Malitubog-Maridagao Irrigation Project Phase II

Project Background

Source: NIA XII (November 2016)

Project Reconfiguration

USD 106.62 Million / PHP 5.44 Billion


Project Cost
Exchange rate: 1 USD = 51.07 (as of Sept. 29, 2017)

Project Location North Cotabato, Region 12 and Maguindanao, ARMM

Funding Source ODA, JICA loan

Loan Amount To be determined

Implementing Agency National Irrigation Administration (NIA)

The project, as reconfigured and submitted by the National


Project Description
Irrigation
Administration (NIA) to the ICC, involves the construction of
irrigation
canals in the Upper Malitubog Area (2,206 ha), Lower Malitubog
Service area (6,590 ha) and Pagalungan Extension Area (988 ha)
14 November 2016 – The NEDA Board confirmed that ICC
approval of revised scope and cost of the Project.

28 September 2016- The ICC-CC approved the proposed changes


on the project and provided further instructions to DA/NIA on the
funding source of the project.

20 December 2010 - The NEDA Board confirmed the ICC approval


Notable changes
of the project.

27 November 2009 - The ICC-CC conditionally approved the


project.

12 October 2009 - The ICC-TB conditionally endorsed the project.

25 June 2009 - The ICC-TB discussed the project.


Preparatory survey was dispatched last May 2017, the results of
4Q 2017 Status which were presented to the agency in July 2017.
The DPWH has yet to submit the project for ICC processing.

Target Completion 2019

Source: National Economic & Development Authority (September 30, 2017)


Project Layout

Figure 1 Malitubog – Maridagao Irrigation Project Layouts


Project Status (2011 – 2015)