ml
2 3.20 6.4 ml
2 3.11 6.22 ml
2 2.46 4.92 ml
2 1.71 3.42 ml

PIEZAS VARIILAS #3
4.00 26.10 104.40 ml LONGITUD DE TRABE (m)

ESTRIBOS #3 SECCION 30 x 70
PIEZAS ML/PZA TOTAL
131 1.34 175.41 ml

TRABE ml ESTRIBOS ml SUBTOTAL ml


VARILLA #8 0.00
VARILLA #6 185.18 185.18
VARILLA #3 104.40 175.41 279.81

ACERO TRABES NIVEL PLANTA BAJA RECUBRIMIENTO


TRABE EJE 14 VARILLAS #6+ 4#3 0.04
PIEZAS VARIILAS #6 ML/PZA TOTAL
6 14.85 89.1 ml
2 3.70 7.4 ml
2 1.69 3.38 ml
2 2.26 4.52 ml
PIEZAS VARIILAS #3
4.00 14.85 59.40 ml LONGITUD DE TRABE (m)

ESTRIBOS #3 SECCION 30 x 70
PIEZAS ML/PZA TOTAL
75 1.34 100.03 ml

TRABE ml ESTRIBOS ml SUBTOTAL ml


VARILLA #8 0.00
VARILLA #6 104.40 104.40
VARILLA #3 59.40 100.03 159.43

ACERO TRABES NIVEL PLANTA BAJA RECUBRIMIENTO


TRABE EJE 2 VARILLAS #6+ 4#3 0.04
PIEZAS VARIILAS #6 ML/PZA TOTAL
3 20.04 60.12 ml
3 6.66 19.98 ml
2 1.89 3.78 ml
2 1.71 3.42 ml
2 3.81 7.62 ml
2 2.34 4.68 ml
2 3.20 6.4 ml
3 18.91 56.73 ml
3 7.73 23.19 ml

PIEZAS VARIILAS #3
4.00 25.90 103.60 ml LONGITUD DE TRABE (m)

ESTRIBOS #3 SECCION 30 x 70
PIEZAS ML/PZA TOTAL
130 1.34 174.07 ml

TRABE ml ESTRIBOS ml SUBTOTAL ml


VARILLA #8 0.00
VARILLA #6 185.92 185.92
VARILLA #3 103.60 174.07 277.67

ACERO TRABES NIVEL PLANTA BAJA RECUBRIMIENTO


TRABE EJE 27 VARILLAS #6+ 4#3 0.04
PIEZAS VARIILAS #6 ML/PZA TOTAL
3 15.23 45.69 ml
2 6.66 13.32 ml
2 3.99 7.98 ml
2 1.71 3.42 ml
2 3.20 6.4 ml
2 3.11 6.22 ml
2 14.10 28.2 ml
3 7.72 23.16 ml

PIEZAS VARIILAS #3
4.00 21.10 84.40 ml LONGITUD DE TRABE (m)

ESTRIBOS #3 SECCION 30 x 70
PIEZAS ML/PZA TOTAL
106 1.34 141.91 ml

TRABE ml ESTRIBOS ml SUBTOTAL ml


VARILLA #8 0.00
VARILLA #6 134.39 134.39
VARILLA #3 84.40 141.91 226.31

ACERO TRABES NIVEL PLANTA BAJA RECUBRIMIENTO


TRABE EJE 8 VARILLAS #8+ 4#3 0.04
PIEZAS VARIILAS #8 ML/PZA TOTAL
4 8.66 34.64 ml
2 2.84 5.68 ml
8 2.92 23.36 ml

PIEZAS VARIILAS #3
4.00 8.66 34.64 ml LONGITUD DE TRABE (m)

ESTRIBOS #4 SECCION 30 x 70
PIEZAS ML/PZA TOTAL
44 1.34 58.56 ml

TRABE ml ESTRIBOS ml SUBTOTAL ml


VARILLA #8 63.68 63.68
VARILLA #4 58.56 58.56
VARILLA #3 34.64 34.64
KG
VARILLA #10 271.16
VARILLA #8 663.61
VARILLA #6 4686.89 7054.53
VARILLA #4 58.32
VARILLA #3 1374.55
RIMIENTO GANCHO
0.05 0.10
0.05

