BFD – IRR and MIRR

By Taha Popatia
A. Internal Rate of Return (IRR)

Explanation of IRR

L
O
IRR is the discount rate which delivers a zero NPV on a given project. It can also be thought of as the forecast
return for the project.

O
H
NPV

SC
P
O Discount Rate

S
ES
IRR

N
NPV is always inversely proportional to the discount rate as you can see above the NPV decreases as Discount
rate increases and at intersection point P NPV becomes zero.
SI
BU
Formula
IRR = L+ NPVL x (H – L)
NPVL – NPVH
TT

Where, L = Lower Discount Rate


H = Higher Discount Rate
R

NPVL = NPV at Lower Discount Rate


-A

NPVH = NPV at Higher Discount Rate

Steps for Computing IRR


tia

1. Calculate an NPV using a Discount rate.


2. Calculate another NPV using a different Discount rate.
pa

Note: Try to compute +ve & -ve NPVs because it will increase the accuracy of the answer if your first step
Po

gives you +ve NPV then just double the discount rate to find -ve NPV or vice versa. Remember it is not
compulsory to calculate +ve & -ve NPVs.
ha

3. Now, apply the IRR formula.

Decision Rule
Ta

 If a project IRR is greater than or equal to the Target rate of return or Cost of Capital then, the project
should be undertaken.
 If a project IRR is lower than the Target rate of return or Cost of Capital then, the project should be
rejected.

1|P ag e
BFD – IRR and MIRR
By Taha Popatia
Example 1

ABC Co. is considering to invest in a project Beta which will require an initial investment of $10,000. The Project

L
will generate $6000 cash inflow for 4 years. The company’s Cost of Capital is 11%. Evaluate the project on the

O
basis of IRR.

O
Solution

H
Step 1

SC
Discount
Present
Year Cashflows Factor
Value
10%

S
O (10,000) 1 (10,000)

ES
1-4 3,500 3.170 11,095

N
NPV 1,095
SI
BU

Step 2

Discount
Present
TT

Year Cashflows Factor


Value
20%
R

o (10,000) 1 (10,000)
-A

1-4 3,500 2.589 9,061.50


tia

NPV (938.50)
pa

Step 3
Po

IRR = 10 + 1095 x (20-10) 15.38%


(1095+938.5)
ha

The project should be accepted because IRR is greater than the Cost of Capital.
Ta

Advantages

 It considers time value of money.


 It uses all relevant cashflows.
 It helps to select those projects which increase shareholders’ wealth.

2|P ag e
BFD – IRR and MIRR
By Taha Popatia
Criticisms

 IRR produces multiple answers in case of non-conventional cashflows e.g. cash outflow, inflow and then

L
outflow it may be possible to calculate two IRRs.

O
Example 2

O
ABC Co. is considering to invest in a project Alpha which requires initial investment of 50,000 and the project will

H
generate cash inflows of 28,150 for 5 years and the 6th year of the project will require an outflow of 93,750 due

SC
to some restoration costs. The cost of the capital for the project is 10%. Calculate NPV & IRR.

Solution

S
Discount

ES
Year Cashflows Factor 10% PV

0 -50000 1 (50,000.00)

N
1 28150 0.909 25,588.35 SI
2 28150 0.826 23,251.90
BU

3 28150 0.751 21,140.65

4 28150 0.683 19,226.45


TT

5 28150 0.621 17,481.15


R

6 -93750 0.564 (52,875.00)


-A

NPV 3,813.50
If we calculate IRR using various discount rates then,
tia

Discount rate NPV


pa

0% -3000
3% 405
Po

6% 2488
9% 3594
12% 3978
ha

15% 3832
18% 3302
Ta

21% 2495
24% 1493
27% 359
30% -861

3|P ag e
BFD – IRR and MIRR
By Taha Popatia
NPV
IRR 1 2.56% 0
IRR 2 27.90% 0

L
O
NPV

O
5000

4000

H
3000

SC
2000

1000

S
0
0% 3% 6% 9% 12% 15% 18% 21% 24% 27% 30%

ES
-1000

-2000

-3000

N
-4000
SI
As you can see the project has a +ve NPV of 3813.5 but IRR is misleading because the negative sign cashflows
BU
occur twice.

