Given:
Assuming:
Materials
Side Walls
4 in Corkboard
4 in Corkboard
Ceiling
4 in Concrete
4in Corkboard
Floor
4in Corkboard laid on 5in Slab and finished with 3in Concrete
Solution:
𝑄 = 𝐴𝑈𝐷
Where: A= Area
U= Overall Capacitance
𝐵𝑡𝑢
Ceiling 0.069ℎ𝑟 𝑓𝑡𝟐 ˚𝐅
𝐵𝑡𝑢
Floors 0.066ℎ𝑟 𝑓𝑡𝟐 ˚𝐅
𝐵𝑡𝑢
West Wall = 979.67 ft2 X 0.066ℎ𝑟 𝑓𝑡𝟐 X64.5 ˚F = 4170.46
˚𝐅
𝐵𝑡𝑢
South Wall = 1884 ft2 X 0.066ℎ𝑟 𝑓𝑡𝟐 X36 ˚F = 4476.28
˚𝐅
𝐵𝑡𝑢
East Wall = 979.67 ft2 X 0.066ℎ𝑟 𝑓𝑡𝟐 X36 ˚F = 2327.7
˚𝐅
𝐵𝑡𝑢
Ceiling = 3498.15 ft2 X 0.069ℎ𝑟 𝑓𝑡𝟐 X52.2 ˚F = 12,599.64
˚𝐅
𝐵𝑡𝑢
Floor = 3498.15 ft2 X 0.066ℎ𝑟 𝑓𝑡𝟐 X52.2 ˚F = 12,051.83
˚𝐅
𝑩𝑻𝑼
43,148.72 𝑯𝑹
𝑩𝑻𝑼
Q= 1,035,569.28 𝟐𝟒 𝒉𝒓𝒔
Given:
Assuming:
Materials
Side Walls
4 in Corkboard
4 in Corkboard
Ceiling
4 in Concrete
4in Corkboard
Floor
4in Corkboard laid on 5in Slab and finished with 3in Concrete
Solution:
𝑄 = 𝐴𝑈𝐷
Where: A= Area
U= Overall Capacitance
𝐵𝑡𝑢
Ceiling 0.069ℎ𝑟 𝑓𝑡𝟐 ˚𝐅
𝐵𝑡𝑢
Floors 0.066ℎ𝑟 𝑓𝑡𝟐 ˚𝐅
𝐵𝑡𝑢
West Wall = 602.96 ft2 X 0.066ℎ𝑟 𝑓𝑡𝟐 X 25.2˚F = 1002.84
˚𝐅
𝐵𝑡𝑢
South Wall = 979.67 ft2 X 0.066ℎ𝑟 𝑓𝑡𝟐 X 25.2˚F = 1629.39
˚𝐅
𝐵𝑡𝑢
East Wall = 602.96 ft2 X 0.066ℎ𝑟 𝑓𝑡𝟐 X51.7˚F = 2057.42
˚𝐅
𝐵𝑡𝑢
Ceiling = 1119.56 ft2 X 0.069ℎ𝑟 𝑓𝑡𝟐 X39.6˚F = 3059.09
˚𝐅
𝐵𝑡𝑢
Floor = 1119.56 ft2 X 0.066ℎ𝑟 𝑓𝑡𝟐 X39.6 ˚F = 2926.08
˚𝐅
𝑩𝑻𝑼
13,888.33 𝑯𝑹
Total Wall Gain Load in Production Area
𝐵𝑇𝑈
= 13,888.83 𝐻𝑅 (24 hrs.)
𝑩𝑻𝑼
Q= 333,319.92 𝟐𝟒 𝒉𝒓𝒔
𝑩𝑻𝑼
Q= 1,368,889.2 𝟐𝟒 𝒉𝒓𝒔
Given:
Air Change Load = Inside Volume X Air Changes X Air Change Factor
Finding Volume:
By Interpolation:
𝑋 −0.2
= 25000
535.57
−0.2 ( 535.57)
X= 25000
X = -0.00428
Assuming 50 % Humidity
By Interpolation:
𝑋 0.18
=
−2 −5
X= 0.072
𝑩𝒕𝒖
Air Change Load = 10,323.54 𝟐𝟒𝒉𝒓𝒔
𝑩𝒕𝒖
Load = 14,774.4 𝟐𝟒 𝒉𝒓
30 950
23 x
20 1050
By Interpolation:
𝑋 100
=
−7 −10
−7 ( 100)
X=
−10
X = 70
= 950 + 70
𝑩𝒕𝒖
= 1020 𝒉𝒓
𝑩𝒕𝒖
Q= 30,600 𝒉𝒓
Sensible Heat
m = 20,000 kg/day
𝑩𝒕𝒖
c = 1 𝒍𝒃˚𝐅
∆t = 55.4 ˚F to 30.2 ˚F
Q1 = mc∆t
𝒌𝒈 𝒍𝒃 𝑩𝒕𝒖
Q1 = (20000𝒅𝒂𝒚) (2.205 𝒌𝒈)( 1 𝒍𝒃˚𝐅)( 55.4 ˚F – 30.2 ˚F)
𝒃𝒕𝒖
Q1 =1,111,320𝒅𝒂𝒚
Latent Heat
Given:
m = 20,000 kg/day
𝑩𝒕𝒖
Lf = 144 𝒍𝒃
Q2 = m L f
𝒌𝒈 𝒍𝒃 𝒃𝒕𝒖
Q2 = (20000𝒅𝒂𝒚) (2.205 𝒌𝒈) (144 )
𝒍𝒃
𝑩𝒕𝒖
Q2 = 6,350,400 𝒅𝒂𝒚
Sensible Heat
m = 20,000 kg/day
𝑲𝑱
c = 2.108 𝒌𝒈 𝑲 (Specific heat of ice)
∆t = 55.4 ˚F or 13 ˚c
Q3 = mc∆t
𝒌𝒈 𝑲𝑱
Q3 = (20000𝒅𝒂𝒚) (2.108𝒌𝒈 𝑲)( 286K)
𝑲𝑱 𝟎.𝟗𝟒𝟖 𝑩𝒕𝒖
Q3 =12,057,760 𝒅𝒂𝒚 ( )
𝟏 𝑲𝑱
𝒃𝒕𝒖
Q3 =11, 430,756 𝒅𝒂𝒚