Vous êtes sur la page 1sur 4

WORK INSTRUCTIONS.

Procedure No :
xxxxxxxxx

Prepared By :
xxxxxx.

PROCEDURE FOR
Page :
PROOF LOAD TESTING 1 of 4
OF LIFTING TACKLES Approved By :
(xxxxxxxxxxx)
xxxxxxxxx

xxxxxxxxxxx xxxxxxxxx

Signature Date

xxxxx 00 1 Issuance of Procedure xxxxxxx


Doc. No. Revision Status Issue No. Description Date
Doc. No. : xxxxxx
PROCEDURE FOR PROOF LOAD TESTING OF Page No. : 2 of 4
LIFTING TACKLES (xxxxxx) Revision : 0
Date : xxxxxxx

INDEX

SECTION DESCRIPTION PAGE NO.


COVER SHEET 1
INDEX 2
1.0 SCOPE 3
2.0 VISUAL INSPECTION BEFORE LOAD TEST 3
3.0 NDE BEFORE PROOF LOAD TEST 3
4.0 PROOF LOAD TESTING 3
VISUAL INSPECTION AND NDE AFTER
5.0 4
PROOF LOAD TEST
6.0 MARKING AND CERTIFICATION 4
7.0 REFERENCES 4
Doc. No. : xxxxxx
PROCEDURE FOR PROOF LOAD TESTING OF Page No. : 3 of 4
LIFTING TACKLES (xxxxxx) Revision : 0
Date : xxxxxxx

1.0 SCOPE:

This Method of Statement details about Examination and Proof Load Testing of Lifting
tackles for xxxxxxxxxx project as per relevant standards, codes, and Client
specifications.

2.0 VISUAL INSPECTION BEFORE PROOF LOAD TEST:

 Unique Identification number of each tackle should be clearly marked


 The Lifting Points to be examined visually to ensure no cracking or deformity
has taken place.
 All structural welds shall be visually examined to ensure no cracking has taken
place.
 The external surface shall be visually examined for any damage.

3.0 NON DESTRUCTIVE EXAMINATION BEFORE PROOF LOAD TEST:

 All full penetration welds should be 100% Ultra sonic tested.


 All welds, other than full penetration welds to be 100% Magnetic particle
tested.
 All NDE shall be carried out by ASNT, Level II qualified technician.

4.0 PROOF LOAD TESTING

 Test Weight equal to the Proof load shall be applied by way of under slinging at
the required beam radius.
(Reference drawing: xxxxxxxxxxxxxxxxxx)
 Proof load shall be 1.25 times the specified Safe working load (SWL)
(As per ASME B.30.20)
 Calibrated load cell is used to ascertain the test weight used.
 Suitable, certified crane to be used for proof load test
 Proof load testing to be carried out using suitable slings and accessories.
 Proof load testing shall be carried out under the supervision of a LEEA certified
Doc. No. : xxxxxx
PROCEDURE FOR PROOF LOAD TESTING OF Page No. : 4 of 4
LIFTING TACKLES (xxxxxx) Revision : 0
Date : xxxxxxx

Testing engineer.
 Proof load shall be applied for 10 minutes and checked for any visible
deformations.
 In no circumstances shall the tackle be over-stressed or damaged during this
process.

5.0 VISUAL INSPECTION & NON DESTRUCTIVE EXAMINATION AFTER PROOF


LOAD TEST:

 After release of the test load, all welds shall be 100% visually checked for
cracks or deformities and the tackle is inspected for any excess
deformations.
 All lifting pad eye welds shall be 100% Magnetic particle tested after load
testing to ensure the soundness of the welds.

6.0 MARKING AND CERTIFICATION:

 Identification marking of the tackle and Safe working load shall be punch
marked in the tackle after successful completion of the proof load testing.
 Upon successful completion of the proof load test & examination, Testing
engineer shall issue the test Certificate.
 After completion of painting Safe working load shall be marked with Black
paint with minimum letter height of 150mm

7.0 REFERENCES

 ASME B 30.20
 Lifting tackle drawings: xxxxxxxxxxxxxxxxxxxxxxxxxx

**********************