Vous êtes sur la page 1sur 6

CHAPTER THREE: BILL OF ENGINEERING

MEASUREMENTS AND EVALUATION (BEME)

Bill of Engineering Measurement and Evaluation ( BEME)


Project: 2KM LINK ROAD AT OPOLO-EPIE YENAGOA. BAYELSA STATE.

Client: NIGER DELTA DEVELOPMENT COMMISSION(NDDC)


Item Description QTY  UNITY RATE  AMOUNT 
( ₦:K) 

1 General Items        

1.01 Temporary Office Work, Shed & Store:    


Include the provisional sum of five hundred    
thousand naira only for the construction of    
temporary office, work shed and store; and    
bring to site one caravan complete with air    
conditioning system and toilet facilities; item item 500,000  500,000.00 
demolish and cart away wooden structure
from site and demobilize caravan on
completion.
1.02 Office Equipment:        
Include the provisional sum of One Hundred        
and f        
 
Fifty Thousand naira only for the equipping      
of project office with all necessary office        
equipment computers, printers, photocopiers, item  item  150,000  150,000.00 
laminators, etc and office furniture;
demobilize on completion.
1.03 Watching  and lighting:         
Include the provisional sum of Four Hundred         
Thousand naira only for effective security and  item  item  400,000  400,000.00 
lighting throughout the duration of the work. 

          
 To Collection  1,050,000.00 









11 
 
Bill of Engineering Measurement and Evaluation ( BEME)

Project: 2KM LINK ROAD AT OPOLO-EPIE YENAGOA. BAYELSA STATE.

Client: NIGER DELTA DEVELOPMENT COMMISSION(NDDC)

Item Description QTY UNIT RATE AMOUNT

(₦:K)

1.04 Water for the work:       
     
Include  the  Provisional  sum  of  Two  Hundred       
and Fifty Thousand naira only for the provision         
of clean portable water for the works.  item  item  250,000  250,000.00 
1.05 Safety and Insurance   
 
Include  the  Provisional  sum  of  Five  Hundred   
Thousand  naira  only  for  all  safety  elements   
required to protect personnel from injuries of   
any  sort  including  provision  of  workmen   
insurance  with  a  reputable  insurance  item 
company.  item 500,000 500,000.00

1.06 Medical         
       
Include the Provisional Sum of Three Hundred         
Thousand  naira  only  for  the  provision  of         
medical  facilities  for  workmen,  including         
retainer ship with a reputable clinic.  item  item  300,000  300,000.00 
1.07 Progress Photographs         
       
Include  the  Provisional  Sum  of  Thirty         
Thousand naira only for progress photographs         
throughout the duration of the works.  item  item  30,000  30,000.00 
          
   
   
   
To Collection  1,080,000.00 

12 
 
Bill of Engineering Measurement and Evaluation ( BEME)

Project: 2KM LINK ROAD AT OPOLO-EPIE YENAGOA. BAYELSA STATE.

Client: NIGER DELTA DEVELOPMENT COMMISSION(NDDC)

Item Description QTY UNIT RATE AMOUNT

(₦:K)

2.00 EARTHWORKS:       
 
 

2.01 Clear site of all vegetation, debris, grasses and   
2
grub up their roots.  22,000 m 100 2,200,000.00

2.02 Excavate to remove vegetable top soil average         
300mm  6,000  m3  700  4,200,000.00 
2.03 Excavate drainage trench average 300mm  1,200  m3  700  840,000.00 

2.04 Backfill  with  sharp  sand  as  embankment  18,000 m3  3,000  54,000,000.00 
average 800mm 
 
3.00 REINFORCEMENT         

High  Yield  Steel  Bar  Reinforcement 


to BS.4461 
3.01 12mm  diameter  High  yield  tensile         
 
bar for kerbs, drainage and culverts.  37  tonne  250,000  9,250,000.00 

3.02 A142 Square mesh  18,000 m2  2,000  36,000,000.00 

4.00 SAWN FORMWORK         
 
4.01 Drainage channel  15,000 m2  1,500  22,500,000.00 

4.02 Culverts  280  m2  1,500  420,000.00 

4.03 kerbs  45  m2  1,500  67,500.00 

          
   
   
To Collection  129,477,500.00 

13 
 
Bill of Engineering Measurement and Evaluation ( BEME)

Project: 2KM LINK ROAD AT OPOLO-EPIE YENAGOA. BAYELSA STATE.

Client: NIGER DELTA DEVELOPMENT COMMISSION(NDDC)

Item Description QTY UNIT RATE AMOUNT

(₦:K)

5.00 CONCRETEWORK:       
 
 

5.01 Plain in‐situ concrete (1:2:4‐19mm aggregate)   
for drainage  1,500  m3 40,000 60,000,000.00

5.02 Ditto culverts         
90  m3  40,000  3,600,000.00 
5.03 Ditto kerbs  360  m3  40,000  14,400,000.00 

5.04 Cement for sub base treatment   250  tonne  60,000  15,000,000.00 


 
5.05  Plain in‐situ concrete (1:2:4‐19mm aggregate)         
for pavement   
3,600  m3  40,000  144,000,000.00 

         ` 
   
   
   
   
   
   
   
   
To Collection  237,000,000.00 

14 
 
Bill of Engineering Measurement and Evaluation ( BEME)

Project: 2KM LINK ROAD AT OPOLO-EPIE YENAGOA. BAYELSA STATE.

Client: NIGER DELTA DEVELOPMENT COMMISSION(NDDC)

Item Description QTY UNIT RATE AMOUNT

(₦:K)

 Collections       
 
 

 Page 1   
  1,050,000.00

 Page 2         
    1,080,000.00 
 Page 3        129,477,500.00 

         237,000,000.00 
Page 4 
  SUBTOTAL        368,607,500.00 

 Add Vat 5%        18,430,375.00 

         ` 
18,430,375.00 
Add 5% Contingency 
          
   
   
TOTAL ESTIMATED COST  405,468,250.00

FOUR  HUNDRED  AND  FIVE  MILLION,  FOUR  HUNDRED  AND  SIXTY  EIGHT  THOUSAND,  TWO  HUNDRED  AND 
FIFTY NAIRA ONLY. 

15 
 
BIBLIOGRAPHY

Cobb, F. (2014), Structural engineer’s pocket book, 3rd ed, CRC Press Taylor &
Francis Group, London.

Garber J. N, Hoel A. L. (2002), Traffic & Highway Engineering, International


Student Edition, Thomson Learning, Canada.

Gupta B. L, Gupta A. (2003), Roads, Railways, Bridges, Tunnels & Harbour


Dock Engineering , 5th ed, Standard Publishers Distributors, Delhi.

Oyenuga O. V. (2009), Design of Estate Infrastructures Road & Drainage,


ASROS LTD, Lagos.

Soughtgate F. H, Deen C. R, (1984), Thickness Design Procedure for Portland


Cement Concrete Pavements , Transportation Research Program University of
Kentucky, Kentucky.
 

16 
 