PLANS APPROVAL DATE
BENT CAP PTFE BEARING
A The State of California or its officers or agents
Exp.
CIVIL
S
T
shall not be responsible for the accuracy or A
TE IA
N
completeness of scanned copies of this plan sheet. OF FOR
CALI
The Registered Civil Engineer for the project is responsible for the selection
and proper application of the component design and any modifications shown.
SEE NOTE 2
FORMED HOLE
CABLE FORMED HOLE
RESTRAINER
ANCHORAGE PLATE
TOTAL 5 ANCHORAGE PLATE
HOLE =
CABLE UNIT FORMED HOLE
CABLE YIELD
DISC SPRING INDICATOR
5"
1 PLATE
HOLE = 1"
"
PLATE
1
HOLE PLATE
Notes
PLATE
HOLE 1. The Formed Hole must be 6" and must be aligned to
1 form a straight line the entire length of the restrainers
R = 2" ´ 10x10x2" and be parallel to the girder. The Hole must be formed
with the Top of Hole 2" below the seat’s top main reinf.
1" HOLE TOTAL 5 During construction hole ends must be capped to prevent
EQUALLY SPACED debris intrusion.
BRIDGE NO.
BRIDGE STANDARD DETAILS STATE OF
-
The components of the Bridge Standard
NOTES TO DESIGNER
- DIVISION OF
xs7-040 July 2014 Details have been prepared under the
responsible charge of the Technical Owner,
- Place Restrainers between bearings. CALIFORNIA POST MILE
Remove these notes at PS&E -
ENGINEERING SERVICES
FILE NO. APPROVAL DATE
a registered civil engineer in the State
of California
- DEPARTMENT OF TRANSPORTATION CABLE RESTRAINER TYPE 1 (NEW)
REVISION DATES SHEET OF
Refer to: http://www.dot.ca.gov/hq/esc/techpubs/manual/bridgemanuals/bridge-standard-detail- FILE => xs7-040.dgn ORIGINAL SCALE IN INCHES UNIT: DISREGARD PRINTS BEARING
sheets/index.html FOR REDUCED PLANS EARLIER REVISION DATES
USERNAME => s136236 TIME PLOTTED => 07:27 DATE PLOTTED => 12-JUL-2016 0 1 2 3 PROJECT NUMBER & PHASE: CONTRACT NO.: 4-14-14 7-8-16