TUD DE TRABE (m) 2.1

kg/ml TOTAL DE kg
2.25 18.90
0.996 8.37
0.557 8.58

RIMIENTO GANCHO
0.04 0.10
0.05

TUD DE TRABE (m) 30.43


kg/ml TOTAL DE kg
3.975 28.94
2.25 602.82
0.557 182.37

RIMIENTO GANCHO
0.04 0.10
0.05

TUD DE TRABE (m) 15.53

kg/ml TOTAL DE kg
3.975 0.00
2.25 248.94
0.557 93.57

RIMIENTO GANCHO
0.04 0.10
0.05
TUD DE TRABE (m) 12.83

kg/ml TOTAL DE kg
6.225 271.16
3.975 362.64
2.25 16.38
0.557 77.48

RIMIENTO GANCHO
0.04 0.10
0.05

TUD DE TRABE (m) 2.85

kg/ml TOTAL DE kg
3.975 70.83
0.996 0.00
0.557 6.62

RIMIENTO GANCHO
0.04 0.10
0.05
TUD DE TRABE (m) 7.57

kg/ml TOTAL DE kg
3.975 183.41
0.996 0.00
0.557 17.13

RIMIENTO GANCHO
0.04 0.10
0.05

TUD DE TRABE (m) 39.95

kg/ml TOTAL DE kg
3.975 0.00
2.25 1167.98
0.557 239.11

RIMIENTO GANCHO
0.04 0.10
0.05
TUD DE TRABE (m) 34.23

kg/ml TOTAL DE kg
3.975 0.00
2.25 1015.92
0.557 205.02

RIMIENTO GANCHO
0.04 0.10
0.05

TUD DE TRABE (m) 25.98

kg/ml TOTAL DE kg
3.975 0.00
2.25 416.66
0.557 155.85

RIMIENTO GANCHO
0.04 0.10
0.05
TUD DE TRABE (m) 14.73

kg/ml TOTAL DE kg
3.975 0.00
2.25 234.90
0.557 88.80

RIMIENTO GANCHO
0.04 0.10
0.05

TUD DE TRABE (m) 25.78

kg/ml TOTAL DE kg
3.975 0.00
2.25 418.32
0.557 154.66

RIMIENTO GANCHO
0.04 0.10
0.05
TUD DE TRABE (m) 20.98

kg/ml TOTAL DE kg
3.975 0.00
2.25 302.38
0.557 126.05

RIMIENTO GANCHO
0.04 0.10
0.05

TUD DE TRABE (m) 8.54

kg/ml TOTAL DE kg
3.975 253.13
0.996 58.32
0.557 19.29
ACERO TRABES SOTANO RECUBRIMIENTO
TRABE EJE E VARILLAS #6 + 4#3 0.04
PIEZAS VARIILAS #6 ML/PZA TOTAL
10.00 30.01 300.10 ml
PIEZAS VARIILAS #3
4.00 30.01 120.04 ml LONGITUD DE TRABE (m)
ESTRIBOS #3 SECCION 30 x 70
PIEZAS ML/PZA TOTAL
150 1.34 201.60 ml

TRABE ml ESTRIBOS ml SUBTOTAL ml


VARILLA #6 300.10 300.10
VARILLA #3 120.04 201.60 321.64

ACERO TRABES SOTANO RECUBRIMIENTO


TRABE EJE F y H VARILLAS #6 + 4#3 0.04
PIEZAS VARIILAS #6 ML/PZA TOTAL
8.00 30.01 240.08 ml
PIEZAS VARIILAS #3
4.00 30.01 120.04 ml LONGITUD DE TRABE (m)
ESTRIBOS #3 SECCION 30 x 70
PIEZAS ML/PZA TOTAL
150 1.34 201.60 ml

TRABE ml ESTRIBOS ml SUBTOTAL ml


VARILLA #6 240.08 240.08
VARILLA #3 120.04 201.60 321.64

ACERO TRABES SOTANO RECUBRIMIENTO


TRABE EJE L VARILLAS #6 + 4#3 0.04
PIEZAS VARIILAS #6 ML/PZA TOTAL
8.00 15.47 123.76 ml
PIEZAS VARIILAS #3
4.00 15.47 61.88 ml LONGITUD DE TRABE (m)
ESTRIBOS #3 SECCION 30 x 70
PIEZAS ML/PZA TOTAL
103 1.34 138.47 ml

TRABE ml ESTRIBOS ml SUBTOTAL ml


VARILLA #6 123.76 123.76
VARILLA #3 61.88 138.47 200.35
ACERO TRABES SOTANO RECUBRIMIENTO
TRABE EJE Q VARILLAS #8 + 4#3 0.04
PIEZAS VARIILAS #8 ML/PZA TOTAL
4.00 15.47 61.88 ml
PIEZAS VARIILAS #3
4.00 15.47 61.88 ml LONGITUD DE TRABE (m)
ESTRIBOS #4 SECCION 30 x 70
PIEZAS ML/PZA TOTAL
78 1.34 104.19 ml

TRABE ml ESTRIBOS ml SUBTOTAL ml


VARILLA #8 61.88 61.88
VARILLA #4 104.19 104.19
VARILLA #3 61.88 61.88

ACERO TRABES SOTANO RECUBRIMIENTO


TRABE T-2 VARILLAS #6 + 4#3 0.04
PIEZAS VARIILAS #6 ML/PZA TOTAL
6.00 2.97 17.82 ml
PIEZAS VARIILAS #3
4.00 2.97 11.88 ml LONGITUD DE TRABE (m)
ESTRIBOS #3 SECCION 30 x 70
PIEZAS ML/PZA TOTAL
15 1.34 20.44 ml

TRABE ml ESTRIBOS ml SUBTOTAL ml


VARILLA #6 17.82 17.82
VARILLA #4 0.00
VARILLA #3 11.88 20.44 11.88

ACERO TRABES SOTANO RECUBRIMIENTO


TRABE T-3 VARILLAS #6 + 4#3 0.04
PIEZAS VARIILAS #6 ML/PZA TOTAL
6.00 7.69 46.14 ml
PIEZAS VARIILAS #3
4.00 7.69 30.76 ml LONGITUD DE TRABE (m)
ESTRIBOS #3 SECCION 30 x 70
PIEZAS ML/PZA TOTAL
39 1.34 52.06 ml
TRABE ml ESTRIBOS ml SUBTOTAL ml
VARILLA #6 46.14 46.14
VARILLA #4 0.00
VARILLA #3 30.76 52.06 30.76

ACERO TRABES SOTANO RECUBRIMIENTO


TRABE EJE 7 VARILLAS #6 + 4#3 0.04
PIEZAS VARIILAS #6 ML/PZA TOTAL
8.00 40.07 320.56 ml
PIEZAS VARIILAS #3
4.00 40.07 160.28 ml LONGITUD DE TRABE (m)
ESTRIBOS #3 SECCION 30 x 70
PIEZAS ML/PZA TOTAL
201 1.34 269.01 ml

TRABE ml ESTRIBOS ml SUBTOTAL ml


VARILLA #6 320.56 320.56
VARILLA #3 160.28 269.01 429.29

ACERO TRABES SOTANO RECUBRIMIENTO


TRABE EJE 10 VARILLAS #6 + 4#3 0.04
PIEZAS VARIILAS #6 ML/PZA TOTAL
8.00 34.35 274.80 ml
PIEZAS VARIILAS #3
4.00 34.35 137.40 ml LONGITUD DE TRABE (m)
ESTRIBOS #3 SECCION 30 x 70
PIEZAS ML/PZA TOTAL
172 1.34 230.68 ml

TRABE ml ESTRIBOS ml SUBTOTAL ml


VARILLA #6 274.80 274.80
VARILLA #3 137.40 230.68 368.08
RIMIENTO GANCHO
0.04 0.10
0.05

TUD DE TRABE (m) 29.89

kg/ml TOTAL DE kg
2.25 675.23
0.56 179.16

RIMIENTO GANCHO
0.04 0.10
0.05

TUD DE TRABE (m) 29.89

kg/ml TOTAL DE kg
2.25 540.18
0.56 179.16

RIMIENTO GANCHO
0.04 0.10
0.05

TUD DE TRABE (m) 15.35

kg/ml TOTAL DE kg
2.25 278.46
0.56 111.59
RIMIENTO GANCHO
0.04 0.10
0.05

TUD DE TRABE (m) 15.35

kg/ml TOTAL DE kg
3.975 245.97
0.996 103.77
0.557 34.47

RIMIENTO GANCHO
0.04 0.10
0.05

TUD DE TRABE (m) 2.85

kg/ml TOTAL DE kg
3.975 70.83
0.996 0.00
0.557 6.62

RIMIENTO GANCHO
0.04 0.10
0.05

TUD DE TRABE (m) 7.57


kg/ml TOTAL DE kg
3.975 183.41
0.996 0.00
0.557 17.13

RIMIENTO GANCHO
0.04 0.10
0.05

TUD DE TRABE (m) 39.95

kg/ml TOTAL DE kg
2.25 721.26
0.557 239.11

RIMIENTO GANCHO
0.04 0.10
0.05

TUD DE TRABE (m) 34.23

kg/ml TOTAL DE kg
2.25 618.30
0.557 205.02

Vous aimerez peut-être aussi