INSPECTION AND TEST PLAN - DOC:DEW/ITP/02 Rev-0

PROJECT: Date:
REF# Description: Structural steel fabrication
Inspection by
SL.No Quality Control Activity Characteristic to be verified Control Documents Acceptance Criteria Verifying Documents/ Report

1.0 Preliminary Activities

2 Site Survey ( If applicable)

3.0 Material

4.0 Shop Fabrication

5.0 Welding

6.0 NDT

7.0 Final Inspection at shop

8.0 Final Inspection at site

1 of 2
INSPECTION AND TEST PLAN - DOC:DEW/ITP/02 Rev-0
PROJECT: Date:
REF# Description: Structural steel fabrication
Inspection by
SL.No Quality Control Activity Characteristic to be verified Control Documents Acceptance Criteria Verifying Documents/ Report

9.0 Quality Dossier

Remark:

Prepared by Reviewed by Approved by

Name : Name : Name :

Sign: Sign: Sign:

Date: Date: Date:

2 of 2