 IRR is not helpful in choosing the best answer in case of mutually exclusive projects.
TT

Example 3
Suppose you have two projects A & B and both projects are mutually exclusive. The below graph shows
R

the IRR of these two projects. X is the cost of capital. On the basis of IRR, project B should be selected but
-A

Project A has the higher NPV and Project A can maximize the financers wealth by a greater amount.
tia
pa
Po
ha
Ta

4|P ag e
BFD – IRR and MIRR
By Taha Popatia
 It assumes that all cashflows are re-invested in the project at calculated IRR which may be not valid in
case of high IRR.

L
B. Modified Internal Rate of Return (MIRR)

O
O
MIRR is the IRR which would result without the assumption that project proceeds are reinvested at the IRR rate.

H
Why MIRR is preferred on IRR??

SC
 In case of non-conventional cashflows MIRR produces a single answer.
 MIRR assumes re-investment of cashflows are at cost of capital which is more realistic in case of having a
very high IRR.

S
 MIRR decision is in line with NPV decision so there are few chances of conflict.

ES
Formula

N
SI
BU
TT
R

Example 4
-A

ABC Co. is considering to invest in a new project. The initial investment required for the project is 4000 and it will
generate cash inflows of 2600, 1400 & 2000 at the end of year 1,2 & 3 respectively. The company cost of capital is
10%. Calculate NPV and MIRR.
tia

Solution
pa

NPV Calculation
0 1 2 3
Po

Project Cashflow (4,000) 2,600 1,400 2,000


Discount Factor
ha

10% 1 0.909 0.826 0.751


Ta

PV (4,000) 2,363 1,156 1,502

NPV 1021.8

5|P ag e
BFD – IRR and MIRR
By Taha Popatia

MIRR
0 1 2 3

L
Project Cashflow

O
(4,000) 2,600 1,400 2,000
Year 1 Cashflow

O
compounded @ 10% for 2
years 3146

H
Year 2 Cashflow

SC
compounded @ 10% for 1
years 1540

Modified Cashflows
(4,000) 6,686

S
ES
MIRR = [6686 ÷ 4000]1/3 – 1 = 18.7%

Alternatively, MIRR can also be computed by the below formula:

N
SI
BU

Where PVR = the PV of the return phase (the phase of the project with cash inflows)

PVI = the PV of the investment phase (the phase of the project with cash outflows)
TT

re = the cost of capital


R

n = number of years of the project


-A

If we continue with the example 4,


tia

PVR = 5022 [ 2363+1156+1502]


pa

PVI = 4000
Po

re = 10%

MIRR = [5022 ÷ 4000]1/3 x (1.1) – 1 = 18.7%


ha

MIRR & Non-Conventional Cashflows


Ta

Example 5

ABC Co. is considering to invest in a project Gamma which requires initial investment of 50,000 at year 0. There
will be a further cash outflow of 15,000 in year 1 and after that project will generate cash inflows of 28,150,
31,000, 24,000 & 10,000 for year 2, year 3, year 4 & year 5 respectively. The cost of the capital for the project is
8%. Calculate NPV & MIRR.
6|P ag e
BFD – IRR and MIRR
By Taha Popatia
Solution

NPV Calculation

L
0 1 2 3 4 5

O
Project Cashflow (50,000) (15,000) 28,150 31,000 24,000 10,000

O
Discount Factor 8% 1 0.926 0.857 0.794 0.735 0.681

H
PV (50,000) (13,890) 24,125 24,614 17,640 6,810

SC
NPV 9299

S
ES
MIRR
Investment Phase Return Phase
0 1 2 3 4 5

N
(50,000)
1
(15,000)
0.926
28,150
0.857
SI
31,000
0.794
24,000
0.735
10,000
0.681
BU

(50,000) (13,890) 24,125 24,614 17,640 6,810


TT

PVI PVR 73,189


63,890
R

MIRR = [73189 ÷ 63890]1/5 x (1.08) – 1 = 10.97%


-A

Or

Investment Phase Return Phase


tia

0 1 2 3 4 5
pa

(50,000) (15,000) 28,150 31,000 24,000 10,000


1 0.926 1.08^3 1.08^2 1.08 1
Po

(50,000) (13,890) 35,461 36,158.40 25,920 10,000


ha

PVI 107,539
63,890
MIRR = [107,539 ÷ 63,890]1/5 -1 = 10.97%
Ta

Criticisms

Just like IRR, MIRR is also a relative measure so it doesn’t consider size of the